23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
Created by Gregory Williams // 2 threads
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
Created by Gregory Williams // 1 thread
The signs at the junction between Mill Lane and St. Radigund's Street in Canterbury have gone missing.
The new shared-use path here is lovely except they've installed corduroy paving, with the very narrow bumps, on the newest stretch, to indicate the cycling and pedestrian halves, instead of the usual fat textured paving. Last week in the bad weather it caught my wheel and I skidded on it, only just avoided coming off completely. I couldn't get a photo because it was after dark, but you know the paving I mean. It's not suitable for cycle paths under any circumstances and I don't know why they've used it here. The section they installed previously, along Gregory Park up to the back entrance of the P&R, has the correct paving.
sound+fury // 1 thread
No cycle parking shown in the plans
Created by Martin Wheatley // 1 thread
How exactly more secure cycle parking will work.
Created by Gregory Williams // 1 thread
The cover has gone from the cycle parking opposite B&M Home Store, leaving cycles more exposed to the weather.
Created by Gregory Williams // 1 thread
Each winter the Crab & Winkle Way gets a puddle across the full width of the route a little south of Tyler Hill Road. This can freeze over as ice and mask potholes in the surface beneath.
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.