Things tagged 'tfl_consultation'

limited to the area of Cyclenation:

76 issues found for 'tfl_consultation':

  • Lumley Rd / A217 / no right turn

    Created by Marcus Howarth // 1 thread

    From https://haveyoursay.tfl.gov.uk/lumley-road

    This is in response to a high number of collisions having been recorded at this location involving vehicles turning right from Lumley Road, and northbound traffic on St Dunstan's Hill. Local residents and stakeholders have also raised concerns about this junction. We are now holding a public consultation on our proposals, running from 7 June to 18 July 2021, and you can find details of how to take part below.

    We propose making the exit from Lumley Road onto St Dunstan's Hill left turn only. To enforce this, we propose installing a pedestrian island in the carriageway at the end of Lumley Road, which would help prevent vehicles from turning right. This island would include dropped kerbs and tactile paving. As well as prohibiting the right turn, this would also provide a safer and easier crossing point for pedestrians and cyclists crossing Lumley Road.

    From impact assessment

    • . In the past three years, there have been eight collisions at this junction. Of these collisions, four have involved motorcyclists (vulnerable road users).
    • The proposed (triangular type) pedestrian island will make it easier for disabled pedestrians to cross Lumley Road safely. The island will have sufficient space for a wheelchair user. Tactile paving will be installed to help a visually impaired pedestrian identify the edge of the footway and the cycle track.

    Please sign in to vote.
  • Ilford - Barking Riverside Cycleway

    Created by Simon Munk // 6 threads

    This 7km route will link Ilford to Barking Riverside via Barking town centre using mostly quieter back streets. It would include key connections to the cycle route between Barking and Tower Gateway, Ilford Elizabeth line station and Barking Riverside Development - this includes more than 10,000 new homes and a new London Overground station.

    Please sign in to vote.
  • Lea Bridge - Dalston cycle route

    Created by Simon Munk // 2 threads

    This 3km route would fill the gap between Lea Bridge and the existing cycle route between the City and Tottenham at Dalston. From Lea Bridge the proposed route heads towards Lea Bridge Road to Lea Bridge roundabout, after which it joins quieter back streets including Downs Park Road and Sandringham Road to connect through to Dalston.

    Please sign in to vote.
  • Safer Junctions - Kingsland Road and Balls Pond Road

    Created by Simon Munk // 1 thread

    TfL says:

    Overview

    We are proposing to make some changes to the junction between A10 Kingsland Road and Balls Pond Road, also known as Dalston Junction in Hackney.  

    Background

    Our Safer Junctions programme is reducing road danger at some of the most hazardous junctions in London. These junctions have high collision rates for vulnerable road users, including people walking and cycling. This programme directly contributes to our Vision Zero target to stop people from dying and being seriously injured on London’s road network by 2041.

    The objectives of the programme are to:

    • Reduce road danger and help eliminate Killed and Seriously Injured (KSI) collisions
    • Help create streets where people feel safe to walk, cycle and use public transport
    • Make hostile junctions more welcoming and less dominated by motor vehicles, demonstrating the Healthy Streets Approach

    Why we are proposing to change the junction?

    In the three years up to 31 October 2016, 16 collisions occurred which resulted in people being injured. Five of these collisions involved pedestrians (three on the southern arm, one on the western arm and one on the northern arm). Historic trends also highlight a significant risk for cyclists, although this was not captured as a trend within the 2016/17 study period.

    Changing the layout of this junction would:

    • Reduce road danger by providing more space and priority to people walking or cycling
    • Restrict some vehicle movements to reduce conflict with other road users
    • Make journeys by foot to and from Dalston Junction easier with wider and more direct pedestrian crossings, encouraging more journeys by walking, cycling or public transport
    • Create a more welcoming retail and leisure environment, encouraging people to spend more time in the area

    What are we proposing?

    The proposals are to upgrade the existing junction in a number of ways:

    • Widening the footway to the north, east and western arms to improve the space for people walking
    • Installing coloured surfacing on all pedestrian crossing points to make it easier and safer to cross
    • A new cycle feeder lane into the Advanced Stop Line southbound on A10 Kingsland High Street
    • Banning the left turn eastbound from A10 Kingsland High Street into Dalston Lane for all vehicles except cycles
    • Raising the pedestrian crossing on Dalston Lane at the top of Dalston Square to slow speeds making it easier and safer for people to cross
    • Closing Kingsland Passage to motor vehicles and installing of new seating for places to stop and rest

    A plan showing all the proposed changes is below. These changes are intended to make the junction safer for all users, while significantly improving the environment for people walking and cycling, improving access to Dalston Junction Overground station.

    Kingsland Road/Balls Pond Road proposals (PDF 704KB)

    Healthy Streets  

    The changes proposed in this scheme are part of our commitment to deliver the Healthy Streets Approach. We are taking this approach to create a vibrant, successful city where the streets are welcoming to all and everyone can live active, healthy lives. The streets within this scheme and the proposed changes have been assessed by our designers against ten Healthy Streets Indicatorsusing our Healthy Streets Check for Designers tool. This tool assesses the layout of streets against thirty one measures which produce an overall Healthy Streets Check score out of 100. We use infographics to show the current score for the streets within this scheme and potential scores based on our proposed changes. The Healthy Streets results can be seen in the diagram below.

    Kingsland Road/Balls Pond Road Healthy Streets results (PDF 132KB)

    Equality Impact Assessment

    We are subject to the general public sector equality duty set out in section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics. The protected characteristics are: age, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and sexual orientation.

    In considering changes to the design of our streets, we closely consider the needs of all users throughout the design process and complete a draft Equality Impact Assessment (EqIA). The draft EqIA can be found below.

    Kingsland Road/Balls Pond Road Equality Impact Assessment (PDF 162KB)

    Traffic impacts

    We have carried out analysis to understand the impact of the above proposals.  We predict no significant impacts to general traffic or bus journey times on the A10, Dalston Lane or Balls Pond Road. No significant impact on journey times for general traffic or buses travelling along the A10. 

    Please sign in to vote.
  • TfL Safer Junctions - Edgware Road and Harrow Road consultation

    Created by Dominic Fee // 1 thread

    Shortened description from TfL webpage https://consultations.tfl.gov.uk/roads/edgware-road-junction/:

    "We would like to know your views on proposals for the junction of Edgware Road and Harrow Road in the Paddington/Marylebone area.

    Background

    Our Safer Junctions programme is reducing road danger at some of the most hazardous junctions in London. These junctions have high collision rates for vulnerable road users, including people walking and cycling. This programme directly contributes to our Vision Zero target to stop people from dying and being seriously injured on London’s road network by 2041.

    The objectives of the Safer Junction programme are to:

    - Reduce road danger and help eliminate Killed and Seriously Injured (KSI) collisions
    - Help create streets where people feel safe to walk, cycle and use public transport
    - Make hostile junctions more welcoming and less dominated by motor vehicles, demonstrating the Healthy Streets Approach

    Why we are consulting

    In the last three years there were 29 personal injury collisions, of which five resulted in serious injuries (17.2%).

    A number of issues have been identified with the current junction layout:

    - Pedestrians not using designated crossing points
    - Existing pedestrian islands are narrow
    - There is a lack of cycle facilities, especially southbound where the road layout is not cycle friendly

    Our proposals

    We would like your views on the following proposals which aim to reduce the above issues.

    Applies to the whole junction

    - Introduce a 20mph speed limit across the junction
    - Widen all pedestrian crossings to make for a more comfortable and safer crossing

    North of the flyover

    - Ban left turn from Harrow Road into Edgware Road northbound
    - Build out northwest corner to remove slip road and provide a better pedestrian environment
    - Convert staggered crossing to straight across crossing to create better and safer routes to and from Edgware Road Bakerloo line station
    - Make Bell Street no exit onto Edgware Road
    - Change current three lane road layout to two traffic lanes and a cycle lane through the junction
    - Widen southbound bus lane to 4.5m as it passes the bus stop
    - Install cyclist early start signal on southbound Edgware Road

    South of the flyover

    - Convert the short section of Edgware Road northbound bus lane beneath the flyover, into cycle lane
    - Install a cyclist early start signal at the junction heading northbound on Edgware Road
    - On Harrow Road westbound reduce the road width to two lanes by building out the footway on the southwest corner, to provide a better pedestrian environment
    - Reduce the width of the westbound slip road from Marylebone Road to one 4.5m lane by building out the footway on the southeast corner of the junction to provide better pedestrian environment
    - Remove the guardrail and narrow the pedestrian island of the pedestrian crossing to the south of the flyover to allow for an 8.0m width on the southbound Edgware Road to prevent traffic merging with cyclists

    Additional proposals for the area around the junction

    These proposals are not part of the Safer Junction improvements. However, opportunities have been identified to improve air quality and priority space for buses in the area and we would like to know your views on these additional proposals.

    Improving the road layout for northbound buses

    Just north of the Edgware Road/Harrow Road Junction the road narrows and creates a bottleneck for traffic.

    Changing the footpath layout here allows for the bus lane to be extended north of Newcastle Place, removing the bottleneck for northbound buses."

    Westminster Cycling Campaign will be preparing and submitting a response to this consultation, and we will be grateful for any comments you provide. TfL usually describes responses in quantitative terms, e.g. 'XX% of reponses supported or strongly supported the proposals', so we therefore encourage you to submit your own response too.

