21/02836/FUL Single storey extension to 1 bed flat with cycle shelter.
The cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
The cycle parking.
Reserved Matters approval for appearance, landscaping, layout and scale for 373 dwellings, access roads, cycle and pedestrian routes, cycle and car parking, landscaping, utilities and associated ancillary structures at Lots S1 and S2, North West Cambridge Development following outline planning permission S/1886/11 as varied by planning permission S/2036/13/VC
Lots S1 And S2, North West Cambridge Development Eddington Avenue Cambridge CB3 0LH
South Cambridgeshire
Application reference : 21/04036/REM
Erection of 280 dwellings, including 72 affordable dwellings, two new vehicular accesses from Babraham Road, pedestrian and cycle access, publicly accessible open space, a Local Area of Play (LAP) and a Local Equipped Area of Play (LEAP), landscaping and earthworks and surface water drainage, associated amenity space and attenuation features and internal infrastructure.
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
South Cambridgeshire
Application reference : 21/03955/FUL
Created by Steven Moseley // 1 thread
Proposed commercial office block (resubmission of application 211722
Created by Steven Moseley // 1 thread
Demolition of existing detached house and erection of 2 No. detached dwellings.
Created by Steven Moseley // 1 thread
Proposed two bedroom bungalow and vehicle access to rear of 168 St Andrews Avenue
Created by Steven Moseley // 1 thread
202349 Application to determine if prior approval is needed for proposed New dwelling dwellinghouses on detached block of flats.
202161 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
202321 Application to determine if prior approval is required for two new additional floors of residential floor space to create 8no. 2 bedroom flats.
202001 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
Created by Steven Moseley // 1 thread
Residential use of former car park to international house following change of use from B1a (offices) to C3 (dwellings) of international house (resubmission of planning permission 170259)
Created by Steven Moseley // 1 thread
Change of use of existing dwellinghouse to 6 flats and erection of replacement building at rear to provide 4 flats. Resubmission and variation of planning approved under reference 180116
Created by Steven Moseley // 1 thread
Converting a vacant office unit into a Job Centre Plus office for the DWP. This facility will provide 29 work coach stations to attend customers by appointment only. It will have an interview room for customers and staff welfare areas. Ten of the existi
Created by Steven Moseley // 1 thread
Erection of 2No. semi-detached 2 bedroom houses.
Sam // 1 thread
Before the pandemic you could turn right here, now, any cyclist ends up on car-repelling paint with nowhere obvious to go.
sound+fury // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping
Hills Road Sixth Form College Hills Road Cambridge CB2 8PE
Cambridge
Application reference : 21/03780/FUL
Created by Steven Moseley // 1 thread
Proposed re-development to the rear of Willows Shopping parade, to deliver a new residential development of 6No dwellings consisting of 3No three bedroom dwellings and 3No four bedroom dwellings.
Created by Steven Moseley // 1 thread
Proposed extensions and alterations to existing hotel to accommodate an additional 20 rooms/suites, additional meeting rooms and improved leisure facilities. Proposed external refurbishments and internal alterations.
Created by Steven Moseley // 1 thread
House conversion to 2 x 2 bed flats, and 1 x 2 bed maisonette. Single storey extension to ground floor flat and balcony to the first floor flat. Along with the current approved 150493 and 150492 parking arrangements 3 additional parking spaces are provid
Created by Steven Moseley // 1 thread
Change of Use of the first floor from ancillary office of a light industrial unit to Residential to provide 1 no. 3 bedroom apartment
Created by Colin Wing // 1 thread
Westminster City Council and the London Borough of Camden are working together to deliver a Neighbourhood Traffic Management (NTM) scheme in Covent Garden including the Seven Dials area.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Steven Moseley // 1 thread
Retail park comprising retail (A1) and restaurant (A1/A3/A5) units with associated parking and landscaping. Resubmission of 172935 - REVISIONS RECEIVED
Created by Will Bramhill // 1 thread
Plan 211788
Industrial estate, London Road, Marks Tey
(was 202373)
Introduction
Colchester Cycling Campaign objects to this plan. If it is considered for approval, mitigation should be carried out and completed at the same time as the development. If any work is outstanding it should be subject to a legal agreement and funded via a 20-year Section 106 or CIL agreement. See table below for a list of mitigation measures.
Highways England should consider this scheme not as a standalone but as a major part of other recent planning applications in this area, which all add to motor traffic. This particular application is disappointing in terms of provision for active travel: it is likely to increase dependence on short to medium-distance commuting by car while further undermining cycling through increased traffic and greater danger, especially in Old London Road.
Note that paragraph 109 of the National Planning Policy Framework states that “development should only be prevented or refused ... if there would be an unacceptable impact on highway safety, or residual cumulative impacts on the road network would be severe”.
We trust that the Highways England stage one road safety audit (CBC site August 6) will include consideration of walking and cycling routes in the area. The auditor should ride the routes, as recommended by LTN 1/20 and Gear Change.
Two major plans have recently been rejected owing to poor cycling and walking provision: the Devonshire Quarter in Cambridge and Lidl in Salford (download of decision notice).
Although the applicant’s draft travel plan and transport assessment has sections on walking and cycling, nothing is provided in terms of improved off-site infrastructure – at least not until 2028, by which time the new section of the A12 may be complete. It is unclear whether the developer would be prepared to fully fund improvements at that stage.
2 Current situation
The Kelvedon to Colchester cycleway runs past the development site along Old London Road. This is used by longer-distance cycle traffic as well as cycle commuters to and from nearby industry and adjacent homes. Current use is low, in part because of poor connections.
This route links to the part of Marks Tey west of the A120 via Dobbies Lane via a relatively new cycleable bridge across the railway track. However cycle accesses to homes north of Jays Lane/Long Green/Wilsons Lane to Keable Road, Cornwallis Drive and Steele Close are convoluted, narrow and restricted.
3 The applicants’ transport assessment and travel plan
The applicants’ transport assessment and travel plan is lazy in terms of cycling. It appears to be a desk-based study and states merely that cycling is possible from certain hamlets and villages. No consideration is given to current barriers such as the A12 or the perceived safety of the roads and lanes that have to be used to reach the site, both of which would make a cycle journey dangerous or undesirable. There is no indication that the company involved has ridden any of these routes to assess their suitability.
No consideration is given to “on the ground” ease of access, even within Marks Tey.
The consultant quotes objectives of a travel plan but this scheme ignores objective two (address the access needs of staff by supporting walking, cycling and the use of public transport) and objective 3 (encourage good urban design principles that open up the site to walking, cycling and use of public transport). If this is the case at this stage, what commitment will be invested in the future?
The papers state that cycle access is possible via the grounds of Marks Tey Parish Hall. This appears to be privately owned land (possibly by the parish council). The paths within the site are not wide enough for cycling even if it was permitted. The access to the site from the A120 (picture below) would be a challenge for Bethany Shriever, Team GB’s BMX Olympic gold medallist.
The applicant gives a concession to cycling with a “green line on a map” in its transport assessment. There is no indication of land ownership, when or whether this can be achieved. Notably this access is not marked on any of the detailed plans for the site itself.
In conjunction with Highways England, the developer has looked at improvements to the junction of Old London Road with the A120. All of these except for a ban on right hand turns on the A120 have been put in abeyance pending construction of the new A12.
The applicant also talks of a 5km cycle catchment. This is out of date. Experience from cycle-friendly towns and cities shows that the advent of ebikes increases not just distances cycled but frequency too.
No estimate is given of the effect of increased motor traffic on cyclists in Old London Road, with the focus being on the ability of two heavy goods vehicles to pass each other.
While Old London Road falls within the remit of Highway England, it is not by nature a trunk road but a lightly trafficked mixed-use street. It should be subject to the designs set out in Manual for Streets (MfS) and not the Design Manual for Roads and Bridges. Page 144 of MfS states: "The DMRB is not an appropriate design standard for most streets, particularly those in lightly-trafficked residential and mixed-use areas.”
The applicant’s documents also make no mention of Local Transport Note 1/20 on cycling infrastructure or the government’s Gear Change document, which have been published for more than a year. These should have been used to shape the application.
Paragraph 3.4.5 of the transport assessment mentions the National Cycle Network routes 1 and 13. These are irrelevant when the site is so cut off for cyclists and is likely to be so for some time.
There is no indication of the type of cycle parking that the developer intends to provide, whether security is sufficient and whether it is covered. The applicant seems to have ignored the requirement at 3.6.2 of the Essex Parking Guide that “cycle parking should be conveniently located adjacent to entrances to buildings”.
No comprehensive consideration of current or future air quality has been made.
4 What we would like to see
Request |
Comments |
1 Funding and provision of a S segregated cycleway from Marks Tey station to join with Old London Road 90m west of the A120 junction |
Station Road may need widening. Possible land ownership issues, although the wooded area south of the station,and between Old London Road and the A12 south of the A120 (the teardrop), may belong to Highways England. The cycleway should cross the teardrop to join Old London Road 90m south of the A120 junction. Street lighting needed |
2 Existing crossing moved 30 metres east, closer to junction with roundabout |
This will allow use of existing verges to give better access, ie, no use of footway by cycles |
3 Remodelling of plans for phase 1 and phase 2 so that a segregated cycleway/footway is provided along the northern edge of the site between Dobbies Lane and the A120, crossing Old London Road to meet with the cycleway from the station. The first section of the path should have full access into the site with its design influenced by Manual for Streets |
See illustration. Land ownership issues, although parish council may be amenable? Street lighting needed. If this cannot be achieved then Old London Road will have to be looked at as the main access route. The level of traffic proposed on Old London Road would mean that a segregated cycleway would have to be provided. |
4 An alternative to 3: redesign of Old London Road to be friendlier to cyclists using Manual for Streets. |
As noted at 3 |
5 Funding for improvements for cycle/foot access into the Keable Road estate at Keable Road, Cornwallis Drive and Steele Close |
Relatively easy. These accesses should meet LTN 1/20 |
6 Developer to work with Highways England on tying in development to old A12 once the new road opens, subject |
Dependent on detailed drawings from Highways England |
7 Agreement to help fund medium to long-term maintenance of Dobbies Lane |
|
8 Details of cycle parking (type and position) to be approved by CBC before construction begins |
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Prowse Place and Wilmot Place in June 2020.
The Prowse Place closure was originally by means of bollards but has been replaced by ANPR and signage while the Wilmot Place closure is by means of bollards.
Camden also proposes to:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Barton and District Bridleways group are campaigning to get a popular route for cycling, walking and horseriding recognised as an official Right Of Way.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for proposed change of use of offices (Class B1) to 3 residential apartments (ClassC3)
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
NCN45 across Peckforton Hill at risk of being closed
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
Created by mikewg // 1 thread
Numerous people responding to the survey experience safety issues with this location. Some comments here:
Town centre around the monument, the cobbles are a night mare and shake you badly, I have had my bike lights shaken off before, and had to save them from being run over. You cannot cycle quickly over the cobbles.
Taunton Town Centre - cobbles & volume of traffic
I go through the centre of town. I have had a couple of accidents on the cobbled surface outside the market house over the years of cycling this route. Both resulted in injuries including concussion, facial injuries requiring stitching, a shoulder and hip injury which required physio and steroid injections to resolve. The second of these happened on a wet day, when I was forced to brake because a bus driver, having seen me coming, decided to pull out in front of me. He was relatively remorseful, but it was an accident that would not have happened if 1, he hadn't taken the decision that a cyclist didn't matter, and 2, the road surface was smoother as the braking action unsteadied me on a rough surface - the fall was inevitable as soon as I touched the brakes really. As a consequence, I now cycle along the back of the market house as I cannot bring myself to cycle across the cobbled road surface.
Cobblestones around parade
High Street; ridiculous cobbled roundabout making town centre very dangerous
Cobbles in front of Market Hall
Cobble stones on roundabout in centre of town feels unsafe and dangerous for cyclists.
COBBLES on the main parade
cobbles in town centre
'cobbles ' Market house - dangerous surface - traffic in a hurry .
Cobbles at Market House roundabout,
Cobbles around Burma Memorial make it impossible to take hand off handlebars to signal and are treacherous at best of times
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Simon Munk // 1 thread
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations."
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by Chris Neston // 1 thread
The NCN 5 route over Frodsham Marshes is very badly surfaced such that can only be used by proficient cyclists with MTBs. As a result most people use the unpleasant main road alternative on the A56.
An opportunity exists to get funding to surface this as a result of community funding from the Marshes Windfarm development. Closing date Feb 28.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by ken thomas // 2 threads
Installation of 17.5m single stack pole base station and associated works
Telcommunications Site Off Caldy Valley Road Great Boughton Chester Cheshire CH3 5PR
Application reference : 17/00266/TEL
No drawings or details are shown on the planning website.
A recent drawing seen for the project shows the cabinets blocking half the available width of the cycle/footpath. Such siting is not acceptable on a recently developed cycleway designed to specific standards.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Leigh P // 1 thread
Tovells Road and Caudwell Avenue are a huge rat run in the morning for a limited period of time for parents going to St Mary's Catholic School. I understand the school catchment is not local. Cars turinging into these roads too fast and quite clearly without looking whist rusing to get children to school on time. Often have to swerve on bike to avoid.
Tovellls Road is the only way cars can get from the south and east of the town to St Mary's primary school...well it's not actually, but it's the route most of them take....They should be using Woodbridge Road and Caudwell Hall Road that are maintained for such traffic. Tovells Road is single file traffic only (due to parked cars), but the reason they all get away with it is they are all going in the same direction at the same time! They seem to have a system of most going to the school along Tovells Road, and returning along Holland Road.
I assume St Mary's shool has a travel plan and this includes regular liaison with parents to use safer and appropriate routes, in an appropriate manner.
Created by Sarah Wood // 0 threads
There is no secure cycle parking outside the shops at Chapel Road and Fernhill Road
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity