Waterbeach township proposals
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
limited to the area of Cyclenation:
10 issues found for 'proposal':
Created by Rohan Wilson // 10 threads
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
The University of Manchester has unveiled plans to turn Brunswick Street into a park—to be named Brunswick Park... the road will be blocked off to traffic and it will be replaced with an area of green public realm.
The park will sit in the heart of campus between the Simon and Williamson buildings. The area will be extensively landscaped and will feature pedestrian paths, cycle lanes, wildflower areas, trees, and benches.
The entire street will be converted and plans show a large circular area in outside the Zochonis, Roscoe, and Simon buildings, which leads to the Oxford Road along a wide paved area.
“Improved pathways” will be provided between Oxford Road and Upper Brook Street for pedestrians and cyclists.
Source: http://mancunion.com/2016/03/09/university-convert-road-park/
Single lane [30mph] traffic with wider pavements, permanent parking bays, new bus lay-bys, bus stop relocation, dedicated [advisory, due to parking bays] [1.5m wide] cycle lanes [no buffer, so in the door zone] and improved public realm, closure of the junction of Bury New Road and Warwick Street and the [since withdrawn] introduction of a one-way system along Clifton Road.
2016-02-23 Report: https://councildecisions.bury.gov.uk/documents/s10166/Prestwich%20High%20Street%20Regeneration%20Scheme%20-%20Cabinet%20report%20for%202nd%20March%202016%20-%20Open%20report%20-%20Fina.pdf
2016-03-02 Members accepted recommendations to:
(a) Instruct officers to undertake detailed designs and obtain tenders in respect of delivering Proposal One subject to the following amendments and within the approved budget:
i) Clifton Road to remain open in both directions. The situation will be monitored for a period of 12 calendar months from completion of the scheme as to its effect on traffic flows, congestion and safety.
ii) The on street (adopted) parking bays to be reduced in length and additional street trees to be included to improve the aesthetic appearance. Parking bays to be subject to restrictions of 60 minutes with no return with 1 hour.
iii) Officers to work with Transport for Greater Manchester to ensure traffic light sequencing is maximised to reduce congestion.
(b) Delegate authority to the Chief Executive and the interim Executive Director of Resources and Regulation, in consultation with the Leader of the Council, to consider all tenders received and to approve the awarding of the contract to undertake the approved scheme within the approved budget.
(c) Instruct officers to seek opportunities to secure additional match funding and sponsorship specifically in respect to street furniture, signage and planting
Created by Shaun McDonald // 2 threads
Suffolk County Council have put forward some plans for changes to Mulberry Corner, which Cycle Ipswich don't believe will help cycling.
Overview of the entire route (3.6mb):
http://www.gmcc.org.uk/consultations/201407_Port_Salford_Greenway_phase_1/Port_Salford_Greenway_Final_Boards.pdf
GMCC discussion thread for phase 1 proposals:
http://gmcc.cyclescape.org/threads/1437
Phase 1 local news report:
http://www.manchestereveningnews.co.uk/news/greater-manchester-news/salford-cycleway-new-1m-bike-7388931
Background media reports:
http://www.peel.co.uk/projects/portsalford
http://ontheplatform.org.uk/article/regenerated-mersey-global-atlantic-gateway
Created by Matthew Phillips // 1 thread
There is a demand for access to the University from Belmont and areas to the east of Durham. Creating a route across the playing fields towards Old Durham would shorten journeys and give a mostly off-road route.
It would require a new bridge and a tarmac surface. Note sure if there would be issues of potential flooding. Not sure if the University would co-operate with route across its land.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by velocipedus@gmail.com // 0 threads
Proposal for a Business Improvement District which would replace (?) "Love Cambridge". http://www.cbbid.co.uk/
Proposal is all about safety, cleanliness, city ambassadors, ultimately revenue
Beverly Carpenter from millroadsociety.org has a very spirited and serious response in the local paper
http://www.cambridge-news.co.uk/Home/Bidding-to-make-the-most-from-city-12092012.htm (does not include the "threat to diversity" argument present in the print version)
She calls it an attempt to privatise public space, privatise policing, (BID's don't honor Freedom of information requests) and turning the city centre into a shopping centre
I have seen these BIDs working in other places: ambassadors whizzing around on strange wheeled things, trying to enforce "no cycling" rules, but also a large budget which funded an annual festival.
The proposal has no language about car parking this is a topic that needs to be very closely watched from the bicycle saddle.
5 threads found for 'proposal':
Cycle Basingstoke
A discussion on issue
Brighton Hill Retail Park coffee shop
jpennycook
posted
A discussion on issue
Improvong route from University to Belmont
Matthew Phillips
posted
A discussion on issue
Proposed pedestrians and cycle facilities at Sulzers roundabout
Charlie Halliday
posted
A discussion on issue
Highgate Lane/A325 junction improvements
Charlie Halliday
posted
Bristol Cycling Campaign
A discussion on issue
Marlborough Street to Park Row, Bristol Dutch Style Cycle Infrastructure.
gavin
posted
No library items found for 'proposal'.
No planning applications found for 'proposal'.