12/0747FUL Temporary (2 year) cycle storage Betjeman House, Botanic House and Public Houses Hills Road
Temporary cycle storage, car parking and refuse facilities in connection with 06/0552/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Temporary cycle storage, car parking and refuse facilities in connection with 06/0552/FUL
Created by Simon Nuttall // 2 threads
Every few years the City or County publish and refresh their give-away map.
This issue is to capture discussion about the map, including the details included on it, the style of the map and any inaccuracies or other changes that are needed.
Created by David Earl // 1 thread
Notification letter from City Council received
http://idox.cambridge.gov.uk/online-applications/simpleSearchResults.do?action=firstPage
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Martin Lucas-Smith // 1 thread
The Coe Fen to Granchester route suffers from a few problems:
- Lack of left turn filter at the lights
- Poor surfacing
- Interface with cars along the access road to the car park
This is an application for a new hotel with 127 rooms, a bar, restaurant and car park. The Planning Officers are satisfied it won't have an unacceptable impact on traffic.
Created by cobweb // 1 thread
This former CRC building has been in state of disrepair for some time now and this is application to demolish and construct three new buildings for non-residential educational and training use, following demolition of all buildings on
the site except the Ragged School.
Created by cobweb // 1 thread
The proposal here is to tidy this area up and install 5 extra bike racks.
Created by David Earl // 1 thread
Letter received from City Council re back entrance to Lion Yard and toilets at Fisher Square (which there was lots of fuss about a while back).
Created by cobweb // 5 threads
This is an idea, reported in the Cambridge News, to demolish the Park Street car park and rebuild it, so that the car parking is underground but leaving the cycle parking above ground. Flats would be built on top.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by cobweb // 1 thread
This is a proposal, as part of the Environmental Improvements Programme, to install cycle racks on the highway near the Derby Store deli and post office. Cycle parking is almost non-existent here but there is not much support for taking away on road car parking apparently.
Created by cobweb // 0 threads
A proposal to restrict right turns from Barton Road or Lammas Land car park into Grantchester Street.
Created by cobweb // 1 thread
A mixed development of ground floor commercial units and 12 flats above those. This will replace the current small parade of shops near the Perne Road roundabout that have got into a state over the years.
This is a proposal to demolish the existing (but now closed) Rosemary Branch pub and replace it with eight houses and two flats.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Gregory Williams // 1 thread
A cycle link is needed to Barton Court Grammar School in order to give the school students and staff a viable means of reaching school.
Created by Gregory Williams // 1 thread
Cyclists need to walk for a short distance to follow NCR2 next to the Prince of Wales Roundabout if they wish to avoid using the A20 on the roundabout.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Martin Lucas-Smith // 13 threads
Formal policies on health, with mention of cycling, need to be improved as a way of providing an additional tool to be used in transport and planning.
Martin Lucas-Smith // 34 threads
Collisions, 'accidents' and even occasional deaths involving cyclists remain an issue in Cambridge.
This Cyclescape issue is so we can collect the reports and debate approaches to tackling this issue through the media and through policy objectives.
There are a range of issues regarding cyclists breaking the law in Cambridge. This issue is intended as a container for strategic discussion of how this can be resolved.
There are of course many problems with drivers breaking the law, and discussions need to be in that context also, but this is issue is primarily for addressing the cycling side.
Created by Simon Nuttall // 5 threads
Cycle parking has long been a problem in the Romsey and Petersfield areas, mainly because of lack of proper provision.
Martin Lucas-Smith // 1 thread
The proposal is for demolition of the existing non residential language
school and replacement with new with on site accommodation for students. Cycle parking needs to be checked.
Martin Lucas-Smith // 1 thread
The Regent Street crossing has been upgraded. How are people finding it?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
NCN45 across Peckforton Hill at risk of being closed
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
Created by mikewg // 1 thread
Numerous people responding to the survey experience safety issues with this location. Some comments here:
Town centre around the monument, the cobbles are a night mare and shake you badly, I have had my bike lights shaken off before, and had to save them from being run over. You cannot cycle quickly over the cobbles.
Taunton Town Centre - cobbles & volume of traffic
I go through the centre of town. I have had a couple of accidents on the cobbled surface outside the market house over the years of cycling this route. Both resulted in injuries including concussion, facial injuries requiring stitching, a shoulder and hip injury which required physio and steroid injections to resolve. The second of these happened on a wet day, when I was forced to brake because a bus driver, having seen me coming, decided to pull out in front of me. He was relatively remorseful, but it was an accident that would not have happened if 1, he hadn't taken the decision that a cyclist didn't matter, and 2, the road surface was smoother as the braking action unsteadied me on a rough surface - the fall was inevitable as soon as I touched the brakes really. As a consequence, I now cycle along the back of the market house as I cannot bring myself to cycle across the cobbled road surface.
Cobblestones around parade
High Street; ridiculous cobbled roundabout making town centre very dangerous
Cobbles in front of Market Hall
Cobble stones on roundabout in centre of town feels unsafe and dangerous for cyclists.
COBBLES on the main parade
cobbles in town centre
'cobbles ' Market house - dangerous surface - traffic in a hurry .
Cobbles at Market House roundabout,
Cobbles around Burma Memorial make it impossible to take hand off handlebars to signal and are treacherous at best of times
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Simon Munk // 1 thread
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations."
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by Chris Neston // 1 thread
The NCN 5 route over Frodsham Marshes is very badly surfaced such that can only be used by proficient cyclists with MTBs. As a result most people use the unpleasant main road alternative on the A56.
An opportunity exists to get funding to surface this as a result of community funding from the Marshes Windfarm development. Closing date Feb 28.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by ken thomas // 2 threads
Installation of 17.5m single stack pole base station and associated works
Telcommunications Site Off Caldy Valley Road Great Boughton Chester Cheshire CH3 5PR
Application reference : 17/00266/TEL
No drawings or details are shown on the planning website.
A recent drawing seen for the project shows the cabinets blocking half the available width of the cycle/footpath. Such siting is not acceptable on a recently developed cycleway designed to specific standards.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Leigh P // 1 thread
Tovells Road and Caudwell Avenue are a huge rat run in the morning for a limited period of time for parents going to St Mary's Catholic School. I understand the school catchment is not local. Cars turinging into these roads too fast and quite clearly without looking whist rusing to get children to school on time. Often have to swerve on bike to avoid.
Tovellls Road is the only way cars can get from the south and east of the town to St Mary's primary school...well it's not actually, but it's the route most of them take....They should be using Woodbridge Road and Caudwell Hall Road that are maintained for such traffic. Tovells Road is single file traffic only (due to parked cars), but the reason they all get away with it is they are all going in the same direction at the same time! They seem to have a system of most going to the school along Tovells Road, and returning along Holland Road.
I assume St Mary's shool has a travel plan and this includes regular liaison with parents to use safer and appropriate routes, in an appropriate manner.
Created by Sarah Wood // 0 threads
There is no secure cycle parking outside the shops at Chapel Road and Fernhill Road
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity