PA_211926_SussexFlat
Proposed annex. Renewal of approved application 181350.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
sound+fury // 1 thread
As per the tags
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03261/FUL: Renovation and two storey side extension of existing three bed house, and three new two storey, two bed, three person terrace houses, external bike and bin stores
43 Brookfields Cambridge CB1 3NZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03119/FUL: New 1 bedroom dwelling fronting Hulatt Road
98 Wulfstan Way Cambridge CB1 8QJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03155/FUL: Erection of 9no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling
72 High Street Cherry Hinton Cambridge CB1 9HZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03413/FUL: Creation of a two storey semi-detached structure to provide 1 No. one bedroom apartment adjoining the neighbouring block of No. 32 Mill Road, ref: 12/1132/FUL
34 Mill Road Cambridge CB1 2AD
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02954/FUL | Change of use from office to flat. | 190 Green End Road Cambridge CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03304/FUL: Retention of existing dwelling, erection of 1no. linked 2 bedroom dwelling and 1no. 1 bedroom detached dwelling, along with a new parking bay accessed from Suez Road and associated works
108 Suez Road Cambridge CB1 3QD
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Red Lion Street and Dane Street in June 2020.
They also propose to:
- create a pedestrian and cycle only zone on Red Lion Street south of the junction with Princeton Street with new trees and cycle parking
- stop southbound motor traffic on Bedford Row from accessing Sandland Street, introducing a wide build-out with new trees, seating and cycle parking
Created by Alex Jenkins // 1 thread
https://talk.towerhamlets.gov.uk/lsshadwell
The Liveable Streets Shadwell proposal aims to improve the look and feel of the Shadwell area whilst making it easier, safer, and more convenient to get around by foot and bike.
Overview map of proposals in Shadwell. Please click on the image to download a larger copy.
These proposals have been developed on feedback based on residents, businesses and the local community and aim to benefit all road users. This is achieved by improving accessibility to walking and cycling for all so that those with disabilities, people of all ages, cultures and genders can feel safe. Additionally, the reduction in through traffic in the area will improve the safety and air quality for all.
Our proposals include:
What is being proposed?
Five schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Residents in particular parts of Cambridge are being asked to put forward proposals for improving open spaces and play areas via Cambridge City Council’s 2021 S106 funding round.
sound+fury // 1 thread
The application is for former offices to be turned into housing.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
According to the Combined Authority's Forward Plan (July 2021), the Transport and Infrastructure Committee are due to consider proposals for funding a Segregated Cycling Study for Holme to Sawtry and make recommendations to the Combined Authority on 8th September 2021. The lead officer is Paul Raynes, Director of Delivery and Strategy, and the decision will be made by Mayor Dr Nik Johnson.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02888/FUL | Change of use to a large HMO (8 persons)
87 Ditton Fields Cambridge CB5 8QQ
sound+fury // 1 thread
From Idox: Demolition of all buildings on site and erection of 1no. detached dwelling and 8no. 1 and 2 bed apartments Demolish Existing Bungalow and replace with 1No. Detached 2 Storey Dwelling at front of site. Demolish all outbuilding to rear currently used a flooring company and replace with 8No. 1 and 2 Bedroom Apartments. | 125 Scotland Road Cambridge CB4 1QL
Created by Jean Dollimore // 1 thread
TfL is planning to upgrade two of the existing signalised pedestrian crossings on Camden Road to Toucans.
These crossings are:
Rochester Road to Rochester Square
The crossing lines up with Rochester Square (south side of Camden Road) so TfL is proposing a section of shared-use footway on the north side of Camden Road from Rochester Road to the crossing.
Cantelowes Gardens to Cantelowes Road
The crossing almost lines up with the footway exit from Cantelowes Road (past the planter known locally as the ‘billiard table’). TfL is proposing a section of shared-use footway on the north side of Camden Road between the western exit from the Gardens and the crossing.
