Airport way blocked with no provision for cyclists .
The cycleway is blocked by building work with a footway separated from the road which is too narrow to cycle and with no ramps to
leave or join the road .
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by cpax // 2 threads
The cycleway is blocked by building work with a footway separated from the road which is too narrow to cycle and with no ramps to
leave or join the road .
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 9 dwellings within 1 apartment building comprising studios, one and two bedroom apartments, together with landscaping, parking arrangements, bike and bin provision and associated infrastructure (following demolition of the existing dwelling)
303 Histon Road Cambridge Cambridgeshire CB4 3NF
Application reference: 22/00758/FUL
Created by Steven Moseley // 1 thread
The erection of a three bedroom house with off street parking, to the garden of 31 Victoria Road
Created by Steven Moseley // 1 thread
Outline application for the construction of a single storey dwelling following the demolition of an existing extension to no. 1 London Road, Marks Tey. (All matters reserved apart from access).
Created by Steven Moseley // 1 thread
Application for Prior Approval under Part 18 of the Town and Country Planning (General Permitted Development) (England) Order (As Amended) - Installation of an MDU building, to improve railway services in Colchester and Essex.
Created by Will Bramhill // 0 threads
Created by Steven Moseley // 1 thread
Demolition of Former Bearings Factory and Erection of New Building comprising 3 no. blocks over four and five storeys containing 65 no. Residential Apartments and 2 no. Commercial Units (Class E), with undercroft car parking.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping.
Hills Road Sixth Form College Hills Road Cambridge Cambridgeshire CB2 8PE
Application reference: 22/00712/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of Numbers 16 and 16A Burleigh Street and the construction of a three-storey building comprising a retail unit on the ground floor and 3 no. apartments on the first and second floors providing bin and cycle stores on land to the rear of the new retail unit and access to the proposed apartments will be from Burleigh Place, while the retail element will remain accessible from the front (i.e. Burleigh Street).
16 And 16A Burleigh Street Cambridge Cambridgeshire CB1 1DG
Application reference: 22/00655/FUL
Created by Will Bramhill // 1 thread
Needs better connection to Trinity School
Created by Steven Moseley // 1 thread
220235: Application to determine if prior approval is required for a proposed Change of Use from Commercial Businesss & Service (Use Class E) to Dwellinghouses (Use Class C3)
220201: Proposed roof conversion, including construction of new dormer windows and external fa¦ade upgrades to form 4 new apartments at Ewer House
PA_220201_44-46CrouchStRoof_01.txt, PA_220235_44-46CrouchSt_01.txt
sound+fury // 1 thread
this old fashioned barrier on a major cycleway needs a rethink
Created by Martinb // 1 thread
Kissing gate obstructs cycle route, especially for trailer and trikes
sound+fury // 1 thread
This is a dangerous junction for people on bikes. How can it be improved?
Anon // 0 threads
The path / cut-through between Ditton Meadows and Ditton Walk (next to Ronald Rolph Court) is currently blocked by a fallen tree.
It's possible to squeeze under it with a standard bicycle if you're agile.
Looks like someone attempted to block the path with red/white tape at the southern entrance, but it's all come down of course. I didn't see any warning at the northern entrance.
There's a report on the County Council site (387287), but it's marked as 'closed' on the 21st Feb. Tree was still there on 22nd.
[later:] It was gone by 15 March (probably long before).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
22/00293/FUL | Two storey side, single storey rear and roof extension to create 4 flats
184 Thoday Street Cambridge CB1 3AX
Application reference: 22/00293/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing garages and hardstanding and erection of 14no houses (7 at Aragon Close and 7 at Sackville Close) together with car parking, green space, landscaping, bin and bike stores and associated infrastructure.
Land At Aragon Close And Sackville Close Cambridge Cambridgeshire
Cambridge
Application reference : 22/00583/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2bed bungalow to the rear of 157 Green End Road
157 Green End Road Cambridge CB4 1RW
Cambridge
Application reference : 22/00469/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Submission of details required by conditions 10 (Cycle Parking layout) and 15 (Traffic Management Plan) of planning permission 19/1453/FUL.
107 Shah Jalal Mosque Darwin Drive Cambridge Cambridgeshire CB4 3HQ
Cambridge
Created by Roxanne (CEO) // 1 thread
A member of the public has informed us that the signals at the junction of East Road and Mill Road are not detecting people on bikes on the lane in front of the fire station heading east on Mill Road. Has anyone else experienced this? We can get an email to the signals team.
Created by Steven Moseley // 1 thread
Outline application to demolish existing dwelling and construct 6 No. 1 bedroom, 2 storey flats with associated works to garden and parking area
Created by Jean Dollimore // 1 thread
Following consultation in January 2021, Camden put in a trial scheme using ETOs in May 2021.
The main features of the trial scheme were:
Camden is now proposing to make the scheme permanent but with the following changes:
These changes still ensure no rat-running on Grafton Road and on Queen’s Crescent, which is very important for cycling since C6 runs along Grafton Road and Queen’s Crescent provides a useful route to it from the western end of Prince of Wales Road (although cycling though isn’t convenient on market days).
Camden’s stated motivations for the changes in QC are
Other proposed additions:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.