  • Busway path closed today (13nov) south of station

    Created by arg // 1 thread

    The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.

    I

    Please sign in to vote.
  • New barrier on Addenbrookes busway bridge

    Created by Finlay KM // 1 thread

    A new set of barriers has appeared on the hospital side of the usway bridge at Addenbrookes.
    Creates the usual set of problems for cargo bikes and less confident bike users, with the added bonus of being on a steep hill that ices up regularly, and right next to a busway with a record of squishing people who fall onto it.

    Please sign in to vote.
  • Trumpington busway - campaign for improvements

    Created by Heather Coleman // 1 thread

    As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway.  The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.

    The group would like to start getting this out to users of the path for input, discussion and help with campaigning.  Many Biomedical Campus commuters presumably use this path frequently, even daily.  It would be great to get some input.

    Please sign in to vote.
  • Cambridge South West Travel Hub

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    GCP project:

    Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.

    Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.

    By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.

    A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.

    The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.

    Please sign in to vote.
  • loose surface on busway path

    Richard G // 1 thread

    There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R

    Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.

    I cant see anywhere, who to contact about removing all the loose material.

    Anyone know a good point of contact to report to?

    thanks, Richard

    Please sign in to vote.
  • 21-month closure of cycle path from Cambridge North to Milton Road

    Anon // 1 thread

    At the end of this blog post, it's reported that the segregated cycle path from Cambridge North station to the north of the Business Park will be closed to cyclists from March 2019 to December 2020 (a period of 21 months), for utility works relating to development on the Cambridge North site. Cyclists are to be diverted to the south side path (along the busway); pedestrian access on the north side will apparently be maintained.

    In particular, this appears to prevent cyclist use of the recently opened gate at the south end of the Business Park for the duration of the works (unless perhaps one pushes one's cycle). Getting from or through Cambridge North to the Science Park will be less convenient, too.

    Full text from Camcycle blog post. (Robin Heydon tells me this information originally came from Brookgate.)

    Development at Cambridge North

    Early works have begun on the further development around Cambridge North, where new offices and a hotel will be built. Within the next couple of months, a major cyclist diversion will be put in place which reroutes cyclists accessing the station via the segregated path along Cowley Road. This will be closed to allow utility works from Milton Road down to the station. Cyclists will be redirected along the Busway cycleway from Milton Road. There will continue to be road access for cyclists to the industrial and residential units off Cowley Road (including the Camcycle office), but not beyond this point. Note that there will be a signifidant increase in construction traffic along Cowley Road.

    Please sign in to vote.
  • Hobson Av / Busway

    Created by Daniel Dignam // 1 thread

    I complained to the council about the recent introduction of lights on the busway at Hobson Av. They're red for cyclists/pedestrians and don't appear to be triggered by bikes. There are 2 buses per hour that use Hobson Av so it seems entirely perverse for the priority to be as it is.

    In the reply justifying the priority for motor traffic it was stated that cars will soon start using this road to access a car park. Has anybody got knowledge about this, as I understood the planning consent access was going to be restricted to buses and emergency vehicles.

    I do think it's an accident waiting to happen, cyclists are going to get used to there being no traffic, and will cross on red (as they're allowed to if it's safe). If it was green all the time then it would be more obvious when they did change.

    Please sign in to vote.
  • cycle thefts from busway stops

    Created by Heather Coleman // 2 threads

    I subscribe to the Histon/Impington/Milton/Longstanton e-cops mailing list. We are now getting daily updates of crimes in the sector.

    I'm noticing a lot of thefts of cycles parked at the various busway stops. Actually the busway stops are frankly useless unless you do park a bike there. The one at Swavesey is a good half a mile from the nearest end of the village. The one at Longstanton is similar. Most of Histon is a fair old hike on foot from Histon station. I suspect many who use the busway from further afield keep a bike at the Science Park or Orchard Park to avoid the traffic queues or to actually get to where they want to go without having to go all the way into the city and back out again.

    Does anyone else have any anecdotal data on a) numbers of people who cycle at one or both ends of their busway journey and b) cycle theft statistics?

    I'm seeing reports several times a week. At this rate, it makes using a bicycle to get to and from the busway unsustainable.

    Please sign in to vote.
  • Hardings Way and Connections

    Created by MJR // 4 threads

    Hardings Way is incomplete and frequently under threat. What exists is a fairly good and very popular route from Wisbech Road to Boal Quay, but the route south of Wisbech Road is still not open (2014). Most of the connections are also incomplete: when buses were allowed onto Hardings Way, we were supposed to get improved connecting routes including through the town centre (never happened) and past the Southgates (dangerously botched). Instead, the northern part is under threat of being opened to taxis and minicabs (July 2014 draft Air Quality Action Plan) and there are frequent rumours of it being opened to all traffic, contrary to local and national policies.

    Please sign in to vote.
  • HGV and LGV traffic on Nuffield Road

    Created by Klaas Brümann // 1 thread

    Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.

    Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.

    Petition: http://iitm.be/ChestertonTrafficReduction
    Picture Gallery: http://iitm.be/NuffieldRoad

    Please sign in to vote.
  • Busway cycleway flooded

    Martin Lucas-Smith // 2 threads

    The busway cycleway is sometimes flooded in this section.

    The County Council need to address this.

    Please sign in to vote.
  • Evil posts on busway cycleway

    Created by David Earl // 4 threads

    There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences

    Please sign in to vote.