Lack of cycle link between Buckland Valley and Dover Christ Church Academy
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
20mph sign has twisted round and a sign directing to the station is pointing slightly in the wrong direction
Created by Gregory Williams // 1 thread
The cycle route on AE18 between AE429 and East Stour Farm has become overgrown and difficult to cycle through.
Created by Gregory Williams // 1 thread
Chilham station is signposted from National Cycle Route 18 via Pickelden Lane. However, the link towards NCR18 isn't signed from Chilham station and the portion along the A28 corridor isn't signed as a cycle route. The A28 is too busy for normal cycling. The path on the south side between Pickelden Lane and Chilham station should be made into shared use.
The incident has been reported to Kent Police as criminal damage, Crime Ref: 46/139801/23.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Gregory Williams // 1 thread
The cycle parking at Morrisons needs improvement. It is situated at the far end of trolley park with only some surveillance, rather than adjacent to the entrance where it would receive better surveillance. The capacity is limited by the fact that only one side of the railings can be used.
Created by Gregory Williams // 1 thread
The cycle / pedestrian route signs at the junction between the Crab & Winkle Way and Oyster Bay Trail at Stream Walk / Albert Street / Action Road have gone missing.
Created by Gregory Williams // 1 thread
2 cycle storage units.
Dragonfly House Mayfly Close Canterbury Kent CT1 1HS
Canterbury
Application reference : CA/23/01343
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Gregory Williams // 3 threads
A safe cycle route is needed to link Wingham with Canterbury. The current A257 road environment is not attractive for cycling, due to high motor traffic volumes and speeds.
Created by Gregory Williams // 1 thread
The cycle parking provision at Whitefriars is minimal and at the periphery. Well surveilled provision is needed close to the shops that it will serve.
Created by Gregory Williams // 1 thread
The streetscape has recently been repaved in St. George's Street, but it lacks cycle parking.
Created by Gregory Williams // 0 threads
The cycle parking outside Faversham Pools doesn't support bicycles properly and is poor because it doesn't encourage the frame of the bicycle to be locked.
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
Created by Gregory Williams // 1 thread
The section of the Crab & Winkle Way / NCR1 linking Westgate Court Avenue to Duke's Meadow is narrow, has sharp corners, and has poor visibility. This means that it can be difficult for cyclists and pedestrians to pass and see one another.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout