Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from offices (B1) to dwellinghouses (C3)
Tom McKeown // 1 thread
Access to Impington Village College has not been looked at in any detail since the college opened in 1939. What issues are there for cycling to the college? What opportunities are there to make improvements?
Created by Jean Dollimore // 1 thread
The main proposal is for a new Zebra crossing outside the Harmood Children’s Centre
The new zebra will be 6.5m wide and replaces a 12+ m wide crossing with a pedestrian island. The consultation says: “Reducing the carriageway width can also have a traffic calming effect.
Space will also be provided for rain gardens (SUDs) and cycle parking for 6 to 8 bikes
The other proposal is to provide a temporary bus stand for the 27 bus during the Morrisons development and to relocate the affected parking bays. The new bus stand will be beside the Denton residential block at the northern end of Ferdinand Street.
Created by Roxanne (CEO) // 1 thread
https://www.cambridgesciencepark.co.uk/cambridge-science-park-north/
Trinity College has begun to consult on a proposal to transform a parcel of adjacent agricultural land to the east of Histon and Impington into Cambridge Science Park North. The proposal is at early stages with a submission having been made into the Call for Sites process which forms part of the Greater Cambridge local plan
Science Park North will be created on land which is currently used for farming, but is located close to the Park and Ride and the waste transfer site which are both accessed from the A10.
It is located close to the Area Action Plan land to the east and the Project Team is working closely with AAP Members on a number of areas which are of mutual interest. It is anticipated that the timescale for the AAP process will match the development timescale for the Greater Cambridge Local Plan and the CSP North timetable is planned to complement this.
CSP North is also located close to Cambridge Regional College, which sits between the existing science park and the proposed expansion land. Discussions are underway with CRC with the ambition of providing facilities for greater collaboration in the future which could be in the form of expansion but also education and work apprenticeship schemes for future students of the CRC.
The transport strategy for Cambridge Science Park North is targeted at complementing the improvement plans for the existing science park. The initial aim is to ensure that there is no increase in car use across the two sites, with a medium and long-term target of reducing car usage across the two sites completely.
The early ideas are to provide a consolidated space for parking which will serve both Science Park sites, which will be linked to a mobility hub providing pedestrian, cycling, autonomous vehicle and sustainable mass transit facilities for onward travel. These will utilise existing infrastructure such as Mereway Cycle Route and the Guided Busway as well as proposed infrastructure such as The CAM.
These proposals will improve access to the whole of Cambridge, reducing current traffic on the Milton Road by providing a hub serving the wider AAP area including access to Cambridge North Station.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Cambridgeshire communities must work together for a green recovery from Covid-19 and to play our part in reducing carbon emissions. Zero Carbon Streets is the campaign that brings local groups together to do this.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 201309: Demolition of existing structures & redevelopment to construct 4 No. three bed residential dwellings (Class C3) with associated garages, car parking & access. All matters r
Created by Steven Moseley // 1 thread
Erection of new dwelling (previously approved under 172115)
Created by Steven Moseley // 1 thread
he Essex County Council (St Nicholas Street, Colchester) (One Way) Order 202*Statement of ReasonsSummary of the LocationSt Nicholas Street, Colchester, illustrated on drawingref. 169_HAT_GA_110 Rev. B.Reasons for the Proposed ChangesThis one-way restriction is part of a wider public realm improvement project proposed by Colchester Borough Council for the area around St Nicholas Square. For details of the proposed development, visit their webpage https://www.colchester.gov.uk/info/cbc-article/?id=KA-035711Benefits of the Proposed ChangesTo enhance the public realm in St Nicholas Square, and minimise carriageway to create enhanced footways and space availablefor outdoor seating. The key aims of the St Nicholas Square project are to:• Create a more pedestrian friendly environment, less dominated by car anddelivery traffic• Create more outdoor seating space for cafés and restaurants to spill out• Createspace for market stalls and events to happen• Ensure the space is accessible to all usersA number of local Councillors have been supportive of the scheme and the overall ambition to create a more pedestrian friendly and open square, which supports local businesses through the creation of more external seating areas, more space for markets and events, and increased footfall in the long term.CBC have secured central government funding enabling the project to move forward.
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Steven Moseley // 1 thread
Proposed Change of Use From Stables to Medical Clinic (class E) & Refurbishment of Structure. Clinic to be used as a private GP clinic and for other allied medical professionals like Physiotherapy. Existing vehicular access to be upgraded.
Created by Steven Moseley // 1 thread
Change of use of stable/outbuildings/annexe to form a single dwelling
Created by Steven Moseley // 1 thread
Erection of four bedroom detached house
Created by Steven Moseley // 1 thread
Erection of 2 No detached single storey dwellings with attached garages, existing dwelling and garage to be demolished and alterationsto existing vehicular access
Created by Steven Moseley // 1 thread
Redevelopment of site to residential comprising of 9 flats.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.