  • A13 Commercial Road between New Road and Jubilee Street

    Created by Simon Munk // 1 thread

    TfL Overview:
    We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
    We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
    The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.

    What are we proposing?
    We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:

    Pedestrians
    - Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
    - Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
    - Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
    - Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
    - Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
    - Reducing kerb heights, particularly around Watney Market, to help pedestrians
    - Installing low level central islands to help pedestrians cross the road informally
    - Upgrading pavements where damaged or uneven

    Other Road Users
    - Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
    - Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
    - Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
    - Converting some existing parking bays into two new loading bays.
    - Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
    - Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic

    Urban Realm Improvements
    - New tree planting where conditions allow.
    - Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market

    Please sign in to vote.
  • New dedicated cycle lanes at Hammersmith gyratory

    Created by Simon Munk // 1 thread

    TfL overview
    We are proposing a number of changes at Hammersmith gyratory, King Street, Beadon Road and Hammersmith Road as part of our Road Modernisation Plan, in partnership with Hammersmith & Fulham Council (H&F Council).The proposals aim to deliver a safer and more direct east-west cycle route through Hammersmith town centre.

    What are we proposing?
    We are proposing to create a direct, kerb-segregated two-way route for cyclists across the northern side of the gyratory, with separate cycle signals to protect them from traffic. This would remove the need to cycle round the gyratory, mixing with fast-moving traffic, and break a key barrier to cycling in west London.

    To improve conditions and safety for cyclists we would:
    - Provide a segregated two-way cycle track on the north side of Hammersmith gyratory. Cyclists would be physically separated from traffic by a kerb. We would make room for the cycle track by reallocating space from some sections of the wide pavement on the south side of the road
    - Separate cyclist and motor vehicle movements at junctions; cyclists would have their own traffic signals which would be green at different times to those for motor traffic
    - Extend the eastbound contraflow cycle track on King Street to allow cyclists to reach the gyratory from Hammersmith Town Hall without having to follow Studland Street, Glenthorne Road and Beadon Road. The cycle track would be ‘stepped’, meaning it would be at a height between the road and footway, and become physically separated with a kerb east of Lyric Square. We would make room for the cycle track by reallocating some space from the pavement on the south side of King Street
    - Provide a short two-way section of cycle track on Queen Caroline Street to allow access to Black’s Road and Hammersmith Bridge Road
    - Enable cyclists to pass through the island at the junction of Hammersmith Broadway and Butterwick, and increase the size of the island to accommodate cyclists and pedestrians

    We would also make the following changes in the area:
    - Provide a new bus lane on Beadon Road, between Glenthorne Road and Hammersmith Broadway
    - Remove the pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road to allow for provision of the segregated cycle track
    - Install pedestrian countdown signals at the crossings of King Street, Beadon Road, Shepherd’s Bush Road, Queen Caroline Street, Hammersmith Broadway and Butterwick
    - Widen the footway on King Street where possible to provide more space for pedestrians in this busy area
    - Raise the carriageway to footway level on King Street opposite Lyric Square to make crossing more convenient for pedestrians and encourage slower motor vehicle speed
    - De-clutter pavements by rationalising locations of street furniture
    - Increased cycle parking
    - Relocate one loading bay and two disabled parking bays on Black’s Road to provide space for additional taxi rank spaces

    Why are we proposing this?
    TfL is investing £4bn in the Capital’s vital road network to ensure London’s roads are able to meet the needs of a growing population. As part of this plan, we are reviewing junctions and gyratories across London to make them safer for all road users, including cyclists, and to make journey times more reliable. Hammersmith gyratory is used by many cyclists each day, and can be an intimidating place to cycle. Hammersmith is one of the Mayor of London’s 33 priority “Better Junctions”.
    H&F Council’s cycling strategy sets out an ambitious plan to increase the number of people cycling in the borough to reach eight per cent of all journeys. Part of this plan is to deliver a segregated cycle route along the A315 corridor, a key commuter route for cyclists. Hammersmith gyratory lies on this route.
    We are proposing to give cyclists dedicated space and separate cycle signals at junctions on the northern side of the gyratory. This would offer cyclists a more comfortable and direct route between King Street and Hammersmith Road, bridging the gap in the proposed A315 cycling route that the gyratory currently creates.

    Removal of the pedestrian crossing
    To ensure cyclists have adequate space to wait for a green signal on the island at the south of Shepherd’s Bush Road, we would need to remove the existing pedestrian crossing that connects this island to the south side of Hammersmith Broadway.
    Although the crossing is less well-used than others in the area, its removal would mean pedestrians would have to find alternative routes. Those walking between the south side of Hammersmith Broadway and the west side of Shepherd’s Bush Road would need to cross Queen Caroline Street and Beadon Road. Those walking between the south side of Hammersmith Broadway and the east side of Shepherd’s Bush Road would have a choice between crossing Queen Caroline Street, Beadon Road and Shepherd’s Bush Road or crossing Hammersmith Broadway at its junction with Butterwick.
    The vast majority of pedestrians crossing Hammersmith Broadway from outside the Piccadilly Line tube station use the most western of the two crossings.

    Impact on buses
    Beadon Road is narrow and carries a high volume of buses and general traffic. To reduce delays currently experienced by buses approaching the gyratory, we would provide a new bus lane on Beadon Road between Glenthorne Road and Hammersmith Broadway, replacing one of the two general traffic lanes.
    We also would need to relocate bus stop Z5 on the gyratory, which is currently used for emergency purposes only, to Butterwick.

    How would bus and traffic journey times be affected?
    Our proposals would affect some journey times through the area. In the main these changes would not be significant, with some bus and general traffic journeys getting shorter and some getting longer. The most notable increases in journey times will be for traffic approaching Hammersmith gyratory from Fulham Palace Road in the morning and evening peaks.

    Impact on other road users
    We propose to relocate the position of one loading bay on Shepherd’s Bush Road, with the existing dimensions remaining, in order to allow for an increase in the size of the existing taxi rank.

    How does this fit in with the wider plans for Hammersmith town centre?
    TfL and H&F Council are working together on ambitious plans for a long-term transformation of Hammersmith town centre.
    We are proposing shorter-term improvements to improve safety and connectivity for existing cyclists and support the Council’s cycling strategy to increase the number of new cyclists in the area. This plan is separate to, and does not affect longer term proposals for the area, however these proposals would be integrated with any future schemes.

    Delivery of the wider A315 cycling improvements
    TfL and H&F Council are also working together on plans for an east-west cycling route along the A315. Plans for this route either side of Hammersmith gyratory are currently being developed, with public consultation planned to take place later this year.

    Please sign in to vote.
  • A205 Stanstead Road junction with Brockley Rise/Cranston Road

    Created by Simon Munk // 1 thread

    TfL Overview
    We are proposing to make changes on A205 Stanstead Road at two locations. One proposal includes improving the pedestrian crossing facilities at the junction of Brockley Rise and A205 Stanstead Road. The second proposal includes removing a loading bay from A205 Stanstead Road to Ravensbourne Road.

    What are we proposing?

    Brockley Rise
    We propose to install a new signal-controlled ‘staggered’ crossing on Brockley Rise. To achieve this, we propose to create a safer pedestrian waiting area by widening the central reservation, while maintaining the two lane approaches to the junction heading south along Brockley Rise. We propose to improve the footway layout by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
    We also propose to modify the loading and parking bays to allow for traffic to turn into Brockely Rise. The bay would be slightly shortened by 2.5m and moved north by 2.5m.

    Cranston Road
    Similar to Brockley Rise, we propose to install a new signal-controlled ‘staggered’ pedestrian crossing on Cranston Road. We would create a safer pedestrian waiting area by enlarging the central island. We would also improve the footway by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.

    Please sign in to vote.
  • A12 Eastern Avenue at B177 Barley Lane and Hainault Road

    Created by Simon Munk // 1 thread

    TfL Overview

    Why are we proposing this?
    The A12 Eastern Avenue is a major strategic road on the Transport for London Road Network linking the A406 North Circular Road to the M25 and the east coast via Essex.
    Barley Lane is a large junction on the A12 in the local area of Little Heath, close to Redbridge College and King George Hospital in the London Borough of Redbridge.
    Currently, the only formal pedestrian crossing point at the junction is a footbridge over the A12 Eastern Avenue, to the west. This crossing is not step-free.
    There is a long-standing issue with traffic congestion at the junction, frequently highlighted by local residents and also staff and visitors to the nearby King George Hospital.
    We are proposing new signalised pedestrian and cyclist crossing facilities and road layout improvements at the A12 Eastern Avenue junction with B177 Barley Lane and Hainault Road.
    Our proposals intend to help traffic flow more smoothly, reduce delays experienced by right turning traffic at the junction, and make it safer for pedestrians and cyclists to cross the road.

    What we are proposing?

    Key features

    Improved traffic flow
    We want to reduce congestion and delays to traffic using the junction, in particular on the A12 Eastern Avenue eastbound and B177 Barley Lane northbound. We propose:
    - Changes to the road layout to lengthen the right-turn lane on the A12 eastbound approach. This would improve traffic flow, offering additional road space and increased capacity for vehicles. We would create space by cutting into the central reservation. This would require the removal of one tree, which would also improve the line of sight for traffic as it approaches the junction
    - New traffic signals (see pedestrian crossing improvements below) with optimised signal timings so that the whole junction can operate more efficiently
    - An additional green light stage in the traffic light sequence for vehicles turning right from Barley Lane, heading northbound
    - New white line-markings to provide clearer direction to vehicles.

    Pedestrian crossing improvements
    We want to make it easier for pedestrians and cyclists to cross the road at the junction in a safer and more direct way. We propose:
    - New signalised pedestrian crossings on each section of the junction, replacing all existing unsignalised crossing points. This would require the removal of pedestrian guardrail on the north western arm of the junction
    - The introduction of new shared pedestrian/cycle ‘Toucan’ crossings on the southern arm of the junction. The new crossings would link with the existing shared-use path
    - More pavement space on pedestrian islands
    - Footway resurfacing to improve the current poor pavement. Tactile paving would be installed at all crossing points

    Further information
    If this proposal goes ahead we would reduce the speed limit on the A12 Eastern Avenue through the junction from 50mph to 40mph for safety reasons. The reduced 40mph speed limit would span approximately 200 metres east and west of the centre of the junction, creating a safer environment for pedestrians and traffic.
    We also plan to have a general tidy up at the junction. This could include the replacement of some vehicle barriers and pedestrian guard-railing, relocation of street lighting and signage, and new planting on the central reserve.
    The existing pedestrian footbridge to the west of the junction would remain unchanged under this proposal.
    These proposals are part of our Road Modernisation Plan, which consists of hundreds of projects to make London's road network safer and more reliable.
    Subject to the outcome of this consultation, we hope to start works during summer 2017.

    Please sign in to vote.
  • Proposed changes to the junction Kensington High Street with Warwick Gardens and Warwick Road

    Created by Simon Munk // 1 thread

    TfL Overview
    We are proposing to make improvements to pedestrian and cycling facilities around the junctions of Addison Road and Warwick Road with Kensington High Street.
    The location has been the site of an above average number of collisions in recent years, many of which involved vulnerable road users. Both junctions are used by high volumes of commuter traffic in west London, as well as by pedestrian visitors to local amenities such as Kensington Olympia Conference Centre. In response to the high collision rate we have worked with the Royal Borough of Kensington and Chelsea to develop a set of proposals that would provide safer crossing facilities at both junctions as well as improvements for cyclists.
    The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.

    What are we proposing?
    We are proposing new features at both of these junctions, including new signal-controlled pedestrian crossings and new advanced stop lines (ASLs) for cyclists.
    The following is a list of each of the proposed features. The order corresponds to the numbers shown on the map.
    1 Controlled, staggered pedestrian crossing at the junction of Warwick Road with Kensington High Street, to provide pedestrians with a dedicated time to cross the road in two stages using the central island
    2 Move bus stop on eastbound Kensington High Street away from the junction exit to allow cyclists better access across the junction
    3 Changes to bay on eastbound Kensington High Street to accommodate the moved bus stop and improve traffic flow. The bay would be moved slightly east and reduced from 15.3 metres to 10 metres in length to accommodate the moved bus stop. Operating times would be restricted to 10am-4pm Monday to Sunday. Max loading time would remain at 20mins
    4 New 5m cycle advanced stop lines (ASLs) on Kensington High Street eastbound and Addison Road southbound to provide cyclists with a waiting area ahead of the general traffic queue
    5 New signal-controlled ‘staggered’ pedestrian crossing at the junction of Addison Road with Kensington High Street to provide pedestrians with a dedicated time to cross the road in two stages using the central island
    6 Provide short section of bus lane and re-align road markings on westbound Kensington High Street to provide two full lanes past the bus stop. Hours of operation for bus lane would be Monday-Sunday 7am-7pm
    7 Resurface a section of carriageway on Kensington High Street to prevent water from collecting on the footway and carriageway
    8 New 5m ASL on the westbound approach to the junction to provide cyclists with a waiting area ahead of the general traffic queue
    9 New 5m ASL with central lead in lane on Warwick Road to help cyclists to travel ahead without conflict with left turning traffic
    10 Remove traffic island on Warwick Road to enable a safer movement for cyclists and other road users
    11 Re-align existing island on western arm of the junction to provide better access for left turning vehicles from Warwick Road
    12 Widen current 1m cycle lane to 1.5m on the eastbound approach to provide more space for cyclists
    13 Re-level footway on eastern arm of Holland Road to reduce the steep gradient

    Please sign in to vote.
  • Proposed changes to the junction of Cromwell Road with Gloucester Road

    Created by Simon Munk // 1 thread

    TfL Overview
    We are proposing to make improvements to pedestrian and cycling facilities around the junction of A4 Cromwell Road and Gloucester Road.
    The junction has been the site of an above average number of collisions in recent years, many of which involved pedestrians. Cromwell Road is both an important arterial road for vehicles entering or leaving west London, and also the location of several popular tourist attractions, attracting thousands of pedestrian visitors each day. In response to the high collision rate, we have worked with the Royal Borough of Kensington and Chelsea to develop two options that would provide safer crossing facilities at the junction as well as improvements for cyclists. Both options are included in this consultation.
    The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.

    What are we proposing?
    We have identified two options for this junction.
    The main difference between the two options is the type of pedestrian crossing on the eastern arm of Cromwell Road, closest to the Natural History Museum and the Victoria & Albert Museum.

    Option 1 would include a new signal-controlled ‘staggered’ two-stage crossing of the road, in which pedestrians would move to a traffic island in the centre of the road and then wait for a green light before passing to the opposite side. This approach would allow us to retain the current left turn for all traffic from the northern arm of Gloucester Road onto the eastbound Cromwell Road.
    These are the design features that are specific to option 1:
    ‘Staggered’ (two stage) signal-controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road in two stages using a central island
    Dedicated left turn lane on the western arm of Cromwell Road as the exit is reduced to two lanes, due to the widened central island needed to accommodate the staggered crossing

    Option 2 would provide a ‘straight across’ signal-controlled crossing of Cromwell Road in which the green light for pedestrians would enable them to cross in one movement, rather than waiting on a central island for a second green light. This would in most instances be a faster crossing for pedestrians compared to option 1, but would require the left turn from Gloucester Road to be banned for all vehicles in order to minimise additional waiting time for other road users. Our traffic count surveys show a peak hour average of 65 vehicles completing the left turn from Gloucester Road to Cromwell Road. These vehicles would need to use alternative routes.
    These are the design features that are specific to option 2:
    Straight across controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road
    Banned left turn from Gloucester Road to enable the proposed straight across crossing to operate on Cromwell Road without unduly increasing waiting times for other road users
    Re-align yellow box markings in the centre of the junction, to ensure the eastern side of the box is aligned with the layout of the proposed crossing on Cromwell Road

    Both options share many of the same features, such as pedestrian countdown features on the crossing of Cromwell Road, new advanced stop lines (ASLs) for cyclists and a new pedestrian refuge island on the northern arm.

    These are the features that would be included in both options:
    Part width 5 metre deep cycle advance stop line (ASL) on the eastern arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
    Widening of existing crossing area on the southern arm and left-turn slip road of Gloucester Road, to provide more space for pedestrians crossing the road
    Re-alignment of existing crossing on the western arm of Cromwell Road to better reflect the way pedestrians choose to cross
    Part width 5 metre deep cycle ASL on the western arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
    Kerb re-alignment on the western corner of the northern arm of Gloucester Road, to provide space for the new central island
    Pedestrian refuge island on the northern arm of Gloucester Road, to give pedestrians a protected place to wait when crossing
    Loading bay on northern arm of Gloucester Road moved slightly north, to provide space for the new central island and ensure vehicles can turn left from Cromwell Road. There would be no overall reduction in parking space
    Reduction of southbound lanes from two to one on the northern arm of Gloucester Road to provide space for a central pedestrian refuge island
    5 metre deep cycle ASL on the northern arm of Gloucester Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility. With option 1, this has the additional benefit of reducing conflict between cyclists and left turning vehicles.

    Please sign in to vote.
  • Central London Grid / Quietway - Earls Court Square area

    Created by Simon Munk // 1 thread

    These junctions are part of the Central London Grid - a set of connected routes for cyclists across central London comprising a network of Quietways and Cycle Superhighway routes.
    As part of the Central London Grid, a route is proposed to run between Brompton Cemetery and Exhibition Road, along Bramham Gardens, Earls Court Square and Kempsford Gardens. We are therefore proposing changes to the junctions to make it safer and easier for cyclists, pedestrians and vehicles to cross.

    What are we proposing?

    Junction 1 - Earls Court Road / Bramham Gardens / Earls Court Square
    The proposed changes include:
    - Removal of existing island on Bramham Gardens and extension of footway to reduce pedestrian crossing distance
    - Widening of the pedestrian crossings on Bramham Gardens and Earls Court Square
    - Removal of existing island on Earls Court Square and provision of new smaller island with dedicated cycle stop line

    Junction 2 - Warwick Road / Earls Court Square / Kempsford Gardens

    Warwick Road
    - New signalised junction to allow cyclists, pedestrians and vehicles to safely cross Warwick Road. The traffic signals will be co-ordinated with other signalised junctions in the area and the changes are not expected to have a significant impact on journeys times for road users through the area, although vehicles exiting Earls Court Square will have to wait for a green signal as opposed to waiting for a gap in traffic as at present
    - New signalised pedestrian crossing across Warwick Road on the southern arm of the junction. This new crossing will ensure that pedestrians can continue to cross Warwick Road safely and without significant delay
    - Existing signalised pedestrian crossing removed (replaced by crossing on the southern arm of the junction). The existing double red lines will be painted across the removed zig-zag markings at the crossing
    - Existing parking bay relocated 40m to the south-east on Warwick Road due to the new signalised junction. The existing restrictions would apply to the relocated parking bay.

    Earls Court Square
    - Vehicles permitted to travel straight over Warwick Road, westbound from Earls Court Square to Kempsford Gardens. This movement is currently banned
    - Dedicated signals installed to inform cyclists of when to safely proceed from Earls Court Square
    - Additional cycle stands provided to replace those removed from Kempsford Gardens
    - Footway re-aligned to maintain existing parking for motorcycles, car share and local residents

    Kempsford Gardens
    - Existing contra-flow cycle lane widened for cyclists travelling eastbound on Kempsford Gardens
    - Dedicated signals installed to inform cyclists of when to safely proceed from Kempsford Gardens
    - Existing speed hump to remain to help control speed of vehicles travelling westbound on Kempsford Gardens

    Please sign in to vote.
  • Central London Cycling Grid Borough High Street/Newcomen Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
    This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
    What are we proposing?
    Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
    Why are we proposing this?
    The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
    By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
    At construction stage the junction would also be resurfaced. Proposals for this junction are:
    Union Street
    Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
    Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
    Borough High Street
    Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
    Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
    Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
    All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
    Newcomen Street
    Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
    Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
    Existing footways widened to improve pedestrian accessibility.
    We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.

    Please sign in to vote.
  • East-West Cycle Superhighway - phase 2 consultation

    Created by Rosie Downes // 11 threads

    TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west

    The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.

    To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)

    Please sign in to vote.
  • TfL Consultation on Finchley Road - Boundary Road

    Created by Jean Dollimore // 1 thread

    TfL proposes some changes related to the QuietWay "Gladstone Park to Regents Park, see map

    https://www.google.com/maps/d/viewer?mid=zWlxfK2Ffon4.kSz3KHcSLaXQ

    Their proposals

    Finchley Road
    ============

    1. Ban the left turn for all northbound traffic (motor vehicles and cycles) from Finchley Road into Boundary Road. (Note "And Cycles"!)

    2. Extend the northbound bus lane on Finchley Road

    3. Changes to traffic islands to provide extra space and protection for cyclists travelling east-west along Boundary Road and crossing Finchley Road, as well as providing an improved waiting area for southbound cyclists turning right into Boundary Road from Finchley Road

    4. A new 5-metre part-width Advanced Stop Line (ASL) with early release (a few seconds) on Finchley Road for cyclists travelling southbound.

    5. Widen the existing pedestrian crossing to 3.2 metres on the southern arm of the Finchley Road junction

    6. Enlarge the footway on the south-west corner of the junction,

    Boundary Road
    ============

    7. A new 3.2 metre wide signal controlled pedestrian crossing on the western arm of Boundary Road

    8. Relocate and resize traffic islands to improve cyclists’ comfort

    9. Widen the existing pedestrian crossing to 3.2 metres on the eastern arm of Boundary Road

    10. Widen the central cycle feeder lane on the western arm of Boundary Road

    11. Replace speed cushions with a ‘sinusoidal’ speed hump across the full width of the carriageway on the west arm of Boundary Road

    12. New cyclist detection system on Boundary Road, meaning cyclists no longer have to use a push button to activate the traffic signals to cross or access Finchley Road

    See the consultation at:

    https://consultations.tfl.gov.uk/cycling/finchley-road-boundary-road
    ======

    Reply by 27th September 2015.
    To consultations@tfl.gov.uk

    Please sign in to vote.
  • TfL consultation on junction Farringdon Road/Calthorpe Street/Margery Street

    Created by Jean Dollimore // 2 threads

    N-S Cycle Superhighway consultation
    ------------------------------------------------------

    TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).

    After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.

    Link to our discussion on CycleScape
    http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation

    =========

    Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
    ---------

    See consultation on TfL's website at:

    https://consultations.tfl.gov.uk/cycling/kings-cross-road

    which has a link to their junction plan

    Plan to build September 2015

    -----------

    TfL's proposals include the following:

    On Farringdon Road - Grays Inn Road

    - right turn pocket for northbound cyclists turning into Margery Street

    -1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction

    - footway build outs

    Calthorpe Street

    - longer ASL and low-level early release signals

    - footway build out

    Margery Street
    - widen contraflow
    - longer ASL box and low-level early release signals

    Immediate issues:

    - no space for cycling on Farringdon Road south of the junction

    - northbound approach on Farringdon Road left hook issue

    - no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".

    - the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.

    Dates: consultation 20 February 2015; reply due 6 April 2015.

    Please sign in to vote.
  • The TfL North-South cycle superhighway consultation

    Created by George Coulouris // 4 threads

    Full details of the consultation are at:
    https://consultations.tfl.gov.uk/cycling/northsouth
    closing date for comments is 19 October 2014.

    Camden Cyclists we propose to send a response to this consultation on behalf of our members. This will focus only on the part within Camden (the section between Charterhouse Street and Euston Road - as detailed on the map attached). But note that the alignment of the route north of Greville Street is not agreed between Camden and TfL and is not formally considered a part of the consultation.

    So it makes sense to have two discussion threads for the sections in Camden south and north of Greville Street.

    Please sign in to vote.
  • A21 Bromley Common / Hastings Road and A233 Oakley Road junction improvement

    Created by Shaun McDonald // 1 thread

    Overview
    Working together with interested parties - including cycling, pedestrian and motorised road user organisations – we have reviewed the design of a number of key junctions identified as having road safety or other significant issues for cyclists and / or pedestrians.

    This junction was identified as having a particular cycle safety problem. We have therefore developed proposals to improve safety at the junction, in particular for cyclists.

    The responses to this consultation will help inform our decsion making as to whether we go ahead with the scheme as proposed or make changes to the scheme.

    Why We Are Consulting
    Our review of this junction has shown that there is a road safety issue for cyclists, in particular those travelling northbound along the A21.

    Our proposals for this junction are designed to improve sight lines to make it easier for cyclists, motorists and pedestrians to see each other and hence improve junction safety. In addition the opportunity will be taken to improve the informal pedestrian crossings to make these more visible and easier to use.

    Our proposed improvements include:

    Amended A21 and Oakley Road junction layout to bring the junction closer to a right angle – this will improve sight lines

    The cycle lane on A21 north bound (towards Bromley) will be widened to increase the separation of cyclists from other road users.