    Please sign in to vote.
  • Proposed improvements between Wood Lane and Notting Hill Gate

    Created by Simon Munk // 1 thread

    TfL says:

    We want your views on our proposals to transform roads in west London through four connected neighbourhood improvement schemes between Wood Lane and Notting Hill Gate.

    The proposals are an important part of the Mayor's Transport Strategy. The proposals are guided by the Mayor's Healthy Streets Approach, which aims to encourage walking, cycling and public transport and make London greener, healthier and more pleasant. The proposals are also an important part of the Mayor's Walking and Cycling Action Plans. These complementary plans set out how we and London boroughs will work to increase the number of people walking and cycling, helping to address poor air quality and congestion, while improving infrastructure to make walking and cycling even easier, safer and more accessible for everyone.

    These proposals would provide benefits for road users and communities in these areas, making it easier to cross busy roads, removing through traffic on some residential roads and offering a segregated space for people to cycle in west London. They would form part of London’s emerging cycling network and create a more appealing street environment for everyone to enjoy.

    The proposals include:

    • New and upgraded pedestrian crossings
    • Public space improvements along the route to create more welcoming streets for people and communities to enjoy
    • Two-way segregated cycle track throughout
    • Changes to bus stop locations, with removal of some, and layout changes throughout, including new bus stop bypasses for cyclists
    • Making some side roads entry or exit only to help the safe and timely movement of traffic
    • Removal of some trees in Notting Hill Gate and Holland Park Avenue to accommodate the facilities with appropriate new trees planted nearby
    • Changes to parking and loading bays and hours of operation  

    The proposed changes presented in this consultation are not final. We welcome your views on our proposals and your feedback will inform how we progress the schemes.

    Please sign in to vote.
  • Proposed A10/Lincoln Road Walking and Cycling Improvements

    Hamish F // 1 thread

    From the consultation hub, verbatim:

    These proposals are part of a wider TfL programme to encourage people to choose to cycle or walk in Enfield, which is being implemented by Enfield Council in partnership with us. We would like to hear your views on the proposals.

    What are we proposing?

    We propose to upgrade the existing staggered pedestrian crossing on the northern arm of the junction between Lincoln Road and the A10. The crossing would be made wider and would become a toucan crossing, enabling cyclists to use it as well. The existing zebra crossing on the western arm of Lincoln Road would become a parallel cycle/zebra crossing.

    Some areas of footway would be widened to enable people to access to both crossings more easily. The changes to the footway would mean that the entrance to the residential access road which joins Lincoln Road at the junction with the A10 would become narrower, and exiting vehicles would be asked to give way to any vehicles wishing to enter.

    See the website link for details including drawings and to submit comments.

    Enfield Cycling Campaign intends to submit a considered response after discussion.

    Please sign in to vote.
  • New pedestrian crossing, Warwick Road

    Created by Simon Munk // 1 thread

    TfL overview:

    Having listened to concerns from local residents regarding road safety and the local environment in the Warwick Road area, we are proposing a package of improvements aimed at making this stretch of Warwick Road feel more safe, comfortable and pleasant for residents and visitors.

    New pedestrian crossing 

    We are proposing a new signalised pedestrian crossing close to the entrance of Kendall House (Kensington Row) on Warwick Road between Pembroke Road and Kensington High Street. This will provide a safe option for people wishing to cross this part of Warwick Road. The crossing will have a raised table (meaning it will be level with the pavement) making it easier to cross and helping to reduce the speed of traffic. We will also make the pavement wider on the eastern side of the road, again to help slow traffic on the approach to the crossing. The crossing will have pedestrian countdown facilities, and audible signals with a tactile cone to help people with sight or hearing difficulties. These will be turned down overnight to avoid disturbing nearby residents.

    Installing the crossing at this location does mean that a small section of the on-street parking on the eastern side of Warwick Road will need to be slightly reduced. However, this will only affect one parking space, and we do not anticipate this will have a significant impact on parking in the area.

    Public space improvements

    Alongside the new crossing, we are also proposing some improvements to make the area feel more pleasant and safe for local people. This includes:

    • Renewing the pavement outside Kendall House with better quality ‘York’ stone which matches to the rest of the pavement along the street
    • Extending the kerb and footpath to the north of Kendall House
    • Repairing the footpath at the base of the tree to the north of Kendall House (please note we will not be removing the tree)
    • Installing large box planters to act as a barrier for this part of the road. These would contain planting to help green and improve the feel of the area.     

    Please sign in to vote.
  • Camden - Tottenham Hale cycle route

    Created by Simon Munk // 4 threads

    At approximately 12km, this route would connect the town centres of Tottenham Hale, Seven Sisters and the Nag's Head, making it easier for people to make local journeys and use local services. The route would use both main roads and quieter back streets.

    Please sign in to vote.
  • Hackney - Isle of Dogs cycle route

    Created by Simon Munk // 2 threads

    This 7.5km route would stretch from Hackney to the Isle of Dogs via Westferry, Mile End and Victoria Park. It would connect with the cycle routes between Stratford and Aldgate and Barking to Tower Hill, as well as the proposed Rotherhithe to Canary Wharf crossing. There are currently two options in Hackney we want your views on.

    Please sign in to vote.
  • CS9: Kew Bridge, Kew Bridge Rd and Duke Road

    Created by Hounslow Cycling Campaign // 1 thread

    https://consultations.tfl.gov.uk/roads/kew-duke/

    Online Survey

    Overview

    We consulted on our proposals for Cycle Superhighway 9 in autumn 2017. The route is an important part of the Mayor’s Healthy Streets Approach, which aims to make London greener, healthier and more pleasant through encouraging walking, cycling and the use of public transport.

    We have published an analysis of the responses and our response to the issues raised here. The feedback we received was valuable in helping us to further improve the scheme.

    In response to feedback received through the consultation, we are now carrying out a further consultation on two parts of the route:

    • Kew Bridge and Kew Bridge Road (High Street Brentford to Wellesley Road)
    • Duke Road and Duke’s Avenue’s junction with Chiswick High Road 

    We would like to hear your views on these further proposals. A map of the areas where we are carrying out further consultation can be found below.

    Kew Bridge and Duke Road overview map (PDF 989KB)

    Other than the two sections identified for further consultation, we will be progressing our plans for the route as outlined in the Response to Issues Raised report. No further consultation is planned on the proposals for the route except for the two parts of the route above. We will carry out local engagement on the rest of our proposals later in the process. We are intending to proceed with our proposals subject to formal approvals.

    Following feedback from respondents and the Mayor’s announcement of a new brand for London’s growing network of high-quality cycle routes in the Mayor’s Transport Strategy, this route will no longer be called a Cycle Superhighway. We will work closely with our borough partners on the most appropriate wayfinding for this scheme.

    Kew Bridge and Kew Bridge Road (High Street Brentford to Wellesley Road)

    The main change we are proposing is to provide a segregated two-way cycle track on the south side of Kew Bridge Road and South Circular Road. Previously we proposed with-flow segregated cycle tracks and a bus lane on Kew Bridge Road, the South Circular and also between Wellesley Road and High Street Brentford (including Kew Bridge junction).

    This change provides full segregation for cyclists throughout this section and removes the requirement for two bus stop bypasses we proposed on the north side of Kew Bridge Road. The change also addresses concerns raised about cycle safety at Kew Bridge junction, Green Dragon Lane and Lionel Road South.

    We are also proposing a second southbound traffic lane on Kew Bridge to make the junction operate more effectively and to maintain bus journey times in the area.

    In summary, our proposals for this section of the route include:

    • A segregated two-way cycle track on the southern side of Kew Bridge Road and South Circular Road
    • Improved cyclist access between Capital Interchange Way and Wellesley Road
    • Improved pedestrian and cycle crossings at Kew Bridge junction
    • A new pedestrian crossing across Kew Bridge Road at High Street Brentford
    • Creating an additional southbound traffic lane on Kew Bridge
    • Changes to bus stops at Kew Bridge Station
    • Changes to bus lane operating hours reverting them back to the original hours of operation
    • Parking bays on South Circular relocated to accommodate the cycle track

    A map of the proposals for Kew Bridge and Kew Bridge Road to Wellesley Road can be found below.

    Kew Bridge and Kew Bridge Road proposals map (PDF 2.35MB)

    Appendix A - detailed information on these proposals (PDF 237KB) 

    The original proposals for this section can be found here

    Duke Road and Duke’s Avenue’s junction with Chiswick High Road 

    The main change we are proposing is to ban the right turn out of Duke Road onto Chiswick High Road for all traffic (except cyclists) in response to safety concerns. Traffic would be able to use Annandale Road to exit east onto Chiswick High Road instead. We previously proposed to reduce Annandale Road from two lanes to one at its junction with Chiswick High Road. We are now proposing to keep two lanes on exit at this junction to facilitate traffic that may be redirected from Duke Road.

    We are also proposing to maximise pavement space outside Our Lady of Grace and St Edward Church, in response to local concerns. This will require the reduction of eastbound traffic lanes on Chiswick High Road from two to one. 

    We proposed four additional pay and display bays on the west side of Duke’s Avenue. Following feedback from the consultation and our discussions with Our Lady of Grace and St Edward Church we are no longer proposing these bays and will instead retain the existing single yellow line as this will provide more opportunity for parking for Church services. Additionally, one proposed space on the eastern side of Duke Road opposite Bourne Place has been removed to ensure vehicles can exit this junction.

    In summary, our proposals for this section of the route include:

    • Duke’s Avenue converted to entry-only; Duke Road converted to exit-only with a banned right turn, addressing collisions involving vehicles turning at Duke Road
    • The eastbound approach to Duke’s Avenue would be reduced to one lane
    • Changes to parking and loading on Chiswick High Road, Duke’s Avenue and Duke Road
    • Maintaining pavement space outside the Catholic Church, extending pavement space elsewhere where possible and planting new trees

    The segregated two-way cycle track on the southern side of Chiswick High Road has been retained.

    A map of the proposals for Duke Road and Duke’s Avenue junction with Chiswick High Road can be found below.

    Duke Road and Duke's Avenue proposals map (PDF 968 KB)

    Appendix B - detailed information on these proposals (PDF 241KB) 

    The original proposals for this section can be found here

    How would the proposals affect journey times?

    We have carried out detailed traffic modelling on the proposals to understand how our proposals might affect journey times for general traffic, buses, cyclists and pedestrians.

    Despite the sophistication of our traffic models, all traffic modelling is only ever indicative; it is intended to give an idea of where the impacts of changes in journeys are most likely to be felt. It assumes that drivers have perfect knowledge of the network and will always choose the quickest route available

    We have undertaken traffic modelling on the proposed changes to the scheme, which has indicated the following:

    Kew Bridge section

    This section has undergone extensive design changes following feedback from the previous consultation, including concerns about the impact on journey times through the junction. The new design changes the ‘with flow’ cycle track into a bi-directional cycle track and provides additional capacity north and southbound on Kew Bridge. As a result, three approaches to the junction will have either an increase in green signal time or an increase in lane capacity, which leads to improved journey times on bus routes 237 and 391 in both directions and bus route 65 east bound compared to the previous designs. One approach to the junction will see a reduction in green signal time which as a consequence, has a minor negative impact on journey times for the 65 westbound bus route.

    Duke’s Avenue section

    The design changes at this location have been made to protect trees and retain footway space outside Our Lady of Grace and St Edward Church. There is no longer a right turn lane, but there is space in front of the stop line for up to two right turning vehicles without blocking vehicles travelling east, including buses. As the predicted traffic volumes are low, this junction is expected to operate effectively and the design change is predicted to have minimal impact on overall bus and traffic journey times.

    Detailed results of our traffic modelling can be found below.

    Traffic modelling results AM (PDF 186KB)  

    Traffic modelling results PM (PDF 185KB)

    Equalities

    We are subject to the general public sector equality duty set out in section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics.

    Our autumn 2017 consultation set out how we had due regard to the duty and can be found here

    We have updated our Equality Impact Assessment (EqIA) for the proposed changes. The EQIA completed for this scheme shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme proposes a number of improvements to pedestrian facilities including enhanced crossing facilities, increased pavement widths and new pedestrian crossings.

    Some negative impacts have been identified where pavements are proposed to be cut back or shared use is proposed, however we have ensured that they are appropriate for number of pedestrians in the area and that they allow two wheelchair users to pass safely. Shared use areas would be provided only where there is sufficient space for pedestrian and cyclists. Some negative impacts have also been identified where we are proposing to install bus stop bypasses. We recently agreed therefore to include zebra crossings at all bus stop bypasses. The crossings would have tactile paving and would be raised to footway level to create a flush surface.

    Public drop-in events and have your say

    We will be holding public drop-in events at which staff involved in the project will be available to answer your questions:

    • Wednesday 6 February 2019 (17:00 to 21:00), Clayton Hotel Chiswick, 626 Chiswick High Road, W4 5RY
    • Saturday 16 February 2019 (11:00 to 15:00), Museum of Water and Steam, Green Dragon Lane, Brentford, TW8 0EN

    You can let us know your views on these proposals by taking part in our online survey below.

    Have your say

    We would like to know what you think about our proposals.

    Please give us your views by completing the online survey below by Tuesday 26 February 2019.

    Alternatively, you can:

    You can also request paper copies of all the consultation materials and a response form by emailing consultations@tfl.gov.uk, or writing to FREEPOST TFL CONSULTATIONS.

    Have your say

    Online Survey

    Please sign in to vote.
  • Proposed changes to the road layout on A21 Tweedy Road, Bromley North

    Created by John H Wood // 1 thread

    TfL are planning changes to the road layout on the A21 Tweedy Road at the junctions of Sherman Road, East Street and Mitchell Way in Bromley North, and are consulting.

    Their plans form part of the Mayor of London’s long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming.

    By making these changes TfL aim to:

    • Create a safer and more pleasant environment for cyclists and pedestrians with new, direct crossings and new traffic signals for cyclists
    • Provide more space for buses leaving the bus stands at Bromley North so they can access bus stops more safely and easily, which would improve their reliability
    • Update the street environment with resurfacing, new signage and refreshed road markings, to complement the public realm style of Bromley North village

    Please sign in to vote.
  • Balls Pond Road Cycle Superhighway 1

    Created by Simon Munk // 1 thread

    Hackney council says:

    Hackney Council is working with Islington
    Council and Transport for London (TfL) to make
    improvements to the Cycle Superhighway Route
    1 (CS1) on Balls Pond Road.

    In February 2015 TfL in partnership with
    Hackney Council consulted on the CS1 route
    which included two options for Balls Pond Road:
    an option for advisory cycle lanes on each
    side of the road and an option for a two-way
    segregated cycle track. A positive response to
    the consultation was received showing overall
    support for the segregated two-way cycle track
    along Balls Pond Road.

    In autumn 2015 a second consultation was
    held by TfL in partnership with Hackney Council
    on a motor traffic reduction scheme in the De
    Beauvoir area to assist users of the CS1 route.
    We are now seeking your views on measures
    required to implement the segregated two-way
    cycle track along Balls Pond Road between the
    junctions of Culford Road and Kingsbury Road.
    These measures would complete the route, safely
    connecting the two halves of the CS1.

    Please sign in to vote.
  • Duke Hill St/Tooley St

    Created by SallyEva // 1 thread

    Proposals include:

    Introducing a 20mph speed limit along entire length of Duke Street Hill/Tooley Street (between Borough High Street and Tower Bridge Road)
    Introducing a 2 metre wide mandatory cycle lane westbound, on Duke Street Hill/Tooley Street, running between Borough High Street and Bermondsey Street junctions, separated from traffic with wands on the Duke Street Hill section
    Introducing a protected right turn ‘pocket’ for cyclists waiting to turn right into Bermondsey Street from Tooley Street
    Making Duke Street Hill no entry, apart from cyclists and buses, from the junction with A3 Borough High Street. This will mean that eastbound traffic along Duke Street Hill and Tooley Street as far as the junction with Bermondsey Street is restricted to buses and cycles only.
    Restricting access from side roads onto Tooley Street to westbound travel only. Any motorized vehicle turning onto Tooley Street from the following roads will not be able to turn onto and travel eastbound towards Bermondsey Street:
    Tooley Street onto Duke Hill Street
    Bridge Yard onto Tooley Street
    Cottons Lane onto Tooley Street
    Hay’s Lane onto Tooley Street
    Battlebridge Lane onto Tooley Street
    Westbound traffic will continue to be able to travel along this section of highway as it does at present (i.e. accessing via Bermondsey Street or from roads further east) which lead onto Tooley Street.

    This will be an interim scheme, reducing traffic in the short term. We are working on a more transformational scheme for Tooley Street, to extend the high-quality cycling provision proposed as part of Cycle Superhighway 4 towards London Bridge.

    Please sign in to vote.
  • Hounslow Draft Local Implementation Plan Consultation

    Created by Hounslow Cycling Campaign // 3 threads

    Local Implementation Plan released for consultation by London Borough of Hounslow.

    a. CS9 is referenced many times in the document (such as p.31 "The implementation of CS9 would create opportunities for new orbital routes into neighbouring residential areas and transport hubs").however it is also sometimes qualified by "if approved" and proposals will have dependencies upon CS9 going ahead.
    b. We get a mention on p.31 "Local groups such as the Hounslow Cycling Campaign can provide important knowledge on local demand and suggestions for improvements." Yey!
    c. Section 3.1.4 and Appendix D reference Propensity to Cycle tool results for the borough.
    d. Section 3.1.5 references cycle routes to Heathrow. While Heathrow airport isn't within Hounslow, it is the largest employer of borough residents. Our guess is that additional funding from TfL and Heathrow will be required to address Heathrow cycle access.
    e. Section 3.1.6 references a cycle network for the borough. This is the first time we have seen reference to a "Hounslow Priority Cycle Network" as previously, projects have been disconnected individual projects. CS9 provides the "spine" for this network.
    f. There is reference to 2 Liveable Neighbourhoods bids for Feltham and Dukes Meadows. We have heard that "Dukes Meadows" will actually be called "Chiswick South" in the bid. The details of these bids are not within the LIP but we have heard the "Chiswick South" bid has a mixture of public realm improvement, school streets and creation of filtered permeability cells in the Grove Park area of Chiswick.

    Please sign in to vote.
  • TfL's proposed changes to junctions along Edgware Road

    Created by Dominic Fee // 1 thread

    From TfL webpage https://consultations.tfl.gov.uk/roads/edgware-road/ :
    "We are proposing changes to junctions along Edgware Road, between the Marylebone Flyover and Marble Arch, which will improve safety for pedestrians, and other road users.

    Our proposals include:

    - Creating new pedestrian crossings, with green and red man signals
    - Adding count down timers to new and existing crossings
    - Creating more space for pedestrians on the pavement
    - Limiting speed for vehicles to 20 miles per hour
    - Providing new Advanced Stop Lines (cycle boxes) for cyclists"

    Please sign in to vote.
  • Sutton Tram Link

    Created by Marcus Howarth // 1 thread

    see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link

    Here's the overview from TFL:

    Overview
    We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.

    The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.

    Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.

    Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.

    BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.

    From LCC -

    general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.

    Please sign in to vote.
  • Tooting Town Centre consultation

    Created by jon_events // 1 thread

    TfL have published this consultation for Tooting Town Centre.

    The brief was a pedestrian improvement scheme, so don't be too surprised that there is lots of room for improvement. I'll add further comments when I've got a bit more time.

    Please sign in to vote.
  • A3220 Cheyne Walk with Lots Road junction

    Created by Simon Munk // 1 thread

    TfL says:
    The A3220 Cheyne Walk runs east-west along the northern Thames embankment. Its junction with Lots Road is used moderately by cars, cyclists and buses and the footways are busy with pedestrians. Cycle flows at the junction are relatively high.
    We are proposing improvements that will make it easier and safer for people to walk and cycle across Cheyne Walk, while also making it easier for turning HGVs by increasing the road space and improving sight lines.

    What are we proposing?
    Installing a new signal-controlled toucan crossing to replace the existing zebra crossing. The crossing will feature a Countdown unit, and will be configured to reduce pedestrian wait times, making it easier and safer for people to walk and cycle across Cheyne Walk
    Enhance the existing shared-use footway on the southern side of Cheyne Walk to provide more space for pedestrians, as well as an enhanced cycling connection to Lots Road
    Upgrading paving throughout the area to help visually impaired and blind people, improving conditions for vulnerable users
    Providing a new ramped inlet on the northern side of Cheyne Walk to provide safe and easy access to the toucan crossing
    Re-landscaping the pedestrian island on Lots Road to make vehicle movements easier and safer for all road users
    Subject to the outcome of this consultation, we plan to implement these changes in 2019.

    Will these changes affect your journey?
    These changes are designed to ensure that pedestrians and vulnerable people have a safe way to cross Cheyne Walk, while improving the movement of traffic throughout the area.
    Our modelling shows that the junctions will continue to operate efficiently and the changes will have little impact on journey times through the area. We will monitor the completed scheme to ensure it is operating as expected and make adjustments as required.

    Please sign in to vote.
  • Stoke Newington Gyratory

    Created by Simon Still // 1 thread

    We have worked with Hackney Council on proposals for how Stoke Newington would look and operate after the gyratory is removed. Our plans would provide a new northbound cycle track on the A10 and a new bus and cycle lane enabling people to cycle southbound on Stoke Newington High Street.

    This would remove a significant barrier to cycling in the area and provide new traffic-free public spaces to meet, shop, play and relax and a host of other improvements aimed at creating a more attractive and less traffic-dominated environment for people.

    Our plans will accommodate the area’s future growth and encourage active travel, with more people choosing to walk, cycle and use public transport and less people travelling by car.

    These proposals aim to improve the quality of life in the area by:

    Transforming the town centre by creating a single unified retail location with an enhanced environment for pedestrians and cyclists
    Improving the public transport interchange, achieved through two-way bus operation, reducing congestion, and simplifying bus stops
    Improving cycling facilities and access through the A10
    Encouraging more journeys by walking, cycling or public transport to/from the High Street
    Reducing rat-running in residential streets

    Our proposals would:

    Introduce a new northbound cycle track with bus stop bypasses on Stoke Newington High Street providing a dedicated space for people to cycle
    Introduce a new southbound bus and cycle lane along Stoke Newington High Street. Most buses and bikes will no longer travel the longer route along Northwold, Rectory and Manse Road when heading towards the City. This will provide better access to High Street facilities
    Introduce two-way traffic operation along Rectory, Manse and Evering Roads
    New modal filters at the junctions of Tyssen, Hollar and Batley Roads at their junction with the High Street. These closures are designed to reduce rat-running through residential streets
    Create three new ‘pocket parks’ where these roads are closed to traffic, creating a more welcoming retail environment and encouraging people to spend more time in the town centre. There could be new seating areas, trees, local community gardens, entertainment, and cycling parking spaces
    Restrict vehicular access eastbound to Evering Road from Manse Road and to Northwold Road from Rectory Road
    Introduce a new type of pavement treatment at side road junctions called a ‘continuous footway’. Introducing continuous footways in Stoke Newington High Street intends to emphasise that pedestrians have priority
    Introduce three new pedestrian crossings, all with pedestrian countdown, making streets in the area easier and safer to cross
    Introduce a new 20mph speed limit and raised junctions and crossings to slow traffic speeds and reduce road danger
    Formalise parking and loading bays, including hours of operation
    High Street south of Brooke Road: Monday - Sunday from 07:00 - 19:00 , 20 minutes loading and one hour parking only
    High Street between Brooke Road and Stoke Newington Church Street: Monday - Sunday from 07:00 - 10:00, 20 minutes loading only

    Please sign in to vote.
  • ASLs at Dulwich Common/Lordship Lane junction, nowt else

    Created by SallyEva // 1 thread

    This is a junction on the south circular by the (now closed) Harvester pub.

