Things tagged 'route'

limited to the area of Cyclenation:

66 issues found for 'route':

  • SCR 1 - Newburn

    Created by Katja Leyendecker // 1 thread

    This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.

    Please sign in to vote.
  • SCR 2 - West Denton

    Created by Katja Leyendecker // 1 thread

    This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.

    Please sign in to vote.
  • Belmont Viaduct

    Created by Gregory // 1 thread

    I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.

    Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
    Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.

    Please sign in to vote.
  • Route from Sandridge to St Albans

    Created by mike1727 // 1 thread

    Route along St Albans Road providing a direct link between St Albans and Sandridge. This would connect to the footpath/bridleway conversion from Sandridge to No-Man's land and to a potential route from No-man's land to Wheathampstead providing a route from St Albans to Wheathampstead.

    Please sign in to vote.
  • No cycling area on Causeway route

    Created by mike1727 // 1 thread

    The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.

    Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.

    Please sign in to vote.
  • Narrow route through Verulamium park towards the museum needs widening to 3 metre width

    Created by mike1727 // 1 thread

    The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.

    Route widening is not due until the Green Ring is built in 2015.

    STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.

    Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?

    Please sign in to vote.
  • Desirable route - Sydenham Hill to Wood Vale

    Created by Tom Chance // 1 thread

    Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.

    Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.

    Please sign in to vote.
  • Railway Route between Cambridge and Cherry Hinton

    Created by Simon Nuttall // 3 threads

    The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.

    There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.

    The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.

    This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.

    Please sign in to vote.
  • Inadequate Cycle Signage

    Created by Sam Saunders // 1 thread

    Cycling North along Westbury Road (A4018) on a shared-use pathway beside the main carriageway there is a sign to "Westbury Park Shops". It is about 50 yards before the Parry's Lane roundabout and indicates a right turn ahead for cyclists and pedestrians. It has been added to a larger sign that reads "New Road Layout".

    In practice, on arrival at the roundabout there is no indication before, on or after the roundabout as to where cyclists should go next. A zebra crossing before the roundabout offers a dismounted route to the other side of the road, but there is no indication of which direction to take thereafter. There are 4 roads to chose from, Westbury Park, Etloe Road, North View and Downs Park West but none of them seem to offer shops. There are two ambiguous cycle lane markings on the entrance to Westbury Park and "NO CYCLING" is painted on one footpath.

    The problem, in a nutshell, is one that recurs all over Bristol: if you don't already know the way a first encouraging sign gives expectations that are not followed through. A route that had been indicated as a cycle route (with the cycle symbol) at its origin is left to chance and guesswork. The effect on cycling is to increase uncertainty and unpredictability. Each cyclist is obliged to make guesses about how to use a junction or follow a route. An association of cycling with expert and arcane knowledge is reinforced. Many routes (including this one) could be improved with a few additional signs or road markings and their use by casual or less well-informed cyclists could be encouraged.

    Please sign in to vote.
  • Hassell Drive Open Space Formalised Path

    Created by David Wilcox // 0 threads

    Proposal
    To widen the path that links Trinity Street/West Street with the Bristol Bath Railway Path.

    Rationale
    The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. Many of these journeys access the railway path via a narrow path from Trinity street. The path is 1m wide, which is unsuitable for the volume of cyclists and pedestrians that use it.

    Part of the 2013 Bristol City Council LSTF proposals.

    Please sign in to vote.
  • LSTF Proposal Redcliffe Hill, Bristol

    Created by David Wilcox // 1 thread

    Proposal
    To provide a fully segregated two-way cycle facility on west side of Redcliffe Hill that links Bedminster Parade/York and Commercial Road/Clarence Road with Redcliffe Bridge and the Brunel Mile.
    This provides a direct route from destinations and major trip generators in the south to the City Centre and begins to deliver a North/South route. This proposal would ties in with proposed improvements on Commercial Road/Clarence Road that will link into the forthcoming Local Enterprise Zone.

    Rationale
    Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.

    Part of the 2013 Bristol City Council LSTF proposals.

    Please sign in to vote.
  • LSTF Proposal Clarence Road/Commercial Road, Bristol

    Created by David Wilcox // 1 thread

    Proposal
    To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
    This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.

    Rationale
    Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.

    Part of the 2013 Bristol City Council LSTF Proposal.

    Please sign in to vote.
  • Bermondsey St rat run

    Created by Gerhard Weiss // 0 threads

    Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
    Could be a good mode filter project

    Please sign in to vote.
  • Marshall Road shared use path

    Created by Chris Peck // 1 thread

    Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.

    This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.

    Please sign in to vote.

25 threads found for 'route':

One library item found for 'route':

No planning applications found for 'route'.

Back to top