  • Central London Cycle Grid Section 1: Queensbridge Rd b/w Hackney Rd & Whiston Rd

    Created by Simon Munk // 1 thread

    From Hackney council:

    Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road

    We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.

    Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:

    • Section I: Hackney Road – Whiston Road
    • Section II: Whiston Road – Middleton Road
    • Section III: Middleton Road – Dalston Lane

    Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.

    Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.

    The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.

    What are the proposals?

    The following measures are proposed:

    Queensbridge Road raised cycle tracks

    • Installing two metre wide raised cycle tracks between Hackney Road and Whiston Road. These will be next to the existing pavements on both sides of the road. The raised cycle tracks will be separated from motorised traffic by a kerb and from pedestrians by a pedestrian/cycle separator (see example of a separator on page 11 in the FAQs section).
    • Installing a mandatory cycle lane on the carriageway next to the cycle hire scheme at Kent Street.

    Dunloe Street shared zebra crossing

    • Installing a raised table with a parallel pedestrian/cycle crossing (shared zebra crossing for pedestrians and cyclists) at the junction of Dunloe Street and Queensbridge Road. The parallel crossing will allow cyclists and pedestrians to cross Queensbridge Road under the controlled conditions of a zebra crossing. The raised junction table will provide a step-free pedestrian crossing and help with encouraging drivers to keep to the 20mph speed limit.
    • Closing Dunloe Street on both arms with Queensbridge Road to motor traffic to reduce the potential conflict between turning traffic and pedal cyclists and reduce rat running.

    Hackney Road junction improvements

    • Installing a raised entry table at the junction of Hackney Road and Horatio Street to provide pedestrians with step-free crossing facilities.
    • Replacing the existing traffic islands on Hackney Road with wider pedestrian-friendly traffic islands.
    • Refurbishing the road and pavements around the junction.
    • Removing clutter such as redundant guard railings and signs at the junction. Installing double yellow lines between the pedestrian crossings at the junction.
    • Installing low level cycle signals with early release crossing facilities for cyclists at Queensbridge Road and Horatio Street, subject to junction capacity.

    Kent Street raised entry table and zebra crossing

    • Installing a raised entry table at the junction of Kent Street and Queensbridge Road for a step-free pedestrian/cycle crossing at this location.
    • Installing a raised table for the existing zebra crossing at Edith Street to provide controlled step-free crossing facilities for pedestrians when crossing Queensbridge Road. Due to the nature of the road at this location, a parallel pedestrian/ cycle crossing was considered unsuitable.

    Refurbishment of pavements and carriageways

    • The existing pavements adjacent to the raised cycle tracks will be refurbished using standard paving materials. Blended pedestrian crossings will be installed at Kent Street and Dunloe Street side road junctions to highlight the priority of pedestrians over pedal cycles and motorised traffic from the side roads (see example of a blended crossing on page 11 in the FAQs section).

    Whiston Road junction

    • Installing ‘advanced stop lines’ (ASLs) for cyclists at the southern arm of Queensbridge Road connected to the raised cycle track with road markings.
    • Low level cycle signals with early release crossing facilities for cyclists will be considered as part of Section II between Whiston Road and Middleton Road.

    Please download the plans below for more details

    Layout plans from Hackney Road to Whiston Road

    Location plan

    Layout plans from Hackney Road to Whiston Road

    Detail 1: Dunloe Street junction

    Detail 2: Hackney Road junction

    Detail 3: Kent Road junction

    What are the potential impacts of the proposals?

    • If approved, these proposals would provide safe, protected cycling facilities for cyclists between Hackney Road and Whiston Road. Six collisions resulting in slight personal injuries were recorded in 2017 between Hackney Road and Whiston Road, three of which involved pedal cyclists.
    • They would also provide step free crossing facilities for pedestrians at side roads and at controlled pedestrian crossing points.
    • The reduced road width would help reduce the average traffic speeds (outside Haggerston School) to under 20mph.
    • The proposals would help improve accessibility for pedal cyclists and pedestrians at major junctions such as at Hackney Road.
    • Schemes of this nature are expected to contribute to improved air quality as they both regulate private motor vehicle traffic and reduce capacity. The introduction of cycle lanes also increases the distance between polluting vehicles and pedestrians and residents, reducing the effects of pollution.

    Parking

    • The proposals would affect all the parking on Queensbridge Road between Hackney Road and Whiston Road where the existing parking bays will be removed.
    • The existing car club and loading bay at Queensbridge Road will be relocated to Dunloe Street (east). A new electric charging point will also be installed on the same bay.
    • A parking stress survey confirmed that the existing parking bays on the side roads are able to absorb the impact of displaced cars from Queensbridge Road.
    • The existing residents parking bay on Horatio Street would be changed slightly to create space for passing cyclists.
    • The single yellow line between pedestrian crossings at the Hackney Road junction would be converted to double yellow lines.
    • Parking for visitors to the Columbia Road Flower Market would still be available at the ‘pay and display’ parking bays on Yorkton Street, Scawfell Street and Thurtle Road.

