Things tagged 'timing'

limited to the area of Cyclenation:

3 issues found for 'timing':

  • Toucan Crossing Timings Incorrect

    Created by acsimpson // 1 thread

    This crossing takes far to long to change. There is rarely a time when it couldn't change imediately without causing extra delays to traffic, however it often takes far to long and being a two stage crossing can add a significant delay to any active travel.

    Please sign in to vote.
  • Cycle crossing signal timings

    Created by Matthew // 1 thread

    Issue derived from June 2017 monthly meeting: this issue tracks information related to the timing of traffic signals that control cycle crossings (e.g. Maids Causeway / Fair St, East Road / Norfolk St, Queens Rd / Burrell's Walk, Gonville Place / Gresham Rd, all along Guided Busway, appearing on various countryside routes, etc).

    We would like to gather the following information:

    a) how are the signals programmed currently (and when they change, what have they been changed to?)
    b) who is responsible for the programming of the cycle as well as the placement of cycle detectors (if any)?
    c) when needed, what levers can be pushed to get signals changed to give more priority to people walking and cycling?

    Please sign in to vote.
  • Richmond Circus Kew Road south toucan crossing

    Created by Paul James // 0 threads

    The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.

    Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.

    Please sign in to vote.

One thread found for 'timing':

No library items found for 'timing'.

No planning applications found for 'timing'.

Back to top