Things tagged '2'

limited to the area of Cyclenation:

3 issues found for '2':

  • QW2: Morning Lane cycle crossing

    Created by Harry Fletcher-Wood // 1 thread

    As part of the Quietway 2 route, Hackney Council propose a cycle crossing, raised table and motor vehicle restrictions at the crossing of Morning Lane.

    Looks good at first sight, if you have any thoughts about the scheme please could you add them by Friday, 5th August, so that Harry and Natalie can draft a group response.

    Please sign in to vote.
  • QW2: Lower Clapton Road & Clarence Place Consultation

    Created by Harry Fletcher-Wood // 1 thread

    As part of the Quietway 2 proposals, Hackney Council are proposing to remove through traffic from Clapton Square through the use of two modal filters. They are also proposing a new cycle crossing of Lower Clapton Road, with a raised table and a parallel zebra crossing alongside it.

    The proposals look good at first glance, but any detailed comments would be helpful.

    Please respond by Friday 5th August so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.

    Please sign in to vote.
  • Consultation on: HS2 Phase 1 environmental statement | Camden Town and HS1 Link

    Created by Jean Dollimore // 1 thread

    HS2 are consulting on a report on the environmental impact caused by the link following the Overground route between HS1 (on York Way near St Pancras station) and where it joins the mainline near to Adelaide Road.
    They will be working for a period of seven years, starting in 2017, altering or rebuilding all the bridges and adding track to the viaducts
    The main depot is on Camley Street at the foot of the Agar-Camley Link, another depot is at junction of Royal College Street and Camden Road.

    See http://assets.dft.gov.uk/hs2-environmental-statement/volume-2/Volume_2_CFA2_Camden_Town_HS1_Link.pdf

    I will put a draft response in a thread related to this issue. Feedback will be welcome. You could also consider replying to:

    HS2PhaseOneBillES@dialoguebydesign.com

    FREEPOST RTEC-AJUT-GGHH
    HS2 Phase One Bill Environmental Statement
    PO Box 70178
    London
    WC1A 9HS.

    Please sign in to vote.

No library items found for '2'.

No planning applications found for '2'.

Back to top