PA 220148 CrossCottBoxted7 01
Redevelopment of site to create 7 no. new residential units
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Redevelopment of site to create 7 no. new residential units
Created by Steven Moseley // 1 thread
220154: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220153: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220155: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220149: Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
220147: Demolition of existing garages and redevelopment of site to provide 6 x 2 bedroom flats
Created by Steven Moseley // 1 thread
The application proposes: 1. Change of use of the property from C3 to Sui Generis 2. Creation of a High Standards House in Multiple Occupation for 8no. Occupants consisting in 8no. bedrooms, 8no. en- suites, 1no. shared toilet and one communal area 3. G
Created by Rosamund Humphrey (Admin Officer) // 5 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
Rods at this cattle grid have either sheared off or been vandalised (not that recently). It already appears on the county fault report site ref 372428, from June 2021, but nothing appears to have been done about it.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Outline planning permission for the demolition of existing buildings and
provision of up to 16 dwellings up to 120sq.m of office accommodation
access public open space and landscaping (including details of access and
with all other matters reserved)
Reference: S/4057/19/OL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing building and erection of building with two Class E units at ground floor level and 9 flats above.
56 - 60 Hills Road Cambridge Cambridgeshire CB2 1LA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 1bed dwelling.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 22/00231/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from vacant retail to 7 No. apartments (Use Class C3)
212 - 214 Newmarket Road Cambridge Cambridgeshire CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 22/00219/FUL
Created by Will Bramhill // 1 thread
This is our response to a planning application for a new secondary school. It may help others up against a similar scheme. https://docs.google.com/document/d/1xSVC4pzeBz1uW3ujT9VtKSKjFyp1rk668E4dd4prPtk/edit?usp=sharing
Proposed installation of parking places for electric vehicles in the De Freville Avenue and Riverside areas, Cambridge. Closing date for comment is 31 January 2022.
One diagram at least shows incursion into the pavement.
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial changes at Oakley Square (north) at the junction with Crowndale Road put in under an ETO in December 2020. (No Entry for motor vehicles from Crowndale Road into Oakley Square – north).
Camden also proposes for the Crowndale Road junction:
- The planters and droppable bollard to be replaced with a new ‘continuous footway’ with a widening of the pavement along Crowndale Road
- The cycle entry gap is to be re-aligned to accommodate the pavement
- A new tree and bench are to be installed alongside the continuous footway
A new bike hangar is to replace a residents’ parking bay outside 50 Oakley Square (north).
Camden also proposes for the junction with Eversholt Street.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05431/FUL | First floor side and single storey rear extensions to create two self-contained flats. |
17 Greenlands Cambridge CB2 0QY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05578/FUL | Change of use to large 7bed HMO (7 persons) sui generis. Rebuild and extend existing garage to bedroom 7 including changing to pitch roof. First floor rear extension (bedroom 6, previously approved under 20/01261/FUL). |
45 Leete Road Cambridge CB1 9HB
Created by Steven Moseley // 1 thread
Outline application for the erection of five dwellings
Created by Steven Moseley // 1 thread
Outline planning application for: up to 50 dwellings; a new vehicle drop-off/pick up point; and access from Peldon Road. All Matters Reserved, except access
Created by Will Bramhill // 0 threads
See planning application comment at link below. NB this is a good blueprint for any cycle groups looking to comment on new schools. https://www.ensembling.com/273042
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05549/FUL | Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an office/business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of existing buildings.
The Emperor 21 Hills Road Cambridge CB2 1NW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05362/FUL | Single storey front and side extension and first floor extension to create a 1no 1bed flat above existing detached building at the rear of 6 Kings Hedges Road.
6E Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for Hybrid Planning Application comprising Full Planning Permission for c47,280sqm (GEA) of Class E floorspace comprising an office building (One Milton Avenue) and two lab buildings together with ground floor amenity uses, a Mobility Hub comprising of c1031 car parking spaces including c3,742sqm of Class E floorspace at ground floor level, a temporary car park of c379 spaces, a wildlife habitat area, Network Rail compound area, enabling works and associated infrastructure; and Outline Planning Permission for c41,940 sqm (GEA) of Class E floorspace comprising one lab building and one office building, together with ground floor amenity uses, enabling works and associated infrastructure.
Cambridge North Commercial Quarter
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05042/FUL | Elevational changes to accommodate 7 No. dwellings. | 212-214 Newmarket Road Cambridge CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Reserved Matters application for third housing phase (known as BDW3) including 210 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 17, 18, 22, 25, 26, 28, 35, 40, 49, 58, 62, 66, and 69 pursuant to outline approval 07/0003/OUT | Darwin Green One BDW3 Development Site Huntingdon Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Darwin Green One BDW4
Development Site
Huntingdon Road
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout