Cherry Hinton Hall
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03912/FUL | Residential development containing eight flats along with access, car parking, landscaping and infrastructure | Land Rear Of Gibson House Paradise Street Cambridge Cambridgeshire CB1 1DJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03838/FUL | Demolition of existing house and the erection of 3 No. dwellings | 38 High Street Chesterton Cambridge CB4 1NG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03877/FUL | Change of use from residential (C3) to large scale HMO for 12 persons (Sui Generis)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03966/FUL | Change of use from one dwelling to four flats, single storey rear extension and external alterations. | 1 Blackhall Road Cambridge CB4 3NJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread for committee meetings
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03034/FUL | Erection of new 2-Bedroom house adjoining existing house (number 168 New Street). | 168 New Street Cambridge CB1 2QX
Tom McKeown // 1 thread
Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.
Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS
Cambridge
Application reference : 20/03742/FUL
The former level crossing near a petrol station and the Strikes bowling alley is a frequent source of conflict between cycling and motoring. As of 2020, this is a toucan crossing just west of the former railway's line, necessitating cyclists to slalom across it. There are short cycleways on the south side of the A148 Lynn Road and Gaywood Road providing access to the main entrance of King Edward School.
20/02728/REM | Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/3064/16/OL for 155 dwellings following demolition of two existing dwellings | Land South Of 279 St Neots Road Hardwick Cambridgeshire
Created by Paul Robison // 1 thread
Storey's Way open again to through traffic
Created by Steven Moseley // 2 threads
Development of 153 dwellings with associated parking, landscaping, open space, drainage and infrastructure and formation of new access and alterations to existing access onto Berechurch Hall Road.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases, in line with government guidance on the Covid-19 response. Walworth has been identified as a priority area.
We are installing experimental measures below to create a low-traffic neighbourhood and re-purpose the street space for the pedestrians, cyclists, the local community and businesses:
- Permeable closures (these are streets closed to motor vehicles but open to pedestrians and cyclists) on: Larcom Street, Browning Street, Merrow Street, Amelia Street, Alberta Street, Iliffe Street, Penton Place, Chapter Road, Cooks Road, Blackwood Street and Walworth Place.
- Introducing a bus gate on Carter Street and Manor Place.
- Footway widening on Braganza Street and Carter Street.
- Introducing a one-way system on Braganza Street Westbound only, and reversing the one-way system on Chapter Road to Northbound only.
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Rye Lane will be closed to motor traffic from 6 July to allow more space for social distancing for shoppers, cyclists and pedestrians, and to ensure the works around Peckham Rye station can be carried out safely at the same time.
We want to hear from you about the effects of this closures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. The East Dulwich are has been identified as a priority.
On the 30 June we installed Phase 1 of the East Dulwich Streetspace measures, which is a permeable road closure (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove, south of Tell Grove.
The East Dulwich Streetspace Phase 2 measures will be installed on 3rd September. Details of these are below and aim to re-purpose the street space for pedestrians, cyclists and the local community:
• a permeable closure using planters (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove at the junction with Grove Vale
• a permeable closure using planters on Derwent Grove at the junction with Grove Vale
• a permeable closure using planters on Elsie Road at the junction with Grove Vale
• a permeable closure using planters on Tintagel Crescent at the junction with Grove Vale
• a school street closure during school drop-off and pick-up on Tintagel Crescent and Elsie Road (residents and emergency services will still be permitted entry)
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. Dulwich has been identified as a priority.
We have now installed the experimental measures below to re-purpose the street space for pedestrians, cyclists, the local community and businesses:
- a closure of Calton Avenue south of Gilkes Crescent
- a closure on Court Lane at the Calton Avenue junction
- a closure of Calton Avenue at the Dulwich Village junction
We want to hear from you about the effects of these closures.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Greater Cambridge Partnership operates as a Joint Committee, under powers delegated by its three local authority partners.
It is led by a decision-making Executive Board which coordinates the overall strategic vision and drives forward the partnership’s programme of work. It is run in accordance with a clear governance structure, agreed by all partners.
The Executive Board is made up of one representative from each of the City Deal partners. While the law governing Joint Committees only allows the three local authority representatives voting rights, they consider the advice of the other representatives, to make sure decisions also represent the business and academic sectors.
The Board is advised and informed by a Joint Assembly. The Joint Assembly provides advice to the Executive Board, drawing on the broad expertise of its 15 members. The Assembly’s membership is made up of three elected councillors from each of the three councils in the Greater Cambridge area, and reflects the political composition of their council. The other City Deal partners each nominate three representatives, as stakeholders from a range of organisations within the fields of business and academia.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Issues related to Milton being worked on by Milton Cycling Campaign, a new group formed by Camcycle members living in the village.
Created by Heather Coleman // 1 thread
There's a wet greasy line the length of the southbound carriageway on Hills Road between OLEM and Station Road, just outside the bike lane. When I cycled down there around 8.50am there was a very strong smell of diesel.
TAKE CARE. Diesel doesn't just evaporate as petrol would but leaves a greasy slippery residue that can persist for some days.
I've tried reporting to County, who don't want to know. I've bounced the report to City; who knows if they will do anything or say it's not their problem either.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Planning and Transport Scrutiny Committee consists of nine councillors who scrutinise the decisions of the Executive Councillor for Planning Policy and Open Spaces and the Executive Councillor for Transport and Community Safety.
20/03523/FUL | Erection of a 5 storey building and a 6 storey building for commercial/business purposes, erection of a transport hub, gymnasium, surface parking, landscaping and associated infrastructure including demolition of the existing building (St John's House) and associated structures. | Land In The North West Part Of The St Johns Innovation Park Cowley Road Milton Cambridge Cambridgeshire CB4 0ZT
Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure
Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire
Cambridge
Application reference : 20/03802/FUL
Tom McKeown // 1 thread
Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.
A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.
Created by MJR // 0 threads
The Hardwick Road cycleway abruptly terminates at the corner of Beech Road, within sight of the next section at South Gates roundabout. Cyclists wishing to continue towards town without being obstructed by motorists need to either use six beg-button crossings of the A149 Hardwick Road to cross over and back, or use four beg-button crossings to head towards Hardings Way (where another three beg-buttons and currently a dismount greets them), or they can illegally slalom contraflow through a parking bay, footway and oncoming traffic - and unsurprisingly many do the latter.
All of the houses by the parking bay blocking the way have their own drives and it is not that much used. It could be repainted as a two-way cycleway, protected with posts and the slopes into the ends made shallower.
Created by MJR // 0 threads
A cycleway was built alongside Scania Way, but it is dangerous in many ways, including:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.