210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
Created by Roxanne (CEO) // 1 thread
How should the junction with Glisson Road and Hills Road be improved to improve safety for people cycling, walking and driving?
Created by Edward Taylor // 1 thread
This is an ideal solution to the flow at Landbeach road.
Mobility needs from Landbeach, highlighted in Milton community are to provide cycle crossing at the A10 for school kids and parents.
Created by Dominic Fee // 1 thread
Westminster City Council made an experimental traffic order on 8 February 2021, which will have effects including to:
"(a) prohibit all vehicles from entering or proceeding in Vigo Street, between Savile Row and Sackville Street (except pedal cycles which will be able to travel in both directions);
(b) introduce one-way working south-westbound in Burlington Gardens, between Savile Row and Cork Street (except pedal cycles);
(c) reverse the one-way working in Sackville Street so that it applies in a northwestbound direction"
Created by Steven Moseley // 1 thread
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
Created by Steven Moseley // 1 thread
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
Created by Steven Moseley // 2 threads
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
cyclescape user // 0 threads
The current hardcore path is often not usable for walking / cycling during wet weather. The path is difficult to pass through due to water on the surface. A new tarmac option would be much better. A new drop kerb on Bell Court and widened access would also help improve this route. Note the path gives access to a local football pitch as well as a local park. Cycling and walking in the area would increase if this issue was fixed.
sound+fury // 1 thread
Proposal to demolish a couple of houses on Brooklands Avenue.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 121272 for the construction of 201 dwellings.
Parcels R01, R02 & R03, G1, G3, G4 And Osf1 North Colchester Urban Ext, Mile End Road, Colchester
Created by Steven Moseley // 1 thread
Application for approval of details reserved by conditions 5, 15, 16, 17, 19, 20, 21, 22 & 23 of 193133 (Phasing, CMS, Remediation, levels, finishes, landscaping, cycles, loading.)
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from Offices (Class B1(a)) to 10no. dwellinghouses (Class C3)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Extensions and internal alterations to create 7 no. new apartments including new detached 1 bedroom unit in rear curtlilage with off road parking for 2 vehicles and bins and cycle store
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for development at Land South Of Coldhams Lane, Cambridge
Land South Of Coldhams Lane Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing structures, erection of new building containing nine self-contained residential units, with associated parking, hard and soft landscaping works, and associated works and infrastructure
509 Coldhams Lane Cambridge CB1 3JS
Created by John Chamberlain // 1 thread
Eastbound Cycle Lane on Tavistock Place closed for 2 weeks
Created by Roxanne (CEO) // 1 thread
How can cycling on Trumpington Road be improved, especially to make it safe for people cycling to local schools?
Created by Alex Jenkins // 1 thread
The Council is committed to supporting Brick Lane’s recovery from the Covid-19 pandemic and wants to use the investment of the Liveable Streets programme to support Brick Lane businesses and the local community in months and years ahead.
Future Visualisation of Brick Lane(External link)
These proposals have been developed on feedback based on residents, businesses and local community. We are consulting on these proposals now, so that if they are supported we can implement them in time for Summer to benefit businesses, the local community and visitors.
Our proposals:
What is being proposed?
Three schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Our proposals include environmental enhancements and traffic calming measures to improve accessibility and safety for all and to encourage active travel.
Why are these proposals important?
Brick Lane is an iconic area of London that attracts over 18,500 pedestrians every day. This space is also shared with over 4,000 vehicles, many of which use Brick Lane to cut through the area. This means they are not visiting local businesses, schools or places of worship but are significant contributors to the already unacceptable levels of air pollution and congestion along Brick Lane.
School streets are central to our Brick Lane proposals to address key safety and air quality issues. Our initiatives will create accessible and safer school travel routes by reducing the number of cars polluting the school environment and improving road safety for children.
These proposals are a key part of Tower Hamlets commitment to support Brick Lane’s economic recovery from the Covid-19 pandemic and aims to attract more visitors to the area and support businesses to trade safely.
Overview of Brick Lane Proposals
Overview plan of all proposed works in the Brick Lane area. Please click to enlarge(External link)
Have your say
Your views on our Brick Lane proposals are important to us. You can have your say by providing your feedback through our online survey.
If you have any issues or questions you can either leave a question via our Q&A tool or alternatively email liveablestreets@towerhamlets.gov.uk(External link)
If you would like to raise any questions in Bengali or request a translated copy of the consultation booklet in Bengali then please fill out the request form here.
The consultation is open from Wednesday 17th March and closes at 11:59 on Wednesday 14 April 2021.
Coronavirus update
Our Liveable Streets programme team are following government advice and are currently working remotely. Work will continue as planned on the projects and the team will adhere to all guidelines.
Please note that construction timing is subject to change depending on changes to coronavirus restrictions, weather and coordination of works in the area. We will update the website with any changes to the programme and hope you will continue to help us improve the look and feel of your neighbourhood.
For coronavirus updates from Tower Hamlets or to join our mailing list please click here(External link).
If you have any questions regarding the construction phase please see below, or get in touch with the team by emailing LiveableStreets@towerhamlets.gov.uk(External link) or calling 0203 092 0401.
Created by Richard Ollerenshaw // 1 thread
Row of parked cars on busy road requires vehicles to overtake into oncoming traffic. Cyclists repeatedly forced into gutter at this location by oncoming vehicles.
Created by Robin Heydon // 1 thread
Proposed new development on the A505 between Heydon and Fowlmere
Created by John Chamberlain // 1 thread
Eversholt Street closed to all southbound traffic including cycles till late May
Created by Roxanne (CEO) // 1 thread
Last month, the Government launched the process to develop a long-term Spatial Framework for the Oxford-Cambridge Arc. The Government’s ambition is to support a better, more sustainable approach to planning for growth and investment in the area.
The Government's proposal:
https://www.gov.uk/guidance/oxford-cambridge-arc
What is the Arc?
The Oxford-Cambridge Arc (the Arc) is a globally significant area between Oxford, Milton Keynes and Cambridge. It is formed of five ceremonial counties: Oxfordshire, Bedfordshire, Buckinghamshire, Northamptonshire and Cambridgeshire.
It supports over two million jobs, adds over £110 billion to the economy every year and houses one of the fastest growing economies in England.
Our ambition for the Arc
There is an opportunity, recognised by government and local partners, to build a better economic, social and environmental future for the area. With high-quality, well-connected and sustainable communities making the Arc an even more beautiful place to live, work and visit.
Delivering the ambition
To achieve this ambition, the government alongside local partners, is going to:
Develop a Spatial Framework for the Arc; a long-term strategic plan to help coordinate the infrastructure, environment and new developments in the area. We are committed to working with local communities throughout so we can create beautiful and sustainable places for residents and workers to enjoy.
Explore the creation of an Arc Growth Body; that would be a clear economic leadership voice for the Arc, championing its talent and assets internationally, supporting businesses, and fostering innovation.
Areas of focus
Productivity and jobs
The Arc currently generates over £110 billion to the UK economy every year.
The Arc has the potential to become a world-leading and globally renowned centre for business, innovation and investment in a variety of industries, including AI (Artificial Intelligence), advanced manufacturing and life sciences.
Placemaking
With a strategic approach to planning for growth, we can enhance the area’s natural environment and biodiversity, ensure communities and businesses have access to the infrastructure they need, and ensure new development is more affordable and beautiful so that it enhances places across the Arc.
Infrastructure and connectivity
Improving connectivity across the Arc with a new rail line between Oxford, Milton Keynes and Cambridge will link communities with employment and leisure opportunities.
While integrating sustainable and accessible transport options will support our ambition for the Arc and ensure homes and employment sites are situated in the right places.
Environment
Encouraging clean growth and the creation of sustainable communities will support us in improving the quality of life for those that live and work in the Arc. While also helping us future-proof its businesses and communities against the effects of climate change.
Key documents
Created by davidsecher@gmail.com // 1 thread
This is probably an old issue, but I only discovered this cycleway on Sunday. I very nearly had a bad accident cycling through the pinch point (pram arms) at the Dry Drayton end of the Bar Hill Cycleway. There are many photos on Cycle Street's photomap (e.g. 26327) that illustrate the invisibility in the shade of the metal arms. No signage or reflective tape to warn of the hazard. For me, this is MUCH more dangerous than the A14 bridges. (I have signed the petition and attended the Highways meeting.) Similar obstruction towards Bar Hill too, but by then I knew to walk the bike through!
Created by Steven Moseley // 1 thread
CONVERSION OF EXISTING GROUND FLOOR D2 USE INTO 4 APARTMENTS
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.