Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
post removed ( Nightingale Avenue )
Post removed , increased usage by cars .
-
Camber on bike entrance going east on Glisson Road not trike-friendly
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
-
-
Damaged bridleway sign
The Heathfield Bridleway is generally a good piece of off-road provision that links Thriplow to Heathfield/Duxford whilst avoiding the A505. The sign is damaged; Cambs CC say it’s not their duty to repair/replace.
-
Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
-
23/01815/FUL Residential (Cherry Hinton)
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
-
23/01701/FUL Change of use of from office to student accommodation - 8 rooms
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
-
Planned layout of new cycle/pedestrian crossing on Milton Road near Ascham Road
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
-
Mile Road /Roman Road /A 1307
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked . -
Election campaign 2024
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
-
New scoping application for 'Land South of Coldham's Lane'
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
-
temporary fencing on Haling way
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
-
A users first approach to cycle infrastructure design.
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
-
Greenway: Lode to Swaffham Bulbeck
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
-
23/1287/FUL Extension of and alterations to Quy Mill Hotel
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
-
Extension of 19-35 Regent Street
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
-
Government Transport Policy
This (apparently) revised draft leaves little/nothing for any other forms of transport and continues a policy of road expansion.
-
Planning application: 23/00795/FUL Wendy's restaurant, Emmanuel St
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
-
Hills Road North Sixth Form College
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
-
Planning application : 23/00872/REM Plaza adjacent to proposed primary school
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
-
Social Media Hostility
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
-
22/05018/REM - land to the west of Cherry Hinton Road/ Airport Way
We might need to look at the road layout proposed here.
-
Blockage on Horningsea Greenway in Fen Ditton
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
-
Lincoln's lane car park crossing
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
A23 Streatham Hill Cycleway
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
- High quality segregated cycle lanes and bus stop bypasses throughout the extent of the scheme
- Straight-across pedestrian crossings relocated to be where people want to walk and cross the road
- Zebra crossings proposed to cross the cycle lane to signalised pedestrian crossings across the main carriageway
- 2 additional pedestrian crossings
- Bus lanes maintained or implemented and operational hours extended to between 07:00 - 19:00 Monday to Saturday throughout the scheme
- 20mph speed limit throughout
- Changes to side road access including restrictions and closures, redesign and resurfacing
- New traffic signals at the Telford Avenue junction
- Improvements to public realm throughout the route, unlocking areas by removing central brick build planters and planting of new trees and landscaping
- Changes to some parking and loading provision
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
-
Brixton Liveable Neighbourhood - Winter 2020 engagement
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
-
Fitzroy Lane has no pavement
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
-
Hostile driving on Red Cross Lane
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
-
Huntingdon Road: Girton Corner area improvements needed
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner. -
insufficient visibility due to solid building site boundary
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
-
Mere Way ( ancient path )
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
-
A1 Archway Road
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
-
Colchester Borough Council
Of and relating to Colchester Borough Council.
-
S/3018/15/COND5 Northstowe Phase 1 cycle routes details
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
-
20/04969/FUL: Extensions and alterations to Babbage House, CB3 0AT
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
-
Proposed Trial Changes to Haverstock Hill and Rosslyn Hill
Camden proposes the following measures:
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
- On the northbound side, cyclists will have to use the existing bus lane from Belsize Avenue on – the bus lane times will be made 24/7.
- All parking and loading spaces are to be removed from this section of Haverstock and Rosslyn Hill to make space for the cycle lanes. Some will be replaced in side roads.
- All pedestrian refuges at informal crossings are being removed to make room for the cycle lanes. Five of the existing ‘uncontrolled’ crossing points on Haverstock Hill will be replaced with four new zebra crossings and one new signalised crossing .
- Shared use bus boarders will be deployed at the eight bus stops – bus stops will be moved into the carriageway to allow for the cycle lane to continue next to the kerb.
- At the junctions with England’s Lane and Pond Street ‘pedestrian countdown’ facilities, ‘early release’ for bikes and extended ‘Advanced Stop Lines’ will be provided subject to approval from TfL
- Timed loading bays (Mon-Sat 10 am - 2pm) along (on southbound side opposite Steeles Road Haverstock Hill and full time loading bay opposite Belsize Lane.
- If the consultation is agreed, cycle parking will be added at the shopping parades.
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
-
No cycling space on Marine Parade
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
-
CBC Wayfinding Survey
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance. -
Cambridge Children's Hospital
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
-
Better walking and cycling in St Neots
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
-
Barrier to trikes and trailers
this old fashioned barrier on a major cycleway needs a rethink
-
Removing exclusionary barriers across Cambridgeshire
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
-
Long wait to cross Busway / Station Road, Histon
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
-
Unlit post hazard
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
-
Abuse for not using cyclepath
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
-
Peterborough cycling issues
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
-
Can't cycle along Hillside Passage
There's a nice cycle route along Mount Nod Road into Hillside Road that's interrupted by a short section of path marked "No Cycling". Adding a cycle path would remove an (unsigned) detour via Faygate Road.
-
Better cycle parking at Canterbury Asda
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
-
Downing College now banning cycling through their grounds
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.