Details
Camden is being left to make the connections at both ends of the two crossings. These are tricky e.g. cycling isn’t even allowed in Cantelowes Gardens at the moment. But those issues are outside the scope of this consultation.
Toucans are signalised crossings where cycles and pedestrian share the surface of the crossing as well as an area of footway on both sides of the road. They are supposed to be at least 4m wide. (LTN 2/95).
The Rochester Road crossing width will be increased to 4m. The crossing at Cantelowes Road is already over 3.5m wide. In both case the island width will be increased to 2.5m
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02293/FUL | Construction of 2no 1bed dwellings.
15 Garlic Row Cambridge Cambridgeshire CB5 8HW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02862/FUL | Two storey rear extension and loft conversion of existing dwelling to create additional accommodation and development to side of existing dwelling to create two self contained 1-bed flats
15 Tillyard Way Cambridge CB1 8QT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from single dwellinghouse (class C3) to 11 person house in multiple occupation (sui generis) including provision of cycle and refuse store
1 Selwyn Gardens Cambridge CB3 9AX
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02759/FUL: Demolition of existing buildings and erection of new commercial/retail floor space, 48 new residential apartments and houses, new car parking areas, new hard and soft landscaping, bin and bike stores and associated works
Colville Road Phase 3
Land At Colville Road
And Fishers Lane
High Street
Cherry Hinton
Cambridge Cambridgeshire CB1 9HT
Created by Jean Dollimore // 1 thread
Sandall Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Sandall Road by the width restriction to prevent motor traffic from cutting through residential streets between Camden Road and Kentish Town Road or Leighton Road.
Camden is now consulting on whether the trail scheme should be made permanent. Drawing here.
The consultation and the Online Survey are here
https://consultations.wearecamden.org/supporting-communities/sandall-road/
Savernake and Cressy Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Savenake Road by the entry to Saverrnake Bridge to prevent motor traffic from cutting through Constantine Road and Savernake Road to avoid the signals at the junction of Agincourt Road and Mansfield Road.
Camden is now consulting on whether the trail scheme should be made permanent with some enhancements - three separate water absorbing planting areas to include three new trees. Plans.
They are also proposing two-way cycling on Cressy Road between Agincourt Road and Constantine Road – a very welcome extension of the recently implemented two-way cycling on Cressy Road south of Agincourt Road.
And an electric vehicle charging point.
The consultation and the Online Survey are here
Created by Roxanne (CEO) // 1 thread
Anglian Water and Cambridge City Council, working with U+I and TOWN, are exploring the vision for a new sustainable urban quarter at the heart of the proposed new district of North East Cambridge.
The project is currently called the Core Site, North East Cambridge (shown on the attached map). The aim is to deliver over 5,000 new homes on the Core Site over the next 20 years, along with shops, workplaces, education, community and leisure facilities, and open spaces. This opportunity is enabled by the proposed relocation of Anglian Water’s Cambridge Waste Water Treatment Plant, with the support of Homes England, and the Cambridgeshire and Peterborough Combined Authority.
Cambridge City Council is currently bringing forward an Area Action Plan (AAP) for the wider district, within which the Core Site is located, which could deliver a total of 8,000 new homes in ‘an inclusive, walkable, low-carbon new city district with a lively mix of homes, workplaces, services and social spaces, fully integrated with surrounding neighbourhoods’. The Core Site has a key role to play in delivering this vision.
The landowners of the Core Site - Anglian Water and Cambridge City Council - have selected U+I, in partnership with TOWN, as master developers for the site will be working to bring forward proposals for the site and, eventually, a planning application.
Created by Steven Moseley // 1 thread
Conversion of existing first floor office accommodation into two 2 bedroom apartments along with ground floor refuse and cycle storage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
this old fashioned barrier on a major cycleway needs a rethink
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Andy Allan // 1 thread
There's a nice cycle route along Mount Nod Road into Hillside Road that's interrupted by a short section of path marked "No Cycling". Adding a cycle path would remove an (unsigned) detour via Faygate Road.
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.