Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
limited to the area of Cyclenation:
9 issues found for 'redevelopment':
Created by Nick Flynn // 1 thread
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
sound+fury // 1 thread
The City Council are consulting on how to regenerate East Barnwell.
Created by Simon FitzMaurice // 1 thread
16/1555/FUL
Redevelopment of site to form 6 self contained 1 bedroom flats following demolition of existing HMO dwelling house.
43 Elizabeth Way Cambridge Cambridgeshire CB4 1DB
Created by Roxanne (Cycling Campaign Officer) // 1 thread
16/1389/FUL | Demolition of the existing office building and removal of the 145 associated car parking spaces (use class B1a) and construction of College accommodation (comprising 243 en-suite rooms and 24 studios), landscaping and access arrangements (use class sui generis) | Mount Pleasant House Mount Pleasant Cambridge Cambridgeshire CB3 0RN
SUMMARY
Student and Staff Accommodation for St Edmunds College on Castle Street/Huntingdon Road.
243 ensuite bedrooms for the Colleges and 34 studio apartments
demolition of the existing Mount Pleasant House o ce building and the removal of the 145 associated car parking spaces
Total bed spaces of 277
Cycle parking spaces 278 (double stack & Sheffield). Plus 28 visitor spaces.
Created by Jim Chisholm // 3 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by Matthew Phillips // 1 thread
The Durham City Integrated Transport Approach document, part of the proposed new County Durham Plan, states that it is the Council's intention to relocate the bus station in Durham and to remove the A690 roundabout by the railway station, converting it to an ordinary junction with lights.
The document can be viewed at http://durhamccconsult.
limehouse.co.uk/file/2679025 and the relevant sections are 3.49 onwards. The document mentions improving the area for pedestrians but neglects to consider the potential for cycling infrastructure improvements in the area.
The DBUG response to the County Plan (available at http://community.dur.ac.uk/m.e.phillips/cycling/DBUGResponse.pdf ) devotes a section to this matter (see pages 21 to 23).
Opportunities for better cycling infrastructure include:
* restricting vehicle access to North Road and allowing two-way cycling
* linking the station to neighbouring cycle lanes
* better connection to Framwellgate Peth and the north of the city
* remodelling the Milburngate roundabout also
* removing through traffic from the portion of North Road beyond the viaduct
We need to lobby not just for immediate cycling needs to be taken into account in the design for the new road layout, but also for future possibilities by bringing forward design of strategic cycle routes through the city, otherwise we risk losing a very rare opportunity to transform provision at a key city-centre junction.
According to the document, construction will commence in the 2014/15 financial year, with a timescale of 18 months. This means the plans must already be fairly fully developed.
Created by MJR // 0 threads
There's a plan to redesign this street which has quite a bit of covered cycle parking at the moment, but no cycle parking is shown on the proposed layout.
An analysis appears at http://blog.jofftastic.co.uk/2013/12/peterborough-city-council-anti-cycling/
Comments on/to http://www.peterborough.gov.uk/community_information/consultation_and_engagement/current_consultations/long_causeway_scheme.aspx by 20 December
Created by David Wilcox // 0 threads
The Old Market Community Association have published their vision of a redeveloped Old Market and West Street.
http://www.oldmarketquarterfuture.org
The Bus Stop Island would be removed and the pavement widened. No mention of any cycling facilities, be they lanes or even parking is mentioned in their plan, other than to route cyclists away from this logical thoroughfare.
The plan is here http://www.oldmarketquarterfuture.org/wp/wp-content/uploads/2013/05/Old-Market-Quarter-draft-neighbourhood-plan.pdf
They are having a meetings later in October 2013.
17th October 2013 – NPN Quarterly meeting
23rd October 2013 – proposed OMQ Neighbourhood Plan Briefing event.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
One thread found for 'redevelopment':
Trust Pathways
A discussion on issue
Durham bus station redevelopment
MWright
posted
No library items found for 'redevelopment'.
No planning applications found for 'redevelopment'.