Tower Bridge road surface problem

Please sign in to vote.

Added by londoncycler

Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.

Location

Issues nearby
Back to top