Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
Cambridge Retail Park redevelopment
Railpen are consulting on changes to the Retail Park on Newmarket Road
-
DNA Cycle Path - Biomedical Campus to Shelford
Anything to do with the DNA path - lighting, vegetation, obstructions
-
Fallen Tree - At head height
Fallen Tree at head height - reported to Kent County Council - Fault Number 240650775
-
Foliage cutback - Fordwich Way
Recent FOI confirmed that foliage cutback should occur in ‘Bi-annually’ on the Fordwich Way route in May and September every year. No foliage cutback has taken place on the Fordwich Way in May. The whole path is slowly becoming overgrown and will need cutting back as per Kent County Councils own internal documents. The whole route needs foliage clearance - Fault No. 811012
-
24/01905/FUL Sidney St and Hobson St - office space, demolition of cinema
Creation of additional storey above existing single storey (middle) part of the site and redevelopment of rear part of the site comprising: demolition of existing building and structures and creation of five storey office building.
16 - 17 Sidney Street Cambridge Cambridgeshire CB2 3HG
Cambridge
Application reference : 24/01905/FUL
-
Driving on Mere Way
On a recent ride up The Mere Way I noticed that the wooden pillar had been removed and that cars were being driven on the route .
-
Better cycle parking at Canterbury Asda
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
-
Cycle parking at Longmarket
Cycle parking provision at Longmarket needs to be improved. The are insufficient stands at Rose Lane, leading to cyclists using other street furniture, such as pictured.
-
24/00889/FUL Clarendon House
Partial demolition, alterations and extensions to Clarendon House, new ramped vehicular access, delivery bay, cycle access and parking, etc etc
Quite a lot of cycle parking, and some reduced car parking, in the basement. Cycle and car movements cross with potential visibility issues.
-
24/00922/FUL Erection of seven dwellings, with access, car and cycle parking
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
-
Quy Mill Planning Application 24/00688/LBC
Planning application not addressing cycling issues credibly.
-
Sidgwick Avenue: General condition and future
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
-
Milton Road Residents Parking
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
-
Stapleford and Great Shelford Neighbourhood Plan
New thread to discuss proposals.
-
Darwin Green trees
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
-
23/04289/FUL Construction of new science park building
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
-
24/00166/OUT Construction of a new business/science park
Outline planning application for demolition of existing buildings and construction of a new business/science park (Use Class E(g)) and ancillary "hub" building (Use Class E(b)(d)(f)) and associated car parking and landscaping.
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
South Cambridgeshire
Application reference : 24/00166/OUT
-
Fen Ditton village cycle path resurfaced with very uneven finnish .
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
-
24/00384/FUL Change of layout to existing customer car park.
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
-
22/04976/CONDB (Cycle parking)
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
-
23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
-
Fallen Tree CC24 - Fordwich Way
Fault Number: 779265
-
Fallen Tree Fordwich Way
Fault Number: 779261
-
Missing dropped kerb at northern end of Legacy Park cycle path
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
A23 Streatham Hill Cycleway
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
- High quality segregated cycle lanes and bus stop bypasses throughout the extent of the scheme
- Straight-across pedestrian crossings relocated to be where people want to walk and cross the road
- Zebra crossings proposed to cross the cycle lane to signalised pedestrian crossings across the main carriageway
- 2 additional pedestrian crossings
- Bus lanes maintained or implemented and operational hours extended to between 07:00 - 19:00 Monday to Saturday throughout the scheme
- 20mph speed limit throughout
- Changes to side road access including restrictions and closures, redesign and resurfacing
- New traffic signals at the Telford Avenue junction
- Improvements to public realm throughout the route, unlocking areas by removing central brick build planters and planting of new trees and landscaping
- Changes to some parking and loading provision
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
-
Brixton Liveable Neighbourhood - Winter 2020 engagement
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
-
Fitzroy Lane has no pavement
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
-
Hostile driving on Red Cross Lane
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
-
Huntingdon Road: Girton Corner area improvements needed
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner. -
insufficient visibility due to solid building site boundary
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
-
Mere Way ( ancient path )
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
-
A1 Archway Road
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
-
Colchester Borough Council
Of and relating to Colchester Borough Council.
-
S/3018/15/COND5 Northstowe Phase 1 cycle routes details
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
-
20/04969/FUL: Extensions and alterations to Babbage House, CB3 0AT
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
-
Proposed Trial Changes to Haverstock Hill and Rosslyn Hill
Camden proposes the following measures:
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
- On the northbound side, cyclists will have to use the existing bus lane from Belsize Avenue on – the bus lane times will be made 24/7.
- All parking and loading spaces are to be removed from this section of Haverstock and Rosslyn Hill to make space for the cycle lanes. Some will be replaced in side roads.
- All pedestrian refuges at informal crossings are being removed to make room for the cycle lanes. Five of the existing ‘uncontrolled’ crossing points on Haverstock Hill will be replaced with four new zebra crossings and one new signalised crossing .
- Shared use bus boarders will be deployed at the eight bus stops – bus stops will be moved into the carriageway to allow for the cycle lane to continue next to the kerb.
- At the junctions with England’s Lane and Pond Street ‘pedestrian countdown’ facilities, ‘early release’ for bikes and extended ‘Advanced Stop Lines’ will be provided subject to approval from TfL
- Timed loading bays (Mon-Sat 10 am - 2pm) along (on southbound side opposite Steeles Road Haverstock Hill and full time loading bay opposite Belsize Lane.
- If the consultation is agreed, cycle parking will be added at the shopping parades.
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
-
No cycling space on Marine Parade
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
-
CBC Wayfinding Survey
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance. -
Cambridge Children's Hospital
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
-
Better walking and cycling in St Neots
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
-
Barrier to trikes and trailers
this old fashioned barrier on a major cycleway needs a rethink
-
Removing exclusionary barriers across Cambridgeshire
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
-
Long wait to cross Busway / Station Road, Histon
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
-
Unlit post hazard
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
-
Abuse for not using cyclepath
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
-
Peterborough cycling issues
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
-
Can't cycle along Hillside Passage
There's a nice cycle route along Mount Nod Road into Hillside Road that's interrupted by a short section of path marked "No Cycling". Adding a cycle path would remove an (unsigned) detour via Faygate Road.
-
Better cycle parking at Canterbury Asda
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
-
Downing College now banning cycling through their grounds
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.