    Notoriously frightful it had no pedestrian crossings whatsoever -- just scurry across folks -- and naturally cyclists were expected to take their lumps.

    Proposal is to give pedestrians on two arms green man crossing and cyclists on all three arms ASLs. Nothing else.

    No re-configuration for cyclists, no advance release lights. For a mayor committed to clean air and active travel it is pathetic. Real un-reconstructed token-gesture TfL traffic engineering.

    Please sign in to vote.
  • Blackheath Hill - Proposed new pedestrian crossing at Blackheath Hill’s junction

    Created by Simon Still // 1 thread

    These are the improvements we are proposing:

    Installing a new staggered pedestrian crossing on Blackheath Hill, at its junction with Greenwich South Street, Lewisham Road and Blackheath Road. The crossing, which will feature a countdown timer and rotating cones (vibrating aids to assist visually impaired and blind people cross the road), will allow pedestrians to cross Blackheath Hill in two stages, linking the footway near the George & Dragon public house with the triangular traffic island leading to Greenwich South Street, as shown in the drawing below. The crossing will include upgraded paving to help visually impaired and blind people, improving conditions for vulnerable users. People will have between 6 to 23 seconds to cross the road (depending on which half of the staggered crossing they are using), followed by an additional eight seconds from when the green man disappears until the traffic is given a green light. There will also be Pedestrian Countdown to tell people how long they have to start to cross.
    Raising the carriageway floor to slow turning motor traffic on the left turn slip from Greenwich Street to Blackheath Hill, making crossing easier for pedestrians. As currently, there would be an informal crossing between this traffic island and the footway outside Geepharm Chemists.
    Making the loading bays in the area representative of their actual usage which has been carefully monitored by us, by:
    Extending the loading bay on Blackheath Road towards Deptford, in front of Wickes, from 15m to 28 meters. This loading bay will be all inset, taking no road space and therefore, not impacting traffic.
    Removing three loading bays from Blackheath Road, in front of Wickes, towards Greenwich, to improve traffic capacity on the stretch between Egerton Drive and the junction. The change will free up both lanes for traffic at all times, including during the waiting time for the lights ahead. This will improve the traffic flow and bus journey time reliability as well reducing the conflict between two wheeled vehicles and parked vehicles. The new extended bay bears the same current enforcement controls: loading for twenty minutes or 3 hours for disabled parking.
    Relocating bus stop N, Egerton Drive, to prior to the pedestrian crossing on Blackheath Road towards Deptford, around 150m away from the junction - near Wickes - to improve traffic flow towards Deptford. This bus stop will be partially inset, improving traffic flow towards Deptford as buses will not use the road when picking up passengers.

    Please sign in to vote.
  • closing Mina Road access to Old Kent Road

    Created by SallyEva // 2 threads

    Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.

    Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.

    Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.

    Please sign in to vote.
  • Changes to A107 Clapton Common Road Safety Improvements

    Created by Simon Munk // 1 thread

    Part of the Wetlands 2 Wetlands route.

    TfL says:
    We are proposing improvements to the pedestrian and cycling facilities with A107 Clapton Common junctions with Craven Walk and Portland Avenue.

    A107 Clapton Common
    We would like to improve the way cyclists and pedestrians cross. We are proposing to relocate the pedestrian crossing south of Portland Avenue and install a new parallel pedestrian and cycle crossing at the junction Clapton Common junctions with Craven Walk and Portland Avenue. This new crossing for pedestrians and cyclists would make crossing easier for all users.

    Craven Walk would become one-way only (northbound) between the A107 Clapton Common Road and Belz Terrace, except for cycles.

    We also propose to remove a section of the bus lane at bus stop (CU) south of Portland Avenue on the A107 and convert this into a wider pedestrian footway to create better visibility.

    Improved Vehicular Access

    We propose to improve vehicular access on Castlewood Road, Ravensdale Road and Lingwood Road. To achieve this we would need to remove a small section of parking on either side of the carriageway. We would implement single yellow line parking restrictions, to create better visibility and accommodate turning movements.

    We also propose to implement the parking restriction times from 8.30am to 6.30pm Monday to Saturday.

    Traffic impacts

    We predict no significant impact on general traffic times.

    Cars previously turning out of Craven Walk onto A107 Clapton Common may have a slightly longer journey, although by no more than a few minutes. Bus journeys would not be impacted.

    Please sign in to vote.