    Future schemes

    The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:

    • Section II: Whiston Road to Middleton Road (2020–2021)
    • Section III: Middleton Road to Dalston Lane (2021–2022)

    What happens next?

    Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk  

    To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations

    Permanent works

    If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.

    Frequently Asked Questions

    Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?

    A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.

    Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?

    A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings

    Please sign in to vote.
  • Duke Hill St/Tooley St

    Created by SallyEva // 1 thread

    Proposals include:

    Introducing a 20mph speed limit along entire length of Duke Street Hill/Tooley Street (between Borough High Street and Tower Bridge Road)
    Introducing a 2 metre wide mandatory cycle lane westbound, on Duke Street Hill/Tooley Street, running between Borough High Street and Bermondsey Street junctions, separated from traffic with wands on the Duke Street Hill section
    Introducing a protected right turn ‘pocket’ for cyclists waiting to turn right into Bermondsey Street from Tooley Street
    Making Duke Street Hill no entry, apart from cyclists and buses, from the junction with A3 Borough High Street. This will mean that eastbound traffic along Duke Street Hill and Tooley Street as far as the junction with Bermondsey Street is restricted to buses and cycles only.
    Restricting access from side roads onto Tooley Street to westbound travel only. Any motorized vehicle turning onto Tooley Street from the following roads will not be able to turn onto and travel eastbound towards Bermondsey Street:
    Tooley Street onto Duke Hill Street
    Bridge Yard onto Tooley Street
    Cottons Lane onto Tooley Street
    Hay’s Lane onto Tooley Street
    Battlebridge Lane onto Tooley Street
    Westbound traffic will continue to be able to travel along this section of highway as it does at present (i.e. accessing via Bermondsey Street or from roads further east) which lead onto Tooley Street.

    This will be an interim scheme, reducing traffic in the short term. We are working on a more transformational scheme for Tooley Street, to extend the high-quality cycling provision proposed as part of Cycle Superhighway 4 towards London Bridge.

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.

    Please sign in to vote.
  • Central London Grid / Quietway - Earls Court Square area

    Created by Simon Munk // 1 thread

    These junctions are part of the Central London Grid - a set of connected routes for cyclists across central London comprising a network of Quietways and Cycle Superhighway routes.
    As part of the Central London Grid, a route is proposed to run between Brompton Cemetery and Exhibition Road, along Bramham Gardens, Earls Court Square and Kempsford Gardens. We are therefore proposing changes to the junctions to make it safer and easier for cyclists, pedestrians and vehicles to cross.

    What are we proposing?

    Junction 1 - Earls Court Road / Bramham Gardens / Earls Court Square
    The proposed changes include:
    - Removal of existing island on Bramham Gardens and extension of footway to reduce pedestrian crossing distance
    - Widening of the pedestrian crossings on Bramham Gardens and Earls Court Square
    - Removal of existing island on Earls Court Square and provision of new smaller island with dedicated cycle stop line

    Junction 2 - Warwick Road / Earls Court Square / Kempsford Gardens

    Warwick Road
    - New signalised junction to allow cyclists, pedestrians and vehicles to safely cross Warwick Road. The traffic signals will be co-ordinated with other signalised junctions in the area and the changes are not expected to have a significant impact on journeys times for road users through the area, although vehicles exiting Earls Court Square will have to wait for a green signal as opposed to waiting for a gap in traffic as at present
    - New signalised pedestrian crossing across Warwick Road on the southern arm of the junction. This new crossing will ensure that pedestrians can continue to cross Warwick Road safely and without significant delay
    - Existing signalised pedestrian crossing removed (replaced by crossing on the southern arm of the junction). The existing double red lines will be painted across the removed zig-zag markings at the crossing
    - Existing parking bay relocated 40m to the south-east on Warwick Road due to the new signalised junction. The existing restrictions would apply to the relocated parking bay.

    Earls Court Square
    - Vehicles permitted to travel straight over Warwick Road, westbound from Earls Court Square to Kempsford Gardens. This movement is currently banned
    - Dedicated signals installed to inform cyclists of when to safely proceed from Earls Court Square
    - Additional cycle stands provided to replace those removed from Kempsford Gardens
    - Footway re-aligned to maintain existing parking for motorcycles, car share and local residents

    Kempsford Gardens
    - Existing contra-flow cycle lane widened for cyclists travelling eastbound on Kempsford Gardens
    - Dedicated signals installed to inform cyclists of when to safely proceed from Kempsford Gardens
    - Existing speed hump to remain to help control speed of vehicles travelling westbound on Kempsford Gardens