Things tagged 'consultation'

limited to the area of Cyclenation:

571 issues found for 'consultation':

  • Englefield Road - De Beauvoir area - Environmental and cycle improvements to CS1

    Created by Simon Munk // 1 thread

    Hackney says:
    "The Council is committed to making Hackney’s roads safer for everyone living, working
    and visiting the borough. These changes aim to create an environment that will encourage
    more walking and cycling, improve air quality and reduce emissions within the local area.
    Our Transport Strategy includes a Liveable Neighbourhoods Plan, which recognises that local
    streets are not just places to park vehicles or drive, walk and cycle on. They are places where
    we socialise and live our lives. An aspiration is to reclaim Hackney’s streets from motor
    traffic congestion and transform them into the most attractive and liveable neighbourhoods
    in London.
    One key objective for this proposal is to create a safer, more pleasant environment for
    cycling on the CS1 route through the De Beauvoir area.
    Back in autumn 2015 Transport for London (TfL) in partnership with Hackney Council
    consulted on a motor traffic reduction scheme in the De Beauvoir area that assists users
    of the CS1 route. These proposed modal filters have now been introduced.
    One of the proposals that was not taken forward at that time was a zebra crossing on
    Englefield Road near the junction of Culford Road. From continued feedback from residents,
    and users of the CS1 route through this area, the Council has now reviewed the design and
    location which provides a safe crossing point for cyclists, as well as pedestrians, crossing
    Englefield Road. Please see the drawing attached for more detail.
    Introducing this duel crossing point on Englefield Road at Culford Road will also allow the
    relocation of two of the existing modal filters to be moved to this new crossing point. Modal
    filters are closures to motorised traffic that still allow access for pedestrians and cyclists. "

    Please sign in to vote.
  • Sutton Local Implementation Plan 3

    Created by Charles Martin // 1 thread

    The council is undertaking a public consultation on its draft third Local Implementation Plan (LIP). This is a statutory document that outlines how Sutton will contribute to meeting the outcomes and objectives in the new Mayor of London’s Transport Strategy, published earlier this year. It also outlines key proposals for transport schemes in the borough for the next three years (to 2021) and longer term ambitions to 2041.

    Please sign in to vote.
  • Central Road Worcester Park

    Created by Marcus Howarth // 1 thread

    see https://sutton.citizenspace.com/environment/centralroad/

    "proposals to improve the flow of traffic and improve the environment for residents, traders, pedestrians, cyclists and users of public transport. The aim of the scheme is to encourage more people to walk, cycle or use public transport and reduce the number of local car trips. Funding for this scheme is available from Transport for London."

    How is this going to achieve this by creating a few parking bays and a new sign for a car park?

    Please sign in to vote.
  • Marylebone Low Emission Neighbourhood Projects

    Created by Dominic Fee // 1 thread

    "As part of the Marylebone Low Emission Neighbourhood (LEN), Westminster City Council is proposing to introduce a number of new measures around Marylebone High Street and Paddington Street. These interventions will sit alongside the behaviour change measures already undertaken as part of the LEN programme."

    "Projects
    Details of these proposals are set out below, showing the existing and proposed arrangements, as well as information on the rationale. Once implemented, these proposals will be the first of their kind in Westminster. If you would like to comment on the proposals or have any questions, please email info@marylebonelen.org by 11.59pm on 5th December 2018. Responses will be considered before proceeding with the next stages of design and implementation."

    Please sign in to vote.
  • Volunteers needed for Community Active Travel Street Audit - Stranraer

    Created by Transport Planning and Engineering // 1 thread

    We are Transport Planning and Engineering (TP&E), the social enterprise sustainable transportation consultancy and we are actively working in co-ordination with Living Streets, the UK charity for everyday walking.

    Dumfries and Galloway Council have asked us to run a Community Active Travel Street Audit in Stranraer as part of the Paths for All Smarter Choices, Smarter Places initiative.

    - The Council want to help local people to walk and cycle more when travelling through the town centre and connect with existing active travel routes.
    - They would like your help to identify the physical barriers to active travel, and also suggest ways to encourage more people to walk and cycle.
    - The aim is to find and prioritise projects that could remove the barriers to active travel.

    Would you like to walk or cycle in Stranraer more than you do now? Do you have a child in a pushchair, find walking difficult or use a wheelchair to get around? Would you like to help make the streets of Stranraer more pedestrian and cycle friendly?

    We will be holding a Street Audit on Tuesday 20 November, meeting at the Stranraer Development Trust offices at 10.30 am. The Street Audit will focus on the route through the town centre (George Street) to the harbour and Agnew Park. You can see this in the map below.

    Would you like to join us in the Street Audit? We will walk the routes which will give you the opportunity to share your views on the pavements, streets and crossings and what improvements could be made to remove barriers to getting around the area on foot and by bike. The audit will take about 2 hours of your time.

    You know your local area. You know the barriers and will have ideas about what could improve it to encourage more people to walk and cycle. We need your ideas!

    If you would like to help please let us know by emailing info@tpande.org or calling 0141 229 5448. If you can think of anyone else who might like to be involved, please pass on the details or ask them how we can get in touch and let us know.

    Also, if you would like to leave a message please follow the thread link on the right hand side of this web page listed as "Volunteers needed for Community Active Travel Street Audit - Stranraer". If you scroll to the bottom of the thread there is a section to compose a message/post. To undertake this task please ensure you are signed into cyclescape.

    Please sign in to vote.
  • Volunteers needed for Community Active Travel Street Audit - Dumfries

    Created by Transport Planning and Engineering // 1 thread

    We are Transport Planning and Engineering (TP&E), the social enterprise sustainable transportation consultancy and we are actively working in co-ordination with Living Streets, the UK charity for everyday walking.

    Dumfries and Galloway Council have asked us to run a Community Active Travel Street Audit in Dumfries as part of the Paths for All Smarter Choices, Smarter Places initiative.

    - The Council want to help local people to walk and cycle more when travelling in the town centre and connecting with existing active travel routes.
    - They would like your help to identify the physical barriers to active travel, and also suggest ways to encourage more people to walk and cycle.
    - The aim is to find and prioritise projects that could remove the barriers to active travel.

    Would you like to walk or cycle in Dumfries more than you do now? Do you have a child in a pushchair, find walking difficult or use a wheelchair to get around? Would you like to help make the streets of Dumfries more pedestrian and cycle friendly?

    We will be holding a Street Audit on Wednesday 5 December, meeting at the Stove at 10.30 am. The Street Audit will focus on the route down the High Street to the river and along to Dock Park. We are also interested in the route from St Michael’s Bridge along St Michael’s Road to the schools and hospital. You can see this in the map below.

    Would you like to join us in the Street Audit? We will walk the routes which will give you the opportunity to share your views on the pavements, streets and crossings and what improvements could be made to remove barriers to getting around the area on foot and by bike. The audit will take about 2 hours of your time.

    You know your local area. You know the barriers and will have ideas about what could improve it to encourage more people to walk and cycle. We need your ideas!

    If you would like to help please let us know by emailing info@tpande.org or calling 0141 229 5448. If you can think of anyone else who might like to be involved, please pass on the details or ask them how we can get in touch and let us know.

    Also, if you would like to leave a message please follow the thread link on the right hand side of this web page listed as "Volunteers needed for Community Active Travel Street Audit - Dumfries". If you scroll to the bottom of the thread there is a section to compose a message/post. To undertake this task please ensure you are signed into cyclescape.

    Please sign in to vote.
  • Westminster City Plan 2019-2040

    Created by Dominic Fee // 1 thread

    Westminster City Council is consulting on its City Plan for the period 2019-2040. This is the Council's local plan, which sets out local planning policies and identifies how land is used, determining what will be built where.

    Please sign in to vote.
  • Kentish Town Planning Framework

    Created by John Chamberlain // 3 threads

    Camden are consulting on a proposed planning framework for the northwest part of Kentish Town. This essentially covers the Murphy’s and Regis Road sites and is designed to set parameters for when/if the sites are redeveloped. The consultation is at goo.gl/6GaJEd and is open for individual responses until December 7th.

    We will be putting in a response from Camden Cyclists so please use one of the threads to add your comments by the end of November. We are particularly focussed on cycle and pedestrian permeability.

    Please sign in to vote.
  • Duke Hill St/Tooley St

    Created by SallyEva // 1 thread

    Proposals include:

    Introducing a 20mph speed limit along entire length of Duke Street Hill/Tooley Street (between Borough High Street and Tower Bridge Road)
    Introducing a 2 metre wide mandatory cycle lane westbound, on Duke Street Hill/Tooley Street, running between Borough High Street and Bermondsey Street junctions, separated from traffic with wands on the Duke Street Hill section
    Introducing a protected right turn ‘pocket’ for cyclists waiting to turn right into Bermondsey Street from Tooley Street
    Making Duke Street Hill no entry, apart from cyclists and buses, from the junction with A3 Borough High Street. This will mean that eastbound traffic along Duke Street Hill and Tooley Street as far as the junction with Bermondsey Street is restricted to buses and cycles only.
    Restricting access from side roads onto Tooley Street to westbound travel only. Any motorized vehicle turning onto Tooley Street from the following roads will not be able to turn onto and travel eastbound towards Bermondsey Street:
    Tooley Street onto Duke Hill Street
    Bridge Yard onto Tooley Street
    Cottons Lane onto Tooley Street
    Hay’s Lane onto Tooley Street
    Battlebridge Lane onto Tooley Street
    Westbound traffic will continue to be able to travel along this section of highway as it does at present (i.e. accessing via Bermondsey Street or from roads further east) which lead onto Tooley Street.

    This will be an interim scheme, reducing traffic in the short term. We are working on a more transformational scheme for Tooley Street, to extend the high-quality cycling provision proposed as part of Cycle Superhighway 4 towards London Bridge.

    Please sign in to vote.
  • southwark draft movement plan

    Created by SallyEva // 1 thread

    We are developing a Movement Plan that will set the direction for transport planning in Southwark over the next 20 years – this work will influence the roads you use, the routes you take and the places you spend time in. The Movement Plan takes a people-centred approach, putting the people that live in, work in, and visit the borough at the starting point of our journey. This places fairness at the core of our work

    Please sign in to vote.
  • TfL's proposed changes to junctions along Edgware Road

    Created by Dominic Fee // 1 thread

    From TfL webpage https://consultations.tfl.gov.uk/roads/edgware-road/ :
    "We are proposing changes to junctions along Edgware Road, between the Marylebone Flyover and Marble Arch, which will improve safety for pedestrians, and other road users.

    Our proposals include:

    - Creating new pedestrian crossings, with green and red man signals
    - Adding count down timers to new and existing crossings
    - Creating more space for pedestrians on the pavement
    - Limiting speed for vehicles to 20 miles per hour
    - Providing new Advanced Stop Lines (cycle boxes) for cyclists"

    Please sign in to vote.
  • Oxford Street District Place Strategy and Delivery Plan

    Created by Simon Munk // 1 thread

    Westminster Council says:

    The draft strategy sets out a series of ambitious, exciting and also deliverable recommendations to significantly improve the district as a whole, with 96 projects across 87 different streets and spaces. We’ve also identified nine zones that reflect varying character from Marble Arch to Tottenham Court Road. The strategy was developed from previous consultation responses, proposed plans and a process of engagement in order to identify and understand concerns and ideas.

    All of the proposals are our ideas as to what could be done to improve the area. Subject to the feedback we receive in the consultation, the council will then carry out the detailed technical work that would be needed to turn those preferred proposals into reality.

    Please sign in to vote.
  • Redevelopment proposed for land south of Coldham's Lane

    Created by Matthew // 1 thread

    http://www.cambridgeindependent.co.uk/news/cambridge/community-asked-to-help-shape-area-of-major-change-in-cambridge-1-5762043

    Developer Anderson Group is hosting a community planning weekend later this month to give residents the chance to draw up a masterplan for land south of Coldhams Lane.

    “It’s about building good quality houses in good quality communities,” the company’s Christian Criscione told the Cambridge Independent ahead of a launch of the project on Tuesday (October 30).

    The former quarry and landfill site includes the Cherry Hinton lakes and land parcels to the north of the railway line.

    It has been identified by Cambridge City Council as an “area of major change” and the authority has been actively promoting the land for regeneration with “appropriate redevelopment”.

    As well as built development such as housing, the council has expressed ideas including the opening of the lakes, environmental improvements, outdoor recreation areas and a new urban country park.

    Please sign in to vote.
  • Sutton Tram Link

    Created by Marcus Howarth // 1 thread

    see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link

    Here's the overview from TFL:

    Overview
    We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.

    The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.

    Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.

    Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.

    BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.

    From LCC -

    general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.

    Please sign in to vote.
  • Lambeth Transport Strategy and LIP

    Created by Simon Still // 1 thread

    The Transport Strategy sets out the borough’s policies and ambitions for the coming 20 years. The Local Implementation Plan (LIP) adds further detail, setting out how the borough will deliver the outcomes of the Mayor of London’s Transport Strategy and includes a costed 3-year delivery plan.

    Please sign in to vote.
  • Streatham 'Our Streets'

    Created by Simon Still // 1 thread

    Deadline for responses
    ON
    Sunday 4 November 2018
    AT
    11pm
    Let us know what you think about our proposals for improving streets in Streatham Hill.

    Late last year Lambeth Council invited the Streatham Hill community to tell us where their local streets could be improved.

    There was a strong response with over 500 replies. From this information, and after further investigation, we have developed proposals that address some of the issues.

    We now want you to have your say on these proposal

    Please sign in to vote.
  • Quietway 5 - Pathfield Road Scheme

    Created by Simon Still // 1 thread

    Quietway 5 is a cycle route linking Waterloo to Norbury that passes through Lambeth North, Vauxhall and Clapham. Following the delivery of the one way closure on Estreham Road we are working on a scheme to address the issues in Pathfield Road.

    The Options Considered

    The top three solutions mentioned at the event that have been assessed were;

    Relocating or removing the existing point closure in Estreham Road
    A residents parking scheme
    Introduction of traffic restrictions to reduce traffic volumes
    Relocating the existing barrier on Estreham Road was considered, however, this would simply redistribute the traffic on to more local roads and not necessarily address the issue of rat-running traffic, speeding and increased parking on Pathfield Road. Also, the scheme to retain the point closure at Estreham Road received majority support from the wider community after the trial period in 2016.

    Options around parking controls in the area are being coordinated by the CPZ team. They are analysing the feedback from the Streatham parking attitudinal survey carried out at beginning of 2018 and will be providing feedback in the coming months.

    Given the above, the council's view is that the introduction of traffic restrictions to reduce the amount of traffic on Pathfield Road is the best option to address the issues raised at the meeting. We are also proposing speed humps to reduce general traffic speeds. The main proposals are detailed in the plan below.

    The Proposals

    You can view the proposals at the link below. The main changes proposed are;

    No-entry except cycles from Estreham Road to Pathfield Road, to prevent the majority of rat-running traffic from using Pathfield Road
    New sinusoidal humps installed along Pathfield Road to reduce general traffic speeds.
    No-entry except cycles from Greyhound Lane to Rotherhill Avenue, to prevent any rat running traffic that might use this route
    Junction improvements, with new greening/tree planting at Pathfield Road/Estreham Road. This proposal will require the loss of 1 informal parking space.

    Please sign in to vote.
  • Tooting Town Centre consultation

    Created by jon_events // 1 thread

    TfL have published this consultation for Tooting Town Centre.

    The brief was a pedestrian improvement scheme, so don't be too surprised that there is lots of room for improvement. I'll add further comments when I've got a bit more time.

    Please sign in to vote.
  • Nine Elms Pimlico bridge

    Created by Simon Munk // 1 thread

    Flyer says:
    Wandsworth Council is proposing a pedestrian and cycle bridge to
    connect Westminster and the new neighbourhood emerging in Nine Elms
    as well as the existing communities south of the river.
    The connection will improve access to this new shopping, restaurant and
    cultural district, as well as the new green spaces, thousands of jobs and
    Northern Line stations.
    Following consultation in 2017 on nine possible locations between
    Vauxhall and Chelsea bridges we have now selected three location
    options for further exploration.
    We want to find out what you think about this new car free bridge so are
    holding public exhibitions across Wandsworth, Westminster and Lambeth.
    Join us to learn more about the proposal and help shape one of London’s
    most exciting infrastructure projects. See the back of this leaflet for time
    and location details.
    You can also find out more and tell us your views online from Monday 5
    November

    Please sign in to vote.
  • A3220 Cheyne Walk with Lots Road junction

    Created by Simon Munk // 1 thread

    TfL says:
    The A3220 Cheyne Walk runs east-west along the northern Thames embankment. Its junction with Lots Road is used moderately by cars, cyclists and buses and the footways are busy with pedestrians. Cycle flows at the junction are relatively high.
    We are proposing improvements that will make it easier and safer for people to walk and cycle across Cheyne Walk, while also making it easier for turning HGVs by increasing the road space and improving sight lines.