    Revised informal pedestrian crossings will be provided across Oakley Road and across A21 Hastings Road. A central island will allow roads to be crossed in stages. Informal crossing points offer pedestrians a safe point to cross, with tactile pavement for those with visual impairments.

    The right turn from Hastings Road to Church Road, which is not currently physically possible, will be specifically prohibited. The revised junction layout would make this a possible manoeuvre but it would conflict with right turning traffic into Oakley Road from the north and would not be a safe movement.

    We are not changing any other aspects of the junction. Traffic will still only be able to turn left (north) towards Bromley from Oakley Road, while Church Road will remain one way eastbound, with changes to the kerb layout to deter illegal movements.

    The map below illustrates our proposals.

    You can have your say on our proposals by following the link at the bottom of the page.

    Please sign in to vote.
  • King's Cross Junction consultation 2014

    Created by Richenda // 1 thread

    See: https://consultations.tfl.gov.uk/streets/kingscross
    Deadline: 24 March 2014

    Note: the most significant place in this proposal is the Gray's Inn Road/York Way route, where Deep Lee was killed in 2011.

    Drop-in sessions: 4 and 11 March 2014
    Time: 16:30 – 19:00
    Venue: King’s Cross Neighbourhood Centre, 51 Argyle Street

    CCC were consulted in advance and do not like the proposals. Our main objections are that these proposals:
    1. fail to meet TfL’s own 2005 Cycle Design Standards, on many points,
    2. put cyclists on the pavement at an extremely pedestrian-busy junction,
    3. fail to narrow the traffic heading into York Way down to one lane early enough. It narrows, already, to one lane once it reaches the bus stops in York Way, so it is perverse not to narrow it before the junction, thus freeing up space for a cycle lane to take cyclists safely through the junction.

    We have other more detailed objections which we will post later.

    Please sign in to vote.
  • TfL Consultation: Cycle and pedestrian improvements on the A21 Bromley Road from its junction with Canadian Avenue and Bargery Road, to Culverley Road

    Created by Shaun McDonald // 1 thread

    Overview
    Transport for London (TfL) would like your views on our proposals to make cycle and pedestrian improvements at the above location.

    Why We Are Consulting
    Canadian Avenue and Bargery Road form part of the London Cycle Network (LCN) in Lewisham. However, cyclists and pedestrians find it difficult to cross the A21 Bromley Road in the area, and there are a high number of cycle collisions on Bromley Road at its junction with Canadian Avenue. These proposals are aimed at reducing traffic speeds and making the area safer for cyclists and pedestrians.

    Cyclists

    A mandatory 2 metre wide cycle lane is proposed on Bromley Road southbound, from Culverley Road to the bus stop just south of Bargery Road. Bromley Road will be reduced from two to one lane southbound to accommodate the cycle lane. Traffic islands on Bromley Road around Bargery Road will allow physical segregation between the mandatory southbound cycle lane and other traffic, and kerb build-outs on Bargery Road will slow traffic at the junction itself.

    A 1.5 metre mandatory northbound cycle lane, widening to 2 metres, is proposed from south of Canadian Avenue to north of the junction where it merges with the existing bus lane on Bromley Road. The Canadian Avenue exit lanes onto Bromley Road will be reduced from two to one lane by building-out the kerb and providing a raised table to reduce the speed of those turning left towards Catford.

    Pedestrians

    A staggered zebra crossing across Bromley Road is proposed south of the junction with Canadian Avenue, with shared use areas on either side for pedestrians and cyclists (although cyclists must dismount to use the crossing). A new informal crossing is also proposed just north of the junction with dropped kerbs and tactile paving.

    The pedestrian refuge opposite St Laurence Church will be relocated further south towards Penerley Road where the road is slightly wider, so that the proposed cycle lane is a consistent 2 metres in width.

    Please see the drawing for more details:https://consultations.tfl.gov.uk/betterjunctions/improvements-on-the-a21-broml/user_uploads/a21-bromley-rd-canadian-av.pdf

    The width restriction into Canadian Avenue will remain.

    Given no unforeseen delays we intend to make these improvements in Autumn 2014.

    How to comment on the proposals:

    Please give us your views by completing the online form below by Friday 28 February 2014.

    https://consultations.tfl.gov.uk/betterjunctions/improvements-on-the-a21-broml/consult_view

    Please sign in to vote.