Fulbourn Neighbourhood Plan
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on its proposals to make it easier to cross over the three roads at this roundabout.
One residents’ and three paid for parking spaces will be removed
The drawing is here
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Peterborough Local Plan identifies the required delivery of 19,440 new homes and 17,600 new jobs by 2036.
The 80-hectare Norwood site will provide 2,000 dwellings, a local centre and primary school. Delivery of the development has been sl=plit into two phases. The first phase includes up to 870 dwellings and auxiliary uses, including a primary school and local centre, and will initially be accessed via Newborough Road. The second phase will complete the build.
Development of 945 dewellings, a local centre, a primary school and a secondary school has already begun at the Paston Reserve (adjacent to the Norwood site).
The project requires improvements along the A16 corridor including a new access roundabout with the A16 and a new junction with Newborough Road. The plan is to connect the two points of access with an internal road.
Highways England have agreed in principle to the proposed interventions.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04705/FUL: Removal of Building E (Use Class B8). Extensions and alterations to existing buildings A - D (Use Class E) including first floor extension above existing frontage building, reinstatement of brick chimney, hard and soft landscaping works and associated works and infrastructure.
149 Cherry Hinton Road, Cambridge, CB1 7BY
Created by York Cycle Campaign // 1 thread
Conditions 22 (Submission of details of the junction between the internal access road and the highway) & 26 (Details of the highway works to be submitted) of planning permission 18/01296/FULM
Proposed Hotel 46 - 50 Piccadilly York YO1 9NX
York
Application reference : AOD/20/00352
Created by Steven Moseley // 1 thread
The Ministry of Defence (MOD) is investing in new military firing range capabilities for Colchester Garrison which will release Middlewick Ranges for disposal. This presents an opportunity for the site to contribute towards Colchester’s need for new housing, and the land has been identified in the draft Colchester Local Plan as being suitable for up to 1,000 new homes and supporting local infrastructure.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The council are consulting on a redevelopment of Ditton Walk.
Created by John Seton // 1 thread
A new town development of 25000 houses has been proposed on land that is roughly encircled by Barrington, Foxton, Shepreth, Meldreth, Bassingbourn, Whaddon, Wimpole and Orwell. This number of new houses and associated infrastructure is about half the size of Cambridge, so it would impact all these parishes, and existing cycling commuting and leisure routes in the area. Plans are a a very early stage, but the concept has so far caused concern at district and parish levels. A South West Cambridgeshire Action Group has been set up with representation from each of the parishes in the footprint. A first meeting has been held. The development promises a zero carbon footprint and green transport links.
Early days for detailed cycle campaigning input, so this is a placeholder to start discussions.
Created by Roxanne (CEO) // 1 thread
The Co-op at the Radegund Road/Perne Road roundabout have axed 3 out of 5 exemplary and well-used sheffield stands to install an Amazon collection point.
Created by Steven Moseley // 0 threads
Local Enterprise Partnerships (LEPs) were set up by Government in 2011 to identify and support local strategic growth priorities, encourage business investment and promote economic development. This approach puts businesses in the driving seat and empowers the private sector to determine its own priorities.
The South East Local Enterprise Partnership (SELEP) is a genuine partnership for growth between business, government and education. We put the role of enterprise – as the driving motor of the economy – at the heart of everything we do; and we work in partnership with central government and its key agencies to pursue and attract major investment into the South East to deliver significant economic growth.
One of 38 LEPs established by the government, our role is to forge a partnership which properly understands the economic challenges and opportunities of our area, encourage an environment which delivers prosperity and to be directly accountable to local people and local businesses. LEPs decide what the priorities should be for investment in roads, buildings, and facilities in the area as part of an integrated approach to growth and infrastructure delivery.
We represent the largest LEP area in England outside London, in terms of population and economic output, and cover an area encompassing the local authority areas of East Sussex, Essex, Kent, Medway, Southend and Thurrock.
Created by Steven Moseley // 1 thread
In March 2018 Transport East was launched, as a new Sub-National Transport Body to deliver a collective vision for the future of transport in Essex, Norfolk, Suffolk, Southend-on-Sea and Thurrock.
