Things tagged 'gyratory'

limited to the area of Cyclenation:

7 issues found for 'gyratory':

  • Golders Green Gyratory

    Created by Charles Harvey // 1 thread

    Fluid Design (consultants) are seeking views on making Golders Green gyratory more accessible to cyclists as part of a wider consultation on the future of Golders Green.

    Please sign in to vote.
  • Holborn Vision and Urban Strategy Consultation

    Created by George Coulouris // 1 thread

    Camden Council has prepared a draft Vision and Urban Strategy for Holborn and they are running a public consultation open to local residents, businesses, workers, community groups, and everyone else who has an interest in the area.  Their primary aim is to produce a Planning Strategy document to guide Camden's Planning Committee's decisions on construction projects in the area.

    We intend to submit a response by the Cycling Campaign because it clearly interacts with and should complement the Holborn Liveable Neighbourhood Scheme for which funding of around £12m has been announced by TFL and Camden.  The draft for the Vision and Urban Strategy references the Liveable Neighbourhood Scheme and outlines its main proposed actions including the proposed segregated cycle tracks on New Oxford Street and Theobolds Road, so there is no reason to fear a conflict. But the responses to this consultation may have some implications for the LN, so we should respond stating our priorities. 

    Both schemes propose the removal of the Holborn gyratory and the closure of its Procter Street arm creating a traffic free space there instead.

    Please sign in to vote.
  • North Finchley Town Centre Framework Consultation

    Created by JonC // 2 threads

    The Town Centre Framework aims to (amongst other things):

    o create a plan that maximises existing and future movement opportunities including links to nearby stations (Woodside Park and West Finchley), the bus network and pedestrian and cycle connections;

    o achieve well designed, high quality streets, spaces, public realm and buildings, which deliver an appropriate degree of local distinctiveness;

    Please sign in to vote.
  • Stratford Town Centre

    Created by Simon Munk // 1 thread

    Newham council say:

    We are working with Transport for London to transform Stratford town centre. This will include introducing two-way traffic around the Stratford Centre, improving bus services, and providing better facilities for pedestrians and cyclists.

    Changes to the one-way traffic system will allow for a better flow of traffic and reduce accidents in the area. It will also create a safer and more attractive town centre for everyone to enjoy.
    Our plans aim to encourage more people to visit the Broadway, High Street and Cultural Quarter and support our local businesses and cultural venues.

    As part of the plans, we want to:
    - introduce a two-way traffic ​system and road calming measures to reduce speeds
    - create separate cycle tracks to encourage more people to cycle through Stratford
    - widen the pedestrian crossing at Meridian Square and move other crossings to locations where pedestrians prefer to cross
    - improve the appearance of streets by resurfacing pavements, removing old street furniture and introducing new landscaping
    - enhance the public area near Theatre Square and St John’s Church.

    Please sign in to vote.
  • New dedicated cycle lanes at Hammersmith gyratory

    Created by Simon Munk // 1 thread

    TfL overview
    We are proposing a number of changes at Hammersmith gyratory, King Street, Beadon Road and Hammersmith Road as part of our Road Modernisation Plan, in partnership with Hammersmith & Fulham Council (H&F Council).The proposals aim to deliver a safer and more direct east-west cycle route through Hammersmith town centre.

    What are we proposing?
    We are proposing to create a direct, kerb-segregated two-way route for cyclists across the northern side of the gyratory, with separate cycle signals to protect them from traffic. This would remove the need to cycle round the gyratory, mixing with fast-moving traffic, and break a key barrier to cycling in west London.

    To improve conditions and safety for cyclists we would:
    - Provide a segregated two-way cycle track on the north side of Hammersmith gyratory. Cyclists would be physically separated from traffic by a kerb. We would make room for the cycle track by reallocating space from some sections of the wide pavement on the south side of the road
    - Separate cyclist and motor vehicle movements at junctions; cyclists would have their own traffic signals which would be green at different times to those for motor traffic
    - Extend the eastbound contraflow cycle track on King Street to allow cyclists to reach the gyratory from Hammersmith Town Hall without having to follow Studland Street, Glenthorne Road and Beadon Road. The cycle track would be ‘stepped’, meaning it would be at a height between the road and footway, and become physically separated with a kerb east of Lyric Square. We would make room for the cycle track by reallocating some space from the pavement on the south side of King Street
    - Provide a short two-way section of cycle track on Queen Caroline Street to allow access to Black’s Road and Hammersmith Bridge Road
    - Enable cyclists to pass through the island at the junction of Hammersmith Broadway and Butterwick, and increase the size of the island to accommodate cyclists and pedestrians

    We would also make the following changes in the area:
    - Provide a new bus lane on Beadon Road, between Glenthorne Road and Hammersmith Broadway
    - Remove the pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road to allow for provision of the segregated cycle track
    - Install pedestrian countdown signals at the crossings of King Street, Beadon Road, Shepherd’s Bush Road, Queen Caroline Street, Hammersmith Broadway and Butterwick
    - Widen the footway on King Street where possible to provide more space for pedestrians in this busy area
    - Raise the carriageway to footway level on King Street opposite Lyric Square to make crossing more convenient for pedestrians and encourage slower motor vehicle speed
    - De-clutter pavements by rationalising locations of street furniture
    - Increased cycle parking
    - Relocate one loading bay and two disabled parking bays on Black’s Road to provide space for additional taxi rank spaces

    Why are we proposing this?
    TfL is investing £4bn in the Capital’s vital road network to ensure London’s roads are able to meet the needs of a growing population. As part of this plan, we are reviewing junctions and gyratories across London to make them safer for all road users, including cyclists, and to make journey times more reliable. Hammersmith gyratory is used by many cyclists each day, and can be an intimidating place to cycle. Hammersmith is one of the Mayor of London’s 33 priority “Better Junctions”.
    H&F Council’s cycling strategy sets out an ambitious plan to increase the number of people cycling in the borough to reach eight per cent of all journeys. Part of this plan is to deliver a segregated cycle route along the A315 corridor, a key commuter route for cyclists. Hammersmith gyratory lies on this route.
    We are proposing to give cyclists dedicated space and separate cycle signals at junctions on the northern side of the gyratory. This would offer cyclists a more comfortable and direct route between King Street and Hammersmith Road, bridging the gap in the proposed A315 cycling route that the gyratory currently creates.

    Removal of the pedestrian crossing
    To ensure cyclists have adequate space to wait for a green signal on the island at the south of Shepherd’s Bush Road, we would need to remove the existing pedestrian crossing that connects this island to the south side of Hammersmith Broadway.
    Although the crossing is less well-used than others in the area, its removal would mean pedestrians would have to find alternative routes. Those walking between the south side of Hammersmith Broadway and the west side of Shepherd’s Bush Road would need to cross Queen Caroline Street and Beadon Road. Those walking between the south side of Hammersmith Broadway and the east side of Shepherd’s Bush Road would have a choice between crossing Queen Caroline Street, Beadon Road and Shepherd’s Bush Road or crossing Hammersmith Broadway at its junction with Butterwick.
    The vast majority of pedestrians crossing Hammersmith Broadway from outside the Piccadilly Line tube station use the most western of the two crossings.

    Impact on buses
    Beadon Road is narrow and carries a high volume of buses and general traffic. To reduce delays currently experienced by buses approaching the gyratory, we would provide a new bus lane on Beadon Road between Glenthorne Road and Hammersmith Broadway, replacing one of the two general traffic lanes.
    We also would need to relocate bus stop Z5 on the gyratory, which is currently used for emergency purposes only, to Butterwick.

    How would bus and traffic journey times be affected?
    Our proposals would affect some journey times through the area. In the main these changes would not be significant, with some bus and general traffic journeys getting shorter and some getting longer. The most notable increases in journey times will be for traffic approaching Hammersmith gyratory from Fulham Palace Road in the morning and evening peaks.

    Impact on other road users
    We propose to relocate the position of one loading bay on Shepherd’s Bush Road, with the existing dimensions remaining, in order to allow for an increase in the size of the existing taxi rank.

    How does this fit in with the wider plans for Hammersmith town centre?
    TfL and H&F Council are working together on ambitious plans for a long-term transformation of Hammersmith town centre.
    We are proposing shorter-term improvements to improve safety and connectivity for existing cyclists and support the Council’s cycling strategy to increase the number of new cyclists in the area. This plan is separate to, and does not affect longer term proposals for the area, however these proposals would be integrated with any future schemes.

    Delivery of the wider A315 cycling improvements
    TfL and H&F Council are also working together on plans for an east-west cycling route along the A315. Plans for this route either side of Hammersmith gyratory are currently being developed, with public consultation planned to take place later this year.

    Please sign in to vote.
  • King Cross Gyratory Redesign

    Created by User 609 (deleted) // 1 thread

    Issue now superseded by this issue discussing TfL's consultation: http://www.cyclescape.org/issues/2040-changes-to-the-king-s-cross-gyratory

    TfL, Camden Council, and Islington Council are currently developing plans to redesign the Kings Cross Gyratory and address some of the failures of the current gyratory layout.

    The current environment is very poor, and a real barrier to cycling. Fast, and congested one way traffic with 10-20,000 PCUs per day, and no cycle provision currently. Accessing the station from the east is almost impossible.

    The area has seen a number of cycle collisions including at least one fatality.

    To pre-empt the consultation due late 2015, we wanted to discuss what would be the best outcome for people on bikes.

    More information will be added when we know more, but for now, ideas please.

    Please sign in to vote.
  • West End Project consultation

    Created by Jean Dollimore // 6 threads

    This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.

    The consultation is on Camden's website at:

    http://www.wearecamden.org/westendproject/

    In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.

    TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.

    In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.

    Other measures proposed:
    - in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
    - two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
    - new public spaces including a new park on Alfred Place and a ladder of calm side streets.

    These changes to roads and to cycle permeability are shown in the diagram at:
    http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized

    Details of the road layout for TCR are at:
    http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized

    Details of the road layout for the Gower Street alignment are at:
    http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized

    Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),

    Camden Cyclists are holding a public meeting for cyclists to discuss this project.
    On 30th June 7pm - 9pm
    at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.

    We will finalise our response to the consultation early in July.

    The public consultation will run until Friday 18 July 2014.

    Please sign in to vote.

13 threads found for 'gyratory':

One library item found for 'gyratory':

No planning applications found for 'gyratory'.

Back to top