Glebe Way - possible contraflow
Cycling against the direction in Glebe Way allows access from toucan in Staines Rd to bridge over A316.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Paul L // 0 threads
Cycling against the direction in Glebe Way allows access from toucan in Staines Rd to bridge over A316.
Created by Paul L // 0 threads
A contraflow here would make it easier to cycle from Bushy Park to Kingston Bridge.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Andrew Woodward // 0 threads
More cycle parking capacity is required in Sheen. This would be a good location for more capacity.
Created by Andrew Woodward // 1 thread
More cycle parking required in Sheen - this is a good location for some more capacity.
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 0 threads
Parents with children on school run frequently cycle on pavements on this stretch of road due to the hostile road conditions - in particular high vehicle speeds & lack of segregated cycle lanes.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly. Cars frequently speed up to 40mph on approach to this crossing.
Created by Andrew Woodward // 0 threads
LCN 37 provides a quiet route from Upper Richmond Rd West to Sheen, Mortlake & Barnes. To follow it eastbound the sign post for the left turn into Denehurst Gardens is located high up on the opposite carriageway - see top right in the photo. This is a completely obscure sign that 99% of cyclists will miss.
Created by Andrew Woodward // 1 thread
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 0 threads
There is short one way stretch here - this would be easy to make 2 way for cyclists and is key to creating a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Kingsway to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner. It would also give residents of Kingsway a legal cycle route that does NOT force them into Clifford Ave.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Somerton Ave to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner.
Created by velocipedus@gmail.com // 1 thread
University Technical College (UTC) Cambridge is to be launched at the Long Road 6th From site.
The UTC will open in new build facilities in September 2014 and will deliver a technical education to 670 students aged 14 to 19
It is a collaboration of Cambridge University Health Partners, Cambridge Regional College, Babraham Institute, Napp Pharmaceuticals, Medical Research Council, Wellcome Trust Sanger Institute, Long Road Sixth Form College, Parkside Federation Academies, Cambridge Cleantech, Cambridgeshire County Council, East of England NHS, Anglian Water, The Cube, AmeyCespa
Public Exhibition 11 April 2013
4pm to 8pm
Long Road Sixth Form College
Cambridge Regional College in association with Long Road Sixth Form College, their industry partners and Cambridge University Health Partners are developing designs for an exciting new University Technical College on the Long Road Sixth Form College site.
Project Manager is Laurence Wells
c/o Cambridge Regional College
Kings Hedges Road
Cambridge
CB4 2QT
Tel 01223 418502
Created by Sam Saunders // 1 thread
The barrier where Malago Greenway joins Cotswold Road/Windmill Hill is unreasonably restrictive - not just to tricycles, cargo and trailer bikes but also to baby buggies and mobility aids. The low hoop presents an unnecessary hazard to anyone with less than good eyesight.
Created by christhebull // 1 thread
Alright folks, if we're going to get the whole "Freeways and Greenways" network off the ground than we need to make sure we know what the existing routes are like (as some of us know certain parts of the city better than others). Here is my take on this section of the Frome Greenway:
1) The route is fairly direct and a lot flatter than the road through Stapleton past Colston's School, it is also free of motor traffic
2) Part of the route twists and turns *right next to* a lake and is shared by dog walkers. Whilst I recognise that this is meant to be a relatively leisurely route through a park, we don't want anybody taking an unexpected swim. The path also floods after heavy rainfall.
3) The lakeside stretch is particularly hazardous at light. To cut down on energy costs, movement activated lights could be installed on an ideally re-aligned path.
4) The route loses cohesiveness near the M32 junction. Improvements to the path and to signage are needed to direct cyclists to the Stapleton Road shared use section.
5) One of the bridges is exceptionally narrow (haven't measured, but can't be more than 1 metre) and is only fit for single track use
6) At the gated access off Wickham Glen, there is a passage to the side which is filled with loose gravel which gives poor traction on cycles as well as an open drainage channel which is a trip hazard on foot and bike
Overall the route already has strong potential to form a quality part of the greenway network, but these issues should be addressed as part of the overall network creation.
Created by Sam Saunders // 1 thread
New lights and crossings have been installed and pedestrians have recently been given a much safer way to cross Berkeley Place from west to east. The build-out near the end of Procathedral Lane has narrowed the roadway and made the pedestrian crossing time much shorter than it was. The two traffic lanes heading north east out of Berkeley Place are each now reduced to about 2.9 metres wide, leaving very little, or no space for a vehicle to pass a cyclist or for a cyclist to approach the ASL when traffic is stationary. The upward incline can make this even more awkward for a cyclist who needs to stop and then restart from a position behind or alongside vehicles south west of the build-out.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by MB // 1 thread
Access for cyclists, pedestrians with buggies or wheelchairs is poor here. Pavement is not flush to carriageway, barriers effectively block access & there are oftern cars parked too. As a part of the 'London Cycle Network' (74) it is substandard. If the route is intended for cyclists, it should be made accessible to them. Other users (car drivers) should be prevented from blocking it.
In addition, there is a 'cyclists dismount' sign!
Created by Adam Edwards // 0 threads
Stanbroughbury is the new housing area proposed by Gascoyne-Cecil Estates (Hatfield House) in the area north of Hatfield Garden Village. The suggested route above would pass through the housing.
The route would directly link the new housing to Hatfield Station via a cycling and walking route of about a mile. To achieve this requires a new bridge over the A1(M) and Comet Way and makes use of the handy gap in the housing into the Birchwood estate at this point. As the alternatives for cars are a longer way round via Wellfield Road or via Stanborough, this new route would give waling and cycling a time advantage which would therefore incentivise use.
The route assumes a second entrance to Hatfield station at the north end of platforms 2/3 either onto Beaconsfield Road or St Albans Road East. This will be needed anyway as demand at the station increases. Opening this second entrance will also encourage walking to and from the north and west of Hatfield as it will shorten walking times quite considerably. This second entrance should be for walking and cycling only.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Harmston Rise.
Inadequate drainage.
Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.
Created by Paul Gasson // 1 thread
From the commonplace introduction:
"Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
The Highams Park Town Centre scheme area has over 6,500 addresses and includes the area framed by North Circular Road, Hatch Lane, Woodford New Road and other minor roads. We want to make it easier for you to walk and cycle local journeys should you choose to. We also want to improve the look and feel of the area, making it an even more enjoyable place, boosting business and giving residents a sense of pride in their community."
Created by Heather Rainbow // 1 thread
Planning application 15/02303/FUL is to make Long lane open to motor vehicles so that they can reach 10 new houses on Pyotts Hill House.
This will be debated at 6.30pm on Wednesday 10 August at the Civic Offices Basingstoke.
Cycle Basingstoke has already objected because the road along Long lane is only 3metres wide and pedestrians, cyclists, lorries and cars will have to share this space.
There is good access from Lily Mill Chine
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Cycling Dumfries // 0 threads
There is now a nice cycle path that takes you from the river away from Devorgilla bridge, but there is no easy way to go from there to the College Street cycle track or Terregles Street as both Market Square and Howgate Street are one-way going the other way. Adding an 'except cycles' sign and allowing contraflow cycling along Market Square (which is not a fast or busy road), combined with a crossing across Buccleuch St on the east side of the street would provide an alternative route through town when the Whitesands is closed (or the Loreburn Bridge). At the moment, to get across Buccleuch street you have to cross in three cycles of the light and there are railings preventing pedestrian and bike access to College Street. This would also benefit pedestrians.
At the bottom of South Avenue, the road turns into a short cycle track. There is no dropped kerb.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Penrhyn Rd & Surbiton Rd. Open until 17th November.