As a partnership, we bring together the local transport and planning authorities, and business leaders with Network Rail and Highways England. We enable the region to speak with one voice on the transport investment needed to drive transformational growth and improve the quality of life for all that live and work in the region.
Why do we need Transport East?
As one of seven Sub-national Transport Bodies covering England, Transport East will develop a Transport Strategy and Delivery Plan for the region which ensures that transport fully supports its members shared ambitions for economic growth, quality of life and prosperity.
Created by Chris Howell // 1 thread
The City Council through Cambridge Investment Partnership are running a consultation (pre-planning application) for their proposed redevelopment of 71-73 Fen Road, including improved cycle access to the 'Five Trees' open space. This potentially supports an improved new cycle route from Green End Road/Cam Causeway to the Chisholm Trail on Fen Road.
Created by Jean Dollimore // 2 threads
Camden Council is proposing the following changes intended to improve bus journey times, cycling and pedestrian facilities:
But they have forgotten to consider removing the speed cushions in Camden Park Road
The drawing also mentions the potential for vehicle activated speed signs on Torriano Avenue.
BUT
Created by Jean Dollimore // 1 thread
Camden Council recently implemented an LTN in the area around Arlington Road. Following feedback on the scheme, they propose two major amendments
1. No entry into Arlington Road from Inverness Street (i.e. southbound movements restricted to allow only emergency vehicles and bicycles).
This filter will be enforced by
Parking and loading will be forbidden within ten metres of this junction.
2. New filter on Mornington Place at the junction with Clarkson Row/Mornington Terrace (instead of the filter at Mornington Crescent.
This new filter will allow cycles to pass and will be enforced by
The junction of Mornington Place with Mornington Crescent will revert to two-way operation
Created by Jean Dollimore // 1 thread
Camden Council is currently installing Pop-up cycle lanes on Chalk Farm Road .
To facilitate this, they are proposing to make new parking changes to the existing Chalk Farm Road scheme affecting the following streets: Hawley Street, Hartland Road, Harmood Street, Ferdinand Street
Harmood Street: Through-traffic restriction scheme
Camden proposes a filter (that allows cycles and emergency vehicles to pass through) on Harmood Street just south of the junction with Clarence Way.
Enforced by:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04755/FUL | Erection of 1 No. 1.5 storey 2 bedroom dwelling, retention of existing flats, together with bin & cycle store and landscaping | 30 Davy Road Cambridge CB1 3QW
Created by Jean Dollimore // 1 thread
Camden Council has recently installed Pop-up cycle lanes on York Way. They are now consulting on proposals for three of the signalised junctions.
Agar Grove / Brewery Road junction
Freight Lane junction
Handyside Street / Copenhagen Street junction
Created by Flic // 2 threads
Ely hospital is up for redevelopment/expansion. Consultation docs so far don't describe anything other than first priority being a multistorey car park.
Created by Roxanne (CEO) // 1 thread
Issue for general campaigning activity and organisation in Abbey area.
Created by Stephen B // 1 thread
Unfortunately the road I travel a lot on in Littleport is badly pock marked and muddy from frequent farm machinery use.
In these circumstances close passes are even more critical than on better roads if they exist. Many cars give a decent safety pass adhering to the new directives in the Highway Code but many do not. I was shocked to be close passed by a police vehicle this morning and have reported it. I did not want to make a particular complaint but wanted it logged in an incident forum. The call handler suggested I would have to make an official incident report so I had to go down that route.
Created by Steven Moseley // 1 thread
Our Colchester Business Improvement District (BID) is an organisation that represents more than 400 businesses across Colchester town centre and aims to make a difference to our streets. By building relationships and partnerships with key stakeholders across the town, we see Colchester moving in a positive direction through Invigorating, Imagination and Connecting.
Our projects over the next five year will be targeted towards making Colchester a better place to work, live and visit. We will add value through business support, making Colchester cleaner and greener, town centre marketing and events.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on a review of its parking permits and parking charges
Motivation: diesel vehicle ownership and trips have not reduced sufficiently to address the AQ impact.
The proposed changes are from April 2021 unless stated otherwise.
Residents Parking permits
The diesel surcharge to be raised from 21.5% to 50% of the petrol vehicle permit price (surcharge ranging from £65 to £237 per annum).
The petrol vehicle permit price depends on CO2 emissions and ranges from £130-£274 p.a.
Electric vehicles get free permits.
Visitors permits
Not mentioned in the consultation document so presumably remain the same e.g. £1.12 per hour.
Car clubs
The current permit price is £289. This will change to a price based on CO2 emissions with a diesel surcharge.
The price for electric cars will be £86. The lowest CO2 emission polluter pays £289.
Doctors’ permits
The same charges as for a Car Club vehicle.
Paid for parking sessions
Currently, the borough is divided into four areas each with different tariffs. The areas with the two lowest tariffs will be merged.
CO2 emission based charging will be introduced and the diesel surcharge will be raised from 21.5% to 50%
Electric vehicles pay from £2.40 to £4.14 per hour in areas 1 to 3 while the charge for petrol cars range from £3.43 (lowest polluter in the cheapest area) to £5.15 (highest polluter in most expensive area).
Increased price for coaches £13.82 per hour.
Maximum stay of 1 hour where there is currently no maximum and in CPZs with only 2 hours of operation.
South of Euston Road maximum stay reduced from 2 to 1.5 hour. From April 2022.
Motorcycle parking
Discount electric m/c residents’ permit (to £22 p.a.) and increase the price of petrol ones (to £130 p.a.). They also have business permits and visitor permits.
Convert all dedicated solo m/c bays to shared use with one of the various permits. No more free parking for m/cs.
Paid for parking £3.42-£5.92 per hour for petrol and £1.72-£2.96 electric per hour.
Created by Alex Jenkins // 1 thread
Liveable Streets is a multi-million pound borough-wide street and public space improvement programme. It aims to improve the look and feel of public spaces in neighbourhoods across the borough and make it easier, safer, and more convenient to get around by foot, bike and public transport. Tower Hamlets would like to hear your views on the proposals for the Old Ford Road West project area.
We've listened to your concerns on issues including:
What is proposed and why are the proposals important?
Four schemes have been developed to improve walking and cycling, create better public space, reduce through-traffic and improve air quality.
We are proposing traffic changes and calming measures to make local streets safer for everyone. This includes crossing improvements, better street lighting, tree planting, and School Streets.
Every day thousands of vehicles are travelling through the area and not stopping. These vehicles are contributing to the already unacceptable levels of air pollution on your streets, outside your schools and around your local shops. These proposals are also planned to work together with the approved Bethnal Green scheme and proposed changes in the Bow Liveable Streets area. This scheme in the Old Ford Road West area will provide essential links by creating improved active travel routes for everyone.
The Liveable Streets proposals will help improve road safety, public spaces, and air quality. However to achieve this some local residents who want to drive may have to travel longer distances.
All properties will still be accessible by vehicle, but people will also have greater choice on how they get around by removing barriers to walking and cycling.
The Local Plan is being replaced to a new version.
This is a multi-year process, involving several stages of consultation, research, and review.
This will replace the 2018 Local Plan. Discussion on that was at:
https://camcycle.cyclescape.org/issues/72-local-plan-2018-creation-and-review
Martin Lucas-Smith // 1 thread
20/04514/FUL | Erection of a building comprising student accommodation (C2)(113 rooms in 14no flats), including an ancillary reception building, part change of use of existing building from non-residential institution (D1) to cafe (A3), including outdoor terrace with associated landscaping, open space, car and cycle parking and infrastructure. | St Matthews Centre Sturton Street Cambridge Cambridgeshire CB1 2QF.
Neighbour Consultation Expiry Date: Wed 23 Dec 2020
Standard Consultation Date: Wed 25 Nov 2020
Standard Consultation Expiry Date: Wed 23 Dec 2020
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en