Swiss Cottage
Large gyratory, which needs removal and replacement with cycle-friendly measures.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
Created by cobweb // 1 thread
The proposal is to retain the CB1 café and reconfigure the two upper floors to include 10 studio flats.
Created by Rohan Wilson // 1 thread
New development:
Phase 1 reserved matters for the layout, scale and appearance of 201 dwellings, hard and soft landscaping and associated infrastructure and works including a means of access from Church Road
Martin Lucas-Smith // 10 threads
The route from the Royal Cambridge Hotel junction to Newmarket Road is a catalogue of hostile junctions, squeezed road situations, narrow cycle lanes, high collisions, and slow progress through this crucial part of the ring road. What is needed is a total overhaul of this route to add either a Danish or Dutch -style cycle route (2m+ could be achieved in most sections, with only one or two sections a squeezed 1.5m) that would encourage a massive shift of people from cars to bikes. To be clear: this is a proposal that a proper, strategic cycleway, that forms a coherent, uninterrupted route is needed, not bits of random infrastructure. See: http://www.camcycle.org.uk/newsletters/103/article4.html
Created by cobweb // 1 thread
I noticed today that there were notices on the racks outside Trinity College asking users to remove their bikes by 27th June but not giving a reason.
Martin Lucas-Smith // 1 thread
12/0783/FUL Barclays Bank, Bene't Street
Change to approved scheme 11/1421/FUL
to omit 21 bike store and replace with fitness room and laundry
Needs checking out.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Gregory Williams // 1 thread
Overgrown vegetation encroaching on the cycle path.
Created by Gregory Williams // 1 thread
A dropped kerb is needed for the cycle path where it links to Star Lane at the back of the retail park, near Gordon Road.
Created by Jean Dollimore // 1 thread
Camden Council is planning to remove the Brunswick Square roundabout and replace it with a cross roads. They have support from Marchmont Street residents association. The space reclaimed from the roundabout will be added to Brunswick Square
This roundabout is on a north-south cycle route along Judd Street, Hunter Street, Lambs Conduit Street and Red Lion Street which is currently being improved by LB Camden and will soon be signed.
Some manoeuvres on the roundabout can be hazardous for cyclists and we have already told LB Camden that we support this scheme.
They have suggested various enhancements:
- raised table at the junction
- zebra crossings over all four arms
- raise the road north of the junction to footway level (a 'shared space')
- close Lansdowne Road to motors and make Grenville Street two way
We have been asked to tell them what would be the best scheme for cyclists, to suggest what to put in the space reclaimed (e.g trees, bike stands) and to provide a drawing.
See Camden's web page:
https://www.wearecamden.org/brunswicksquare/assets/documents/brunswick-square-roundabout-im-2
Created by Jean Dollimore // 1 thread
email received (30/6/12): I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email receivedr: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email from Nick Miller: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
Created by Gregory Williams // 1 thread
The Drapers Mill cycle route sign should be pointing southward into Grosvenor Place, instead of eastward along Marine Gardens.
Created by Gregory Williams // 1 thread
The cycle route signs for the Canterbury High School to Archbishop's School cycle route are missing at each end of Harcourt Drive.
Created by Gregory Williams // 1 thread
This short section of cycle route needs cyclists to dismount for a narrow section of path. There's plenty of room to widen the path. The sightlines for crossing the road here could also be improved.
Martin Lucas-Smith // 3 threads
Two-way cycling needs to be permitted in streets in the Newtown area.
How can we welcome new students / visitors to Cambridge?
Ideas include:
* Stall events
* Welcome to Cambridge bike ride
* Talks
* Dr. Bike / Bike sale / Trade-in / Bike Harvest
Martin Lucas-Smith // 4 threads
Hills Road is not the best welcome to the City for cycling that it could be. It is congested, busy, with problems of cars in cycle lanes, and in general a poor streetscape.
Created by David Earl // 1 thread
The erection of 11 no. two bed flats, 206 sq m of commercial floorspace (A3) together with associated cycle parking and bin storage following demolition of existing single storey workshop.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.