    What are we proposing?
    Installing a new signal-controlled toucan crossing to replace the existing zebra crossing. The crossing will feature a Countdown unit, and will be configured to reduce pedestrian wait times, making it easier and safer for people to walk and cycle across Cheyne Walk
    Enhance the existing shared-use footway on the southern side of Cheyne Walk to provide more space for pedestrians, as well as an enhanced cycling connection to Lots Road
    Upgrading paving throughout the area to help visually impaired and blind people, improving conditions for vulnerable users
    Providing a new ramped inlet on the northern side of Cheyne Walk to provide safe and easy access to the toucan crossing
    Re-landscaping the pedestrian island on Lots Road to make vehicle movements easier and safer for all road users
    Subject to the outcome of this consultation, we plan to implement these changes in 2019.

    Will these changes affect your journey?
    These changes are designed to ensure that pedestrians and vulnerable people have a safe way to cross Cheyne Walk, while improving the movement of traffic throughout the area.
    Our modelling shows that the junctions will continue to operate efficiently and the changes will have little impact on journey times through the area. We will monitor the completed scheme to ensure it is operating as expected and make adjustments as required.

    Please sign in to vote.
  • Stoke Newington Gyratory

    Created by Simon Still // 1 thread

    We have worked with Hackney Council on proposals for how Stoke Newington would look and operate after the gyratory is removed. Our plans would provide a new northbound cycle track on the A10 and a new bus and cycle lane enabling people to cycle southbound on Stoke Newington High Street.

    This would remove a significant barrier to cycling in the area and provide new traffic-free public spaces to meet, shop, play and relax and a host of other improvements aimed at creating a more attractive and less traffic-dominated environment for people.

    Our plans will accommodate the area’s future growth and encourage active travel, with more people choosing to walk, cycle and use public transport and less people travelling by car.

    These proposals aim to improve the quality of life in the area by:

    Transforming the town centre by creating a single unified retail location with an enhanced environment for pedestrians and cyclists
    Improving the public transport interchange, achieved through two-way bus operation, reducing congestion, and simplifying bus stops
    Improving cycling facilities and access through the A10
    Encouraging more journeys by walking, cycling or public transport to/from the High Street
    Reducing rat-running in residential streets

    Our proposals would:

    Introduce a new northbound cycle track with bus stop bypasses on Stoke Newington High Street providing a dedicated space for people to cycle
    Introduce a new southbound bus and cycle lane along Stoke Newington High Street. Most buses and bikes will no longer travel the longer route along Northwold, Rectory and Manse Road when heading towards the City. This will provide better access to High Street facilities
    Introduce two-way traffic operation along Rectory, Manse and Evering Roads
    New modal filters at the junctions of Tyssen, Hollar and Batley Roads at their junction with the High Street. These closures are designed to reduce rat-running through residential streets
    Create three new ‘pocket parks’ where these roads are closed to traffic, creating a more welcoming retail environment and encouraging people to spend more time in the town centre. There could be new seating areas, trees, local community gardens, entertainment, and cycling parking spaces
    Restrict vehicular access eastbound to Evering Road from Manse Road and to Northwold Road from Rectory Road
    Introduce a new type of pavement treatment at side road junctions called a ‘continuous footway’. Introducing continuous footways in Stoke Newington High Street intends to emphasise that pedestrians have priority
    Introduce three new pedestrian crossings, all with pedestrian countdown, making streets in the area easier and safer to cross
    Introduce a new 20mph speed limit and raised junctions and crossings to slow traffic speeds and reduce road danger
    Formalise parking and loading bays, including hours of operation
    High Street south of Brooke Road: Monday - Sunday from 07:00 - 19:00 , 20 minutes loading and one hour parking only
    High Street between Brooke Road and Stoke Newington Church Street: Monday - Sunday from 07:00 - 10:00, 20 minutes loading only

    Please sign in to vote.
  • Kilburn High Road Liveable Neighbourhood

    Henry Lancashire // 1 thread

    Info from survey:
    "The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
    ...
    London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."

    Brent Cyclists are forming our own response, to be sent by end of October 2018.

    Please sign in to vote.

532 threads found for 'consultation':

No planning applications found for 'consultation'.

Back to top