Things tagged 'road-markings'

limited to the area of Cyclenation:

10 issues found for 'road-markings':

  • Road marking at junction create risk

    Created by User 2125 (deleted) // 0 threads

    Markings on road leave cyclists turning right into Centenary Way in a position which oncoming right turning traffic will also occupy. Needs more clarity.
    Busy and complex nature of junction means traffic often pulls out aggressively.

    Please sign in to vote.
  • Poor junction layout, West Lynn

    Created by Rob Archer // 1 thread

    The junction where Wisbech Road joins Clenchwarton Road by East Coast Storage is unsafe. The cycleway continues directly across the junction but is not clearly marked. The red tarmac has been warn away and give way markings painted across the cycleway where it crosses the entrance to East Coast Storage. There are also give way markings across the exit to ECS making it very difficult to ascertain who has priority.

    Please sign in to vote.
  • Poor lane marking eastbound at Park and Ride on Madingley Road

    Created by Ben Brierton // 1 thread

    The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.

    The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.

    There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.

    Please sign in to vote.
  • Removal of cycle facility

    Created by fishter // 2 threads

    At the bottom of the hill there is a "chicane" for motor vehicles to negotiate. Northbound traffic must give priority to southbound traffic.

    The chicane is formed by an island on the northbound side of the road. This island has a bypass to the left to allow cyclists to proceed despite oncoming traffic.

    After a recent resurfacing of the road the markings for the cycle lane were omitted (see picture). This means that cyclists should now give priority to southbound traffic as the markings indicate they should not use the bypass.

    Please sign in to vote.
  • Traffic Signs Regulations and General Directions 2015

    Created by Hester Wells // 1 thread

    Consultation on road markings and traffic signs at https://www.gov.uk/government/consultations/traffic-signs-regulations-and-general-directions-2015

    There are a number of things which I believe affect cyclists, see http://www.bikebiz.com/news/read/dft-to-allow-better-signage-for-cyclists-including-removing-asl-lanes/016336
    This is really a national issue, but didn't want to spam all users.

    Please sign in to vote.
  • Worn out road markings, Dragon Lane

    Created by Matthew Phillips // 0 threads

    Where the on-pavement cycle lane comes to an end, the road markings which continue the NCN 14 and 70 on-road are worn out and patchy. The design of the lane to take you southbound onto the pavement is poor, because the adjacent parking means that the traffic is usually driving straight over the top of the dedicated cycle lane in the middle of the road.

    Please sign in to vote.
  • Coronation Road Cycle Path

    Created by Keeno // 1 thread

    Someone wrote and complained in The Pigeon magazine, saying "why do cyclists not use the cyclepath on Coronation road and hold up traffic?"

    Good question. Because some people don't know it's there and the road is a smoother surface.
    It needs clear delineation, a smooth surface, and if the railings aren't to be moved, large "SHARED SPACES" marked around the tree bottlenecks (chevrons on pavement) so people know what's what.

    You wouldn't really know to look at it, that it's a cyclepath, with loats of signs stickered over.

    Ideally the Railing will be moved back to make it wider and so the large trees aren't a problem, but if money's tight, smooth surface and clear markings on the floor will do.

    Please sign in to vote.

One library item found for 'road-markings':

No planning applications found for 'road-markings'.

Back to top