Hospital Rd - Southway ramp
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
Created by Steven Moseley // 1 thread
"Linking the A120 and A133 with a new road will unlock land to provide housing and business space, improving connectivity locally and within the wider region. It will serve a new Park and Choose site and manage traffic congestion going to Colchester Town Centre, the University of Essex and its Knowledge Gateway Technology and Research Park.
A Rapid Transit System that will prioritise public transport on a key route through Colchester. It will enable housing and business growth, allowing new and existing residents to benefit from frequent, high-quality, reliable transport connecting to the key destinations within the town. These types of system have proved successful in other towns and cities, helping create a shift away from car travel. A recently implemented example of this is the Belfast Rapid Transit Glider.
The system will service a new Park and Choose site on the proposed new community east of Colchester and help to better connect future growth areas with the rest of the town."
Created by Steven Moseley // 2 threads
"Braintree, Colchester and Tendring Councils along with Essex County Council joined together to put forward plans for three new settlements built to Garden City Principles.
The three sites based west of Braintree, on the Braintree / Colchester border and on the Colchester / Tendring border could deliver up to 43,000 new homes along the North Essex A120 corridor with significant employment opportunities and transformational new infrastructure over the next 50 years."
In May 2020 the planning inspector found the other two proposed settlements to be unsound, leaving East of Colchester as the only one of the three that could proceed.
Created by Shaun McDonald // 1 thread
Erection of multi-storey car park and ancillary buildings; Creation of access road and paved external spaces; Re-location of site access onto Friars Bridge Road. Outline application to consider access, scale and layout only (landscaping and appearance as reserved matters).
Portman Road C Car Park Portman Road Ipswich Suffolk
Ipswich
Application reference : 20/00398/OUTI3
Created by John Chamberlain // 1 thread
Road Closure on Howland Street every weekend in June
rskedgell // 0 threads
The section of Leytonstone Road E15 between number 165 and Cherry Tree Road had a single yellow line waiting restrictions, loading restriction kerb markings and bollards until 2017-18 when the road was resurfaced. A new advisory cycle lane was introduced, but the yellow lines and kerb markings were not reinstated, although I can find no evidence that the traffic order has been revoked. Footway parking has since become a serious problem here, both narrowing the available width of the footway and obstructing the cycle lane. The single yellow line and kerb markings need to be reinstated. As CEOs seem unable to enforce the footway parking, consideration should also be given to converting the cycle lane to a mandatory lane, which would enable CCTV to be used to issue PCNs by post from 22 June 2020 (there is a Newham CCTV camera at the corner of Leytonstone Road and Gurney Road).
Created by Roxanne (CEO) // 1 thread
Collection of advice for people who cycle or are thinking about cycling.
Installation of an internally illuminated Digital Interactive Wayfinding Totