21/02836/FUL Single storey extension to 1 bed flat with cycle shelter.
The cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
The cycle parking.
Reserved Matters approval for appearance, landscaping, layout and scale for 373 dwellings, access roads, cycle and pedestrian routes, cycle and car parking, landscaping, utilities and associated ancillary structures at Lots S1 and S2, North West Cambridge Development following outline planning permission S/1886/11 as varied by planning permission S/2036/13/VC
Lots S1 And S2, North West Cambridge Development Eddington Avenue Cambridge CB3 0LH
South Cambridgeshire
Application reference : 21/04036/REM
Erection of 280 dwellings, including 72 affordable dwellings, two new vehicular accesses from Babraham Road, pedestrian and cycle access, publicly accessible open space, a Local Area of Play (LAP) and a Local Equipped Area of Play (LEAP), landscaping and earthworks and surface water drainage, associated amenity space and attenuation features and internal infrastructure.
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
South Cambridgeshire
Application reference : 21/03955/FUL
Created by Steven Moseley // 1 thread
Proposed commercial office block (resubmission of application 211722
Created by Steven Moseley // 1 thread
Demolition of existing detached house and erection of 2 No. detached dwellings.
Created by Steven Moseley // 1 thread
Proposed two bedroom bungalow and vehicle access to rear of 168 St Andrews Avenue
Created by Steven Moseley // 1 thread
202349 Application to determine if prior approval is needed for proposed New dwelling dwellinghouses on detached block of flats.
202161 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
202321 Application to determine if prior approval is required for two new additional floors of residential floor space to create 8no. 2 bedroom flats.
202001 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
Created by Steven Moseley // 1 thread
Residential use of former car park to international house following change of use from B1a (offices) to C3 (dwellings) of international house (resubmission of planning permission 170259)
Created by Steven Moseley // 1 thread
Change of use of existing dwellinghouse to 6 flats and erection of replacement building at rear to provide 4 flats. Resubmission and variation of planning approved under reference 180116
Created by Steven Moseley // 1 thread
Converting a vacant office unit into a Job Centre Plus office for the DWP. This facility will provide 29 work coach stations to attend customers by appointment only. It will have an interview room for customers and staff welfare areas. Ten of the existi
Created by Steven Moseley // 1 thread
Erection of 2No. semi-detached 2 bedroom houses.
Sam // 1 thread
Before the pandemic you could turn right here, now, any cyclist ends up on car-repelling paint with nowhere obvious to go.
sound+fury // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping
Hills Road Sixth Form College Hills Road Cambridge CB2 8PE
Cambridge
Application reference : 21/03780/FUL
Created by Steven Moseley // 1 thread
Proposed re-development to the rear of Willows Shopping parade, to deliver a new residential development of 6No dwellings consisting of 3No three bedroom dwellings and 3No four bedroom dwellings.
Created by Steven Moseley // 1 thread
Proposed extensions and alterations to existing hotel to accommodate an additional 20 rooms/suites, additional meeting rooms and improved leisure facilities. Proposed external refurbishments and internal alterations.
Created by Steven Moseley // 1 thread
House conversion to 2 x 2 bed flats, and 1 x 2 bed maisonette. Single storey extension to ground floor flat and balcony to the first floor flat. Along with the current approved 150493 and 150492 parking arrangements 3 additional parking spaces are provid
Created by Steven Moseley // 1 thread
Change of Use of the first floor from ancillary office of a light industrial unit to Residential to provide 1 no. 3 bedroom apartment
Created by Colin Wing // 1 thread
Westminster City Council and the London Borough of Camden are working together to deliver a Neighbourhood Traffic Management (NTM) scheme in Covent Garden including the Seven Dials area.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Steven Moseley // 1 thread
Retail park comprising retail (A1) and restaurant (A1/A3/A5) units with associated parking and landscaping. Resubmission of 172935 - REVISIONS RECEIVED
Created by Will Bramhill // 1 thread
Plan 211788
Industrial estate, London Road, Marks Tey
(was 202373)
Introduction
Colchester Cycling Campaign objects to this plan. If it is considered for approval, mitigation should be carried out and completed at the same time as the development. If any work is outstanding it should be subject to a legal agreement and funded via a 20-year Section 106 or CIL agreement. See table below for a list of mitigation measures.
Highways England should consider this scheme not as a standalone but as a major part of other recent planning applications in this area, which all add to motor traffic. This particular application is disappointing in terms of provision for active travel: it is likely to increase dependence on short to medium-distance commuting by car while further undermining cycling through increased traffic and greater danger, especially in Old London Road.
Note that paragraph 109 of the National Planning Policy Framework states that “development should only be prevented or refused ... if there would be an unacceptable impact on highway safety, or residual cumulative impacts on the road network would be severe”.
We trust that the Highways England stage one road safety audit (CBC site August 6) will include consideration of walking and cycling routes in the area. The auditor should ride the routes, as recommended by LTN 1/20 and Gear Change.
Two major plans have recently been rejected owing to poor cycling and walking provision: the Devonshire Quarter in Cambridge and Lidl in Salford (download of decision notice).
Although the applicant’s draft travel plan and transport assessment has sections on walking and cycling, nothing is provided in terms of improved off-site infrastructure – at least not until 2028, by which time the new section of the A12 may be complete. It is unclear whether the developer would be prepared to fully fund improvements at that stage.
