Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from offices (B1) to dwellinghouses (C3)
Tom McKeown // 1 thread
Access to Impington Village College has not been looked at in any detail since the college opened in 1939. What issues are there for cycling to the college? What opportunities are there to make improvements?
Created by Jean Dollimore // 1 thread
The main proposal is for a new Zebra crossing outside the Harmood Children’s Centre
The new zebra will be 6.5m wide and replaces a 12+ m wide crossing with a pedestrian island. The consultation says: “Reducing the carriageway width can also have a traffic calming effect.
Space will also be provided for rain gardens (SUDs) and cycle parking for 6 to 8 bikes
The other proposal is to provide a temporary bus stand for the 27 bus during the Morrisons development and to relocate the affected parking bays. The new bus stand will be beside the Denton residential block at the northern end of Ferdinand Street.
Created by Roxanne (CEO) // 1 thread
https://www.cambridgesciencepark.co.uk/cambridge-science-park-north/
Trinity College has begun to consult on a proposal to transform a parcel of adjacent agricultural land to the east of Histon and Impington into Cambridge Science Park North. The proposal is at early stages with a submission having been made into the Call for Sites process which forms part of the Greater Cambridge local plan
Science Park North will be created on land which is currently used for farming, but is located close to the Park and Ride and the waste transfer site which are both accessed from the A10.
It is located close to the Area Action Plan land to the east and the Project Team is working closely with AAP Members on a number of areas which are of mutual interest. It is anticipated that the timescale for the AAP process will match the development timescale for the Greater Cambridge Local Plan and the CSP North timetable is planned to complement this.
CSP North is also located close to Cambridge Regional College, which sits between the existing science park and the proposed expansion land. Discussions are underway with CRC with the ambition of providing facilities for greater collaboration in the future which could be in the form of expansion but also education and work apprenticeship schemes for future students of the CRC.
The transport strategy for Cambridge Science Park North is targeted at complementing the improvement plans for the existing science park. The initial aim is to ensure that there is no increase in car use across the two sites, with a medium and long-term target of reducing car usage across the two sites completely.
The early ideas are to provide a consolidated space for parking which will serve both Science Park sites, which will be linked to a mobility hub providing pedestrian, cycling, autonomous vehicle and sustainable mass transit facilities for onward travel. These will utilise existing infrastructure such as Mereway Cycle Route and the Guided Busway as well as proposed infrastructure such as The CAM.
These proposals will improve access to the whole of Cambridge, reducing current traffic on the Milton Road by providing a hub serving the wider AAP area including access to Cambridge North Station.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Cambridgeshire communities must work together for a green recovery from Covid-19 and to play our part in reducing carbon emissions. Zero Carbon Streets is the campaign that brings local groups together to do this.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 201309: Demolition of existing structures & redevelopment to construct 4 No. three bed residential dwellings (Class C3) with associated garages, car parking & access. All matters r
Created by Steven Moseley // 1 thread
Erection of new dwelling (previously approved under 172115)
Created by Steven Moseley // 1 thread
he Essex County Council (St Nicholas Street, Colchester) (One Way) Order 202*Statement of ReasonsSummary of the LocationSt Nicholas Street, Colchester, illustrated on drawingref. 169_HAT_GA_110 Rev. B.Reasons for the Proposed ChangesThis one-way restriction is part of a wider public realm improvement project proposed by Colchester Borough Council for the area around St Nicholas Square. For details of the proposed development, visit their webpage https://www.colchester.gov.uk/info/cbc-article/?id=KA-035711Benefits of the Proposed ChangesTo enhance the public realm in St Nicholas Square, and minimise carriageway to create enhanced footways and space availablefor outdoor seating. The key aims of the St Nicholas Square project are to:• Create a more pedestrian friendly environment, less dominated by car anddelivery traffic• Create more outdoor seating space for cafés and restaurants to spill out• Createspace for market stalls and events to happen• Ensure the space is accessible to all usersA number of local Councillors have been supportive of the scheme and the overall ambition to create a more pedestrian friendly and open square, which supports local businesses through the creation of more external seating areas, more space for markets and events, and increased footfall in the long term.CBC have secured central government funding enabling the project to move forward.
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Steven Moseley // 1 thread
Proposed Change of Use From Stables to Medical Clinic (class E) & Refurbishment of Structure. Clinic to be used as a private GP clinic and for other allied medical professionals like Physiotherapy. Existing vehicular access to be upgraded.
Created by Steven Moseley // 1 thread
Change of use of stable/outbuildings/annexe to form a single dwelling
Created by Steven Moseley // 1 thread
Erection of four bedroom detached house
Created by Steven Moseley // 1 thread
Erection of 2 No detached single storey dwellings with attached garages, existing dwelling and garage to be demolished and alterationsto existing vehicular access
Created by Steven Moseley // 1 thread
Redevelopment of site to residential comprising of 9 flats.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.