21/02836/FUL Single storey extension to 1 bed flat with cycle shelter.
The cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
The cycle parking.
Reserved Matters approval for appearance, landscaping, layout and scale for 373 dwellings, access roads, cycle and pedestrian routes, cycle and car parking, landscaping, utilities and associated ancillary structures at Lots S1 and S2, North West Cambridge Development following outline planning permission S/1886/11 as varied by planning permission S/2036/13/VC
Lots S1 And S2, North West Cambridge Development Eddington Avenue Cambridge CB3 0LH
South Cambridgeshire
Application reference : 21/04036/REM
Erection of 280 dwellings, including 72 affordable dwellings, two new vehicular accesses from Babraham Road, pedestrian and cycle access, publicly accessible open space, a Local Area of Play (LAP) and a Local Equipped Area of Play (LEAP), landscaping and earthworks and surface water drainage, associated amenity space and attenuation features and internal infrastructure.
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
South Cambridgeshire
Application reference : 21/03955/FUL
Created by Steven Moseley // 1 thread
Proposed commercial office block (resubmission of application 211722
Created by Steven Moseley // 1 thread
Demolition of existing detached house and erection of 2 No. detached dwellings.
Created by Steven Moseley // 1 thread
Proposed two bedroom bungalow and vehicle access to rear of 168 St Andrews Avenue
Created by Steven Moseley // 1 thread
202349 Application to determine if prior approval is needed for proposed New dwelling dwellinghouses on detached block of flats.
202161 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
202321 Application to determine if prior approval is required for two new additional floors of residential floor space to create 8no. 2 bedroom flats.
202001 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
Created by Steven Moseley // 1 thread
Residential use of former car park to international house following change of use from B1a (offices) to C3 (dwellings) of international house (resubmission of planning permission 170259)
Created by Steven Moseley // 1 thread
Change of use of existing dwellinghouse to 6 flats and erection of replacement building at rear to provide 4 flats. Resubmission and variation of planning approved under reference 180116
Created by Steven Moseley // 1 thread
Converting a vacant office unit into a Job Centre Plus office for the DWP. This facility will provide 29 work coach stations to attend customers by appointment only. It will have an interview room for customers and staff welfare areas. Ten of the existi
Created by Steven Moseley // 1 thread
Erection of 2No. semi-detached 2 bedroom houses.
Sam // 1 thread
Before the pandemic you could turn right here, now, any cyclist ends up on car-repelling paint with nowhere obvious to go.
sound+fury // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping
Hills Road Sixth Form College Hills Road Cambridge CB2 8PE
Cambridge
Application reference : 21/03780/FUL
Created by Steven Moseley // 1 thread
Proposed re-development to the rear of Willows Shopping parade, to deliver a new residential development of 6No dwellings consisting of 3No three bedroom dwellings and 3No four bedroom dwellings.
Created by Steven Moseley // 1 thread
Proposed extensions and alterations to existing hotel to accommodate an additional 20 rooms/suites, additional meeting rooms and improved leisure facilities. Proposed external refurbishments and internal alterations.
Created by Steven Moseley // 1 thread
House conversion to 2 x 2 bed flats, and 1 x 2 bed maisonette. Single storey extension to ground floor flat and balcony to the first floor flat. Along with the current approved 150493 and 150492 parking arrangements 3 additional parking spaces are provid
Created by Steven Moseley // 1 thread
Change of Use of the first floor from ancillary office of a light industrial unit to Residential to provide 1 no. 3 bedroom apartment
Created by Colin Wing // 1 thread
Westminster City Council and the London Borough of Camden are working together to deliver a Neighbourhood Traffic Management (NTM) scheme in Covent Garden including the Seven Dials area.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Steven Moseley // 1 thread
Retail park comprising retail (A1) and restaurant (A1/A3/A5) units with associated parking and landscaping. Resubmission of 172935 - REVISIONS RECEIVED
Created by Will Bramhill // 1 thread
Plan 211788
Industrial estate, London Road, Marks Tey
(was 202373)
Introduction
Colchester Cycling Campaign objects to this plan. If it is considered for approval, mitigation should be carried out and completed at the same time as the development. If any work is outstanding it should be subject to a legal agreement and funded via a 20-year Section 106 or CIL agreement. See table below for a list of mitigation measures.
Highways England should consider this scheme not as a standalone but as a major part of other recent planning applications in this area, which all add to motor traffic. This particular application is disappointing in terms of provision for active travel: it is likely to increase dependence on short to medium-distance commuting by car while further undermining cycling through increased traffic and greater danger, especially in Old London Road.
Note that paragraph 109 of the National Planning Policy Framework states that “development should only be prevented or refused ... if there would be an unacceptable impact on highway safety, or residual cumulative impacts on the road network would be severe”.
We trust that the Highways England stage one road safety audit (CBC site August 6) will include consideration of walking and cycling routes in the area. The auditor should ride the routes, as recommended by LTN 1/20 and Gear Change.
Two major plans have recently been rejected owing to poor cycling and walking provision: the Devonshire Quarter in Cambridge and Lidl in Salford (download of decision notice).
Although the applicant’s draft travel plan and transport assessment has sections on walking and cycling, nothing is provided in terms of improved off-site infrastructure – at least not until 2028, by which time the new section of the A12 may be complete. It is unclear whether the developer would be prepared to fully fund improvements at that stage.
2 Current situation
The Kelvedon to Colchester cycleway runs past the development site along Old London Road. This is used by longer-distance cycle traffic as well as cycle commuters to and from nearby industry and adjacent homes. Current use is low, in part because of poor connections.
This route links to the part of Marks Tey west of the A120 via Dobbies Lane via a relatively new cycleable bridge across the railway track. However cycle accesses to homes north of Jays Lane/Long Green/Wilsons Lane to Keable Road, Cornwallis Drive and Steele Close are convoluted, narrow and restricted.
3 The applicants’ transport assessment and travel plan
The applicants’ transport assessment and travel plan is lazy in terms of cycling. It appears to be a desk-based study and states merely that cycling is possible from certain hamlets and villages. No consideration is given to current barriers such as the A12 or the perceived safety of the roads and lanes that have to be used to reach the site, both of which would make a cycle journey dangerous or undesirable. There is no indication that the company involved has ridden any of these routes to assess their suitability.
No consideration is given to “on the ground” ease of access, even within Marks Tey.
The consultant quotes objectives of a travel plan but this scheme ignores objective two (address the access needs of staff by supporting walking, cycling and the use of public transport) and objective 3 (encourage good urban design principles that open up the site to walking, cycling and use of public transport). If this is the case at this stage, what commitment will be invested in the future?
The papers state that cycle access is possible via the grounds of Marks Tey Parish Hall. This appears to be privately owned land (possibly by the parish council). The paths within the site are not wide enough for cycling even if it was permitted. The access to the site from the A120 (picture below) would be a challenge for Bethany Shriever, Team GB’s BMX Olympic gold medallist.
The applicant gives a concession to cycling with a “green line on a map” in its transport assessment. There is no indication of land ownership, when or whether this can be achieved. Notably this access is not marked on any of the detailed plans for the site itself.
In conjunction with Highways England, the developer has looked at improvements to the junction of Old London Road with the A120. All of these except for a ban on right hand turns on the A120 have been put in abeyance pending construction of the new A12.
The applicant also talks of a 5km cycle catchment. This is out of date. Experience from cycle-friendly towns and cities shows that the advent of ebikes increases not just distances cycled but frequency too.
No estimate is given of the effect of increased motor traffic on cyclists in Old London Road, with the focus being on the ability of two heavy goods vehicles to pass each other.
While Old London Road falls within the remit of Highway England, it is not by nature a trunk road but a lightly trafficked mixed-use street. It should be subject to the designs set out in Manual for Streets (MfS) and not the Design Manual for Roads and Bridges. Page 144 of MfS states: "The DMRB is not an appropriate design standard for most streets, particularly those in lightly-trafficked residential and mixed-use areas.”
The applicant’s documents also make no mention of Local Transport Note 1/20 on cycling infrastructure or the government’s Gear Change document, which have been published for more than a year. These should have been used to shape the application.
Paragraph 3.4.5 of the transport assessment mentions the National Cycle Network routes 1 and 13. These are irrelevant when the site is so cut off for cyclists and is likely to be so for some time.
There is no indication of the type of cycle parking that the developer intends to provide, whether security is sufficient and whether it is covered. The applicant seems to have ignored the requirement at 3.6.2 of the Essex Parking Guide that “cycle parking should be conveniently located adjacent to entrances to buildings”.
No comprehensive consideration of current or future air quality has been made.
4 What we would like to see
Request |
Comments |
1 Funding and provision of a S segregated cycleway from Marks Tey station to join with Old London Road 90m west of the A120 junction |
Station Road may need widening. Possible land ownership issues, although the wooded area south of the station,and between Old London Road and the A12 south of the A120 (the teardrop), may belong to Highways England. The cycleway should cross the teardrop to join Old London Road 90m south of the A120 junction. Street lighting needed |
2 Existing crossing moved 30 metres east, closer to junction with roundabout |
This will allow use of existing verges to give better access, ie, no use of footway by cycles |
3 Remodelling of plans for phase 1 and phase 2 so that a segregated cycleway/footway is provided along the northern edge of the site between Dobbies Lane and the A120, crossing Old London Road to meet with the cycleway from the station. The first section of the path should have full access into the site with its design influenced by Manual for Streets |
See illustration. Land ownership issues, although parish council may be amenable? Street lighting needed. If this cannot be achieved then Old London Road will have to be looked at as the main access route. The level of traffic proposed on Old London Road would mean that a segregated cycleway would have to be provided. |
4 An alternative to 3: redesign of Old London Road to be friendlier to cyclists using Manual for Streets. |
As noted at 3 |
5 Funding for improvements for cycle/foot access into the Keable Road estate at Keable Road, Cornwallis Drive and Steele Close |
Relatively easy. These accesses should meet LTN 1/20 |
6 Developer to work with Highways England on tying in development to old A12 once the new road opens, subject |
Dependent on detailed drawings from Highways England |
7 Agreement to help fund medium to long-term maintenance of Dobbies Lane |
|
8 Details of cycle parking (type and position) to be approved by CBC before construction begins |
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Prowse Place and Wilmot Place in June 2020.
The Prowse Place closure was originally by means of bollards but has been replaced by ANPR and signage while the Wilmot Place closure is by means of bollards.
Camden also proposes to:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Barton and District Bridleways group are campaigning to get a popular route for cycling, walking and horseriding recognised as an official Right Of Way.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for proposed change of use of offices (Class B1) to 3 residential apartments (ClassC3)
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by MB // 1 thread
Access for cyclists, pedestrians with buggies or wheelchairs is poor here. Pavement is not flush to carriageway, barriers effectively block access & there are oftern cars parked too. As a part of the 'London Cycle Network' (74) it is substandard. If the route is intended for cyclists, it should be made accessible to them. Other users (car drivers) should be prevented from blocking it.
In addition, there is a 'cyclists dismount' sign!
Created by Adam Edwards // 0 threads
Stanbroughbury is the new housing area proposed by Gascoyne-Cecil Estates (Hatfield House) in the area north of Hatfield Garden Village. The suggested route above would pass through the housing.
The route would directly link the new housing to Hatfield Station via a cycling and walking route of about a mile. To achieve this requires a new bridge over the A1(M) and Comet Way and makes use of the handy gap in the housing into the Birchwood estate at this point. As the alternatives for cars are a longer way round via Wellfield Road or via Stanborough, this new route would give waling and cycling a time advantage which would therefore incentivise use.
The route assumes a second entrance to Hatfield station at the north end of platforms 2/3 either onto Beaconsfield Road or St Albans Road East. This will be needed anyway as demand at the station increases. Opening this second entrance will also encourage walking to and from the north and west of Hatfield as it will shorten walking times quite considerably. This second entrance should be for walking and cycling only.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Harmston Rise.
Inadequate drainage.
Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.
Created by Paul Gasson // 1 thread
From the commonplace introduction:
"Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
The Highams Park Town Centre scheme area has over 6,500 addresses and includes the area framed by North Circular Road, Hatch Lane, Woodford New Road and other minor roads. We want to make it easier for you to walk and cycle local journeys should you choose to. We also want to improve the look and feel of the area, making it an even more enjoyable place, boosting business and giving residents a sense of pride in their community."
Created by Heather Rainbow // 1 thread
Planning application 15/02303/FUL is to make Long lane open to motor vehicles so that they can reach 10 new houses on Pyotts Hill House.
This will be debated at 6.30pm on Wednesday 10 August at the Civic Offices Basingstoke.
Cycle Basingstoke has already objected because the road along Long lane is only 3metres wide and pedestrians, cyclists, lorries and cars will have to share this space.
There is good access from Lily Mill Chine
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Cycling Dumfries // 0 threads
There is now a nice cycle path that takes you from the river away from Devorgilla bridge, but there is no easy way to go from there to the College Street cycle track or Terregles Street as both Market Square and Howgate Street are one-way going the other way. Adding an 'except cycles' sign and allowing contraflow cycling along Market Square (which is not a fast or busy road), combined with a crossing across Buccleuch St on the east side of the street would provide an alternative route through town when the Whitesands is closed (or the Loreburn Bridge). At the moment, to get across Buccleuch street you have to cross in three cycles of the light and there are railings preventing pedestrian and bike access to College Street. This would also benefit pedestrians.
At the bottom of South Avenue, the road turns into a short cycle track. There is no dropped kerb.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Penrhyn Rd & Surbiton Rd. Open until 17th November.