21/00537/FUL: 5no. dwellings, 29 High Street Chesterton
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00284/FUL | Erection of a detached building containing 1no. 2-bed and 1no. 1-bed duplex apartments, with associated car parking and landscaping | 1 Maitland Avenue Cambridge CB4 1TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00442/FUL | Two storey side and single storey front and rear extensions to create one, two bed flat and one, one bed flat | 5 Davy Road Cambridge CB1 3QW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00358/FUL | Refurbishment and extensions to the existing building to provide 2 no. commercial units (Use Class E) at ground floor with 6 no. flats to the rear and on the upper floors along with cycle parking, landscaping and associated infrastructure | 78-80 Cherry Hinton Road Cambridge CB1 7BH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00526/FUL | Retrospective for the existing rear L-shape extension and change of use of dwelling from small HMO C4 to large scale 8 no. person HMO (Sui Generis), including use of the existing rear L-shape extension. | 2 Galfrid Road Cambridge CB5 8ND
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00220/FUL | Construction of 1no. Detached 1 1/2 storey dwelling to the rear of no. 579 Newmarket Road | 579 Newmarket Road Cambridge CB5 8PA
Created by Steven Moseley // 1 thread
Demolition of dilapidated GP surgery building and replacing it with state of the art new medical centre with staff accommodation on first floor, parking, cycle and waste storage and ancillaries.
Created by Steven Moseley // 1 thread
Full planning application for a two-storey temporary school building (640m2) and single-storey admin block (66m2) for Trinity School at Gilberd School as part of Alpha Trust including minor alterations to landscaping + hard standing.
Created by Steven Moseley // 1 thread
The ABRO site (now called the DSG) forms part of the Defence Estate and was used as a military vehicle repair facility. The site was vacated in about 2019 and has not been used since that time. The Defence Estates have decided to dispose of the site as it is no longer required for military purposes.
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
"When Colchester council approved the plan, in about 2007, it insisted that all private motor traffic enter and leave the estate via an access on to the A134 (Cordelia Drive), near to the A12 but at the farthest point from the town centre. ...
A year ago, the developers, Mersea Homes and Countryside, decided they didn't like this arrangement and applied to scrap the bus gate. They hedged their bets and also asked to move the bus gate into their estate, giving 160 homes access to Mile End Road.
Colchester council rejected the scrapping of the bus gate but granted a temporary access for five years to be covered by a legal agreement.
The developers decided to go to appeal." (blog)
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
sound+fury // 1 thread
Created by Stuart Thomas // 1 thread
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
Created by Diane // 1 thread
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
Created by nix // 1 thread
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
sound+fury // 1 thread
New 2 bedroom house being built close to an existing property.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
this old fashioned barrier on a major cycleway needs a rethink
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Andy Allan // 1 thread
There's a nice cycle route along Mount Nod Road into Hillside Road that's interrupted by a short section of path marked "No Cycling". Adding a cycle path would remove an (unsigned) detour via Faygate Road.
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.