2 Current situation
The Kelvedon to Colchester cycleway runs past the development site along Old London Road. This is used by longer-distance cycle traffic as well as cycle commuters to and from nearby industry and adjacent homes. Current use is low, in part because of poor connections.
This route links to the part of Marks Tey west of the A120 via Dobbies Lane via a relatively new cycleable bridge across the railway track. However cycle accesses to homes north of Jays Lane/Long Green/Wilsons Lane to Keable Road, Cornwallis Drive and Steele Close are convoluted, narrow and restricted.
3 The applicants’ transport assessment and travel plan
The applicants’ transport assessment and travel plan is lazy in terms of cycling. It appears to be a desk-based study and states merely that cycling is possible from certain hamlets and villages. No consideration is given to current barriers such as the A12 or the perceived safety of the roads and lanes that have to be used to reach the site, both of which would make a cycle journey dangerous or undesirable. There is no indication that the company involved has ridden any of these routes to assess their suitability.
No consideration is given to “on the ground” ease of access, even within Marks Tey.
The consultant quotes objectives of a travel plan but this scheme ignores objective two (address the access needs of staff by supporting walking, cycling and the use of public transport) and objective 3 (encourage good urban design principles that open up the site to walking, cycling and use of public transport). If this is the case at this stage, what commitment will be invested in the future?
The papers state that cycle access is possible via the grounds of Marks Tey Parish Hall. This appears to be privately owned land (possibly by the parish council). The paths within the site are not wide enough for cycling even if it was permitted. The access to the site from the A120 (picture below) would be a challenge for Bethany Shriever, Team GB’s BMX Olympic gold medallist.
The applicant gives a concession to cycling with a “green line on a map” in its transport assessment. There is no indication of land ownership, when or whether this can be achieved. Notably this access is not marked on any of the detailed plans for the site itself.
In conjunction with Highways England, the developer has looked at improvements to the junction of Old London Road with the A120. All of these except for a ban on right hand turns on the A120 have been put in abeyance pending construction of the new A12.
The applicant also talks of a 5km cycle catchment. This is out of date. Experience from cycle-friendly towns and cities shows that the advent of ebikes increases not just distances cycled but frequency too.
No estimate is given of the effect of increased motor traffic on cyclists in Old London Road, with the focus being on the ability of two heavy goods vehicles to pass each other.
While Old London Road falls within the remit of Highway England, it is not by nature a trunk road but a lightly trafficked mixed-use street. It should be subject to the designs set out in Manual for Streets (MfS) and not the Design Manual for Roads and Bridges. Page 144 of MfS states: "The DMRB is not an appropriate design standard for most streets, particularly those in lightly-trafficked residential and mixed-use areas.”
The applicant’s documents also make no mention of Local Transport Note 1/20 on cycling infrastructure or the government’s Gear Change document, which have been published for more than a year. These should have been used to shape the application.
Paragraph 3.4.5 of the transport assessment mentions the National Cycle Network routes 1 and 13. These are irrelevant when the site is so cut off for cyclists and is likely to be so for some time.
There is no indication of the type of cycle parking that the developer intends to provide, whether security is sufficient and whether it is covered. The applicant seems to have ignored the requirement at 3.6.2 of the Essex Parking Guide that “cycle parking should be conveniently located adjacent to entrances to buildings”.
No comprehensive consideration of current or future air quality has been made.
4 What we would like to see
Request |
Comments |
1 Funding and provision of a S segregated cycleway from Marks Tey station to join with Old London Road 90m west of the A120 junction |
Station Road may need widening. Possible land ownership issues, although the wooded area south of the station,and between Old London Road and the A12 south of the A120 (the teardrop), may belong to Highways England. The cycleway should cross the teardrop to join Old London Road 90m south of the A120 junction. Street lighting needed |
2 Existing crossing moved 30 metres east, closer to junction with roundabout |
This will allow use of existing verges to give better access, ie, no use of footway by cycles |
3 Remodelling of plans for phase 1 and phase 2 so that a segregated cycleway/footway is provided along the northern edge of the site between Dobbies Lane and the A120, crossing Old London Road to meet with the cycleway from the station. The first section of the path should have full access into the site with its design influenced by Manual for Streets |
See illustration. Land ownership issues, although parish council may be amenable? Street lighting needed. If this cannot be achieved then Old London Road will have to be looked at as the main access route. The level of traffic proposed on Old London Road would mean that a segregated cycleway would have to be provided. |
4 An alternative to 3: redesign of Old London Road to be friendlier to cyclists using Manual for Streets. |
As noted at 3 |
5 Funding for improvements for cycle/foot access into the Keable Road estate at Keable Road, Cornwallis Drive and Steele Close |
Relatively easy. These accesses should meet LTN 1/20 |
6 Developer to work with Highways England on tying in development to old A12 once the new road opens, subject |
Dependent on detailed drawings from Highways England |
7 Agreement to help fund medium to long-term maintenance of Dobbies Lane |
|
8 Details of cycle parking (type and position) to be approved by CBC before construction begins |
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Prowse Place and Wilmot Place in June 2020.
The Prowse Place closure was originally by means of bollards but has been replaced by ANPR and signage while the Wilmot Place closure is by means of bollards.
Camden also proposes to:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Barton and District Bridleways group are campaigning to get a popular route for cycling, walking and horseriding recognised as an official Right Of Way.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for proposed change of use of offices (Class B1) to 3 residential apartments (ClassC3)
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout