Fulbourn Neighbourhood Plan
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on its proposals to make it easier to cross over the three roads at this roundabout.
One residents’ and three paid for parking spaces will be removed
The drawing is here
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Peterborough Local Plan identifies the required delivery of 19,440 new homes and 17,600 new jobs by 2036.
The 80-hectare Norwood site will provide 2,000 dwellings, a local centre and primary school. Delivery of the development has been sl=plit into two phases. The first phase includes up to 870 dwellings and auxiliary uses, including a primary school and local centre, and will initially be accessed via Newborough Road. The second phase will complete the build.
Development of 945 dewellings, a local centre, a primary school and a secondary school has already begun at the Paston Reserve (adjacent to the Norwood site).
The project requires improvements along the A16 corridor including a new access roundabout with the A16 and a new junction with Newborough Road. The plan is to connect the two points of access with an internal road.
Highways England have agreed in principle to the proposed interventions.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04705/FUL: Removal of Building E (Use Class B8). Extensions and alterations to existing buildings A - D (Use Class E) including first floor extension above existing frontage building, reinstatement of brick chimney, hard and soft landscaping works and associated works and infrastructure.
149 Cherry Hinton Road, Cambridge, CB1 7BY
Created by York Cycle Campaign // 1 thread
Conditions 22 (Submission of details of the junction between the internal access road and the highway) & 26 (Details of the highway works to be submitted) of planning permission 18/01296/FULM
Proposed Hotel 46 - 50 Piccadilly York YO1 9NX
York
Application reference : AOD/20/00352
Created by Steven Moseley // 1 thread
The Ministry of Defence (MOD) is investing in new military firing range capabilities for Colchester Garrison which will release Middlewick Ranges for disposal. This presents an opportunity for the site to contribute towards Colchester’s need for new housing, and the land has been identified in the draft Colchester Local Plan as being suitable for up to 1,000 new homes and supporting local infrastructure.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The council are consulting on a redevelopment of Ditton Walk.
Created by John Seton // 1 thread
A new town development of 25000 houses has been proposed on land that is roughly encircled by Barrington, Foxton, Shepreth, Meldreth, Bassingbourn, Whaddon, Wimpole and Orwell. This number of new houses and associated infrastructure is about half the size of Cambridge, so it would impact all these parishes, and existing cycling commuting and leisure routes in the area. Plans are a a very early stage, but the concept has so far caused concern at district and parish levels. A South West Cambridgeshire Action Group has been set up with representation from each of the parishes in the footprint. A first meeting has been held. The development promises a zero carbon footprint and green transport links.
Early days for detailed cycle campaigning input, so this is a placeholder to start discussions.
Created by Roxanne (CEO) // 1 thread
The Co-op at the Radegund Road/Perne Road roundabout have axed 3 out of 5 exemplary and well-used sheffield stands to install an Amazon collection point.
Created by Steven Moseley // 0 threads
Local Enterprise Partnerships (LEPs) were set up by Government in 2011 to identify and support local strategic growth priorities, encourage business investment and promote economic development. This approach puts businesses in the driving seat and empowers the private sector to determine its own priorities.
The South East Local Enterprise Partnership (SELEP) is a genuine partnership for growth between business, government and education. We put the role of enterprise – as the driving motor of the economy – at the heart of everything we do; and we work in partnership with central government and its key agencies to pursue and attract major investment into the South East to deliver significant economic growth.
One of 38 LEPs established by the government, our role is to forge a partnership which properly understands the economic challenges and opportunities of our area, encourage an environment which delivers prosperity and to be directly accountable to local people and local businesses. LEPs decide what the priorities should be for investment in roads, buildings, and facilities in the area as part of an integrated approach to growth and infrastructure delivery.
We represent the largest LEP area in England outside London, in terms of population and economic output, and cover an area encompassing the local authority areas of East Sussex, Essex, Kent, Medway, Southend and Thurrock.
Created by Steven Moseley // 1 thread
In March 2018 Transport East was launched, as a new Sub-National Transport Body to deliver a collective vision for the future of transport in Essex, Norfolk, Suffolk, Southend-on-Sea and Thurrock.
As a partnership, we bring together the local transport and planning authorities, and business leaders with Network Rail and Highways England. We enable the region to speak with one voice on the transport investment needed to drive transformational growth and improve the quality of life for all that live and work in the region.
Why do we need Transport East?
As one of seven Sub-national Transport Bodies covering England, Transport East will develop a Transport Strategy and Delivery Plan for the region which ensures that transport fully supports its members shared ambitions for economic growth, quality of life and prosperity.
Created by Chris Howell // 1 thread
The City Council through Cambridge Investment Partnership are running a consultation (pre-planning application) for their proposed redevelopment of 71-73 Fen Road, including improved cycle access to the 'Five Trees' open space. This potentially supports an improved new cycle route from Green End Road/Cam Causeway to the Chisholm Trail on Fen Road.
Created by Jean Dollimore // 2 threads
Camden Council is proposing the following changes intended to improve bus journey times, cycling and pedestrian facilities:
But they have forgotten to consider removing the speed cushions in Camden Park Road
The drawing also mentions the potential for vehicle activated speed signs on Torriano Avenue.
BUT
Created by Jean Dollimore // 1 thread
Camden Council recently implemented an LTN in the area around Arlington Road. Following feedback on the scheme, they propose two major amendments
1. No entry into Arlington Road from Inverness Street (i.e. southbound movements restricted to allow only emergency vehicles and bicycles).
This filter will be enforced by
Parking and loading will be forbidden within ten metres of this junction.
2. New filter on Mornington Place at the junction with Clarkson Row/Mornington Terrace (instead of the filter at Mornington Crescent.
This new filter will allow cycles to pass and will be enforced by
The junction of Mornington Place with Mornington Crescent will revert to two-way operation
Created by Jean Dollimore // 1 thread
Camden Council is currently installing Pop-up cycle lanes on Chalk Farm Road .
To facilitate this, they are proposing to make new parking changes to the existing Chalk Farm Road scheme affecting the following streets: Hawley Street, Hartland Road, Harmood Street, Ferdinand Street
Harmood Street: Through-traffic restriction scheme
Camden proposes a filter (that allows cycles and emergency vehicles to pass through) on Harmood Street just south of the junction with Clarence Way.
Enforced by:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04755/FUL | Erection of 1 No. 1.5 storey 2 bedroom dwelling, retention of existing flats, together with bin & cycle store and landscaping | 30 Davy Road Cambridge CB1 3QW
Created by Jean Dollimore // 1 thread
Camden Council has recently installed Pop-up cycle lanes on York Way. They are now consulting on proposals for three of the signalised junctions.
Agar Grove / Brewery Road junction
Freight Lane junction
Handyside Street / Copenhagen Street junction
Created by Flic // 2 threads
Ely hospital is up for redevelopment/expansion. Consultation docs so far don't describe anything other than first priority being a multistorey car park.
Created by Roxanne (CEO) // 1 thread
Issue for general campaigning activity and organisation in Abbey area.
Created by Stephen B // 1 thread
Unfortunately the road I travel a lot on in Littleport is badly pock marked and muddy from frequent farm machinery use.
In these circumstances close passes are even more critical than on better roads if they exist. Many cars give a decent safety pass adhering to the new directives in the Highway Code but many do not. I was shocked to be close passed by a police vehicle this morning and have reported it. I did not want to make a particular complaint but wanted it logged in an incident forum. The call handler suggested I would have to make an official incident report so I had to go down that route.
Created by Steven Moseley // 1 thread
Our Colchester Business Improvement District (BID) is an organisation that represents more than 400 businesses across Colchester town centre and aims to make a difference to our streets. By building relationships and partnerships with key stakeholders across the town, we see Colchester moving in a positive direction through Invigorating, Imagination and Connecting.
Our projects over the next five year will be targeted towards making Colchester a better place to work, live and visit. We will add value through business support, making Colchester cleaner and greener, town centre marketing and events.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on a review of its parking permits and parking charges
Motivation: diesel vehicle ownership and trips have not reduced sufficiently to address the AQ impact.
The proposed changes are from April 2021 unless stated otherwise.
Residents Parking permits
The diesel surcharge to be raised from 21.5% to 50% of the petrol vehicle permit price (surcharge ranging from £65 to £237 per annum).
The petrol vehicle permit price depends on CO2 emissions and ranges from £130-£274 p.a.
Electric vehicles get free permits.
Visitors permits
Not mentioned in the consultation document so presumably remain the same e.g. £1.12 per hour.
Car clubs
The current permit price is £289. This will change to a price based on CO2 emissions with a diesel surcharge.
The price for electric cars will be £86. The lowest CO2 emission polluter pays £289.
Doctors’ permits
The same charges as for a Car Club vehicle.
Paid for parking sessions
Currently, the borough is divided into four areas each with different tariffs. The areas with the two lowest tariffs will be merged.
CO2 emission based charging will be introduced and the diesel surcharge will be raised from 21.5% to 50%
Electric vehicles pay from £2.40 to £4.14 per hour in areas 1 to 3 while the charge for petrol cars range from £3.43 (lowest polluter in the cheapest area) to £5.15 (highest polluter in most expensive area).
Increased price for coaches £13.82 per hour.
Maximum stay of 1 hour where there is currently no maximum and in CPZs with only 2 hours of operation.
South of Euston Road maximum stay reduced from 2 to 1.5 hour. From April 2022.
Motorcycle parking
Discount electric m/c residents’ permit (to £22 p.a.) and increase the price of petrol ones (to £130 p.a.). They also have business permits and visitor permits.
Convert all dedicated solo m/c bays to shared use with one of the various permits. No more free parking for m/cs.
Paid for parking £3.42-£5.92 per hour for petrol and £1.72-£2.96 electric per hour.
Created by Alex Jenkins // 1 thread
Liveable Streets is a multi-million pound borough-wide street and public space improvement programme. It aims to improve the look and feel of public spaces in neighbourhoods across the borough and make it easier, safer, and more convenient to get around by foot, bike and public transport. Tower Hamlets would like to hear your views on the proposals for the Old Ford Road West project area.
We've listened to your concerns on issues including:
What is proposed and why are the proposals important?
Four schemes have been developed to improve walking and cycling, create better public space, reduce through-traffic and improve air quality.
We are proposing traffic changes and calming measures to make local streets safer for everyone. This includes crossing improvements, better street lighting, tree planting, and School Streets.
Every day thousands of vehicles are travelling through the area and not stopping. These vehicles are contributing to the already unacceptable levels of air pollution on your streets, outside your schools and around your local shops. These proposals are also planned to work together with the approved Bethnal Green scheme and proposed changes in the Bow Liveable Streets area. This scheme in the Old Ford Road West area will provide essential links by creating improved active travel routes for everyone.
The Liveable Streets proposals will help improve road safety, public spaces, and air quality. However to achieve this some local residents who want to drive may have to travel longer distances.
All properties will still be accessible by vehicle, but people will also have greater choice on how they get around by removing barriers to walking and cycling.
The Local Plan is being replaced to a new version.
This is a multi-year process, involving several stages of consultation, research, and review.
This will replace the 2018 Local Plan. Discussion on that was at:
https://camcycle.cyclescape.org/issues/72-local-plan-2018-creation-and-review
Martin Lucas-Smith // 1 thread
20/04514/FUL | Erection of a building comprising student accommodation (C2)(113 rooms in 14no flats), including an ancillary reception building, part change of use of existing building from non-residential institution (D1) to cafe (A3), including outdoor terrace with associated landscaping, open space, car and cycle parking and infrastructure. | St Matthews Centre Sturton Street Cambridge Cambridgeshire CB1 2QF.
Neighbour Consultation Expiry Date: Wed 23 Dec 2020
Standard Consultation Date: Wed 25 Nov 2020
Standard Consultation Expiry Date: Wed 23 Dec 2020
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by MB // 1 thread
Access for cyclists, pedestrians with buggies or wheelchairs is poor here. Pavement is not flush to carriageway, barriers effectively block access & there are oftern cars parked too. As a part of the 'London Cycle Network' (74) it is substandard. If the route is intended for cyclists, it should be made accessible to them. Other users (car drivers) should be prevented from blocking it.
In addition, there is a 'cyclists dismount' sign!
Created by Adam Edwards // 0 threads
Stanbroughbury is the new housing area proposed by Gascoyne-Cecil Estates (Hatfield House) in the area north of Hatfield Garden Village. The suggested route above would pass through the housing.
The route would directly link the new housing to Hatfield Station via a cycling and walking route of about a mile. To achieve this requires a new bridge over the A1(M) and Comet Way and makes use of the handy gap in the housing into the Birchwood estate at this point. As the alternatives for cars are a longer way round via Wellfield Road or via Stanborough, this new route would give waling and cycling a time advantage which would therefore incentivise use.
The route assumes a second entrance to Hatfield station at the north end of platforms 2/3 either onto Beaconsfield Road or St Albans Road East. This will be needed anyway as demand at the station increases. Opening this second entrance will also encourage walking to and from the north and west of Hatfield as it will shorten walking times quite considerably. This second entrance should be for walking and cycling only.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Harmston Rise.
Inadequate drainage.
Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.
Created by Paul Gasson // 1 thread
From the commonplace introduction:
"Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
The Highams Park Town Centre scheme area has over 6,500 addresses and includes the area framed by North Circular Road, Hatch Lane, Woodford New Road and other minor roads. We want to make it easier for you to walk and cycle local journeys should you choose to. We also want to improve the look and feel of the area, making it an even more enjoyable place, boosting business and giving residents a sense of pride in their community."
Created by Heather Rainbow // 1 thread
Planning application 15/02303/FUL is to make Long lane open to motor vehicles so that they can reach 10 new houses on Pyotts Hill House.
This will be debated at 6.30pm on Wednesday 10 August at the Civic Offices Basingstoke.
Cycle Basingstoke has already objected because the road along Long lane is only 3metres wide and pedestrians, cyclists, lorries and cars will have to share this space.
There is good access from Lily Mill Chine
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Cycling Dumfries // 0 threads
There is now a nice cycle path that takes you from the river away from Devorgilla bridge, but there is no easy way to go from there to the College Street cycle track or Terregles Street as both Market Square and Howgate Street are one-way going the other way. Adding an 'except cycles' sign and allowing contraflow cycling along Market Square (which is not a fast or busy road), combined with a crossing across Buccleuch St on the east side of the street would provide an alternative route through town when the Whitesands is closed (or the Loreburn Bridge). At the moment, to get across Buccleuch street you have to cross in three cycles of the light and there are railings preventing pedestrian and bike access to College Street. This would also benefit pedestrians.
At the bottom of South Avenue, the road turns into a short cycle track. There is no dropped kerb.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Penrhyn Rd & Surbiton Rd. Open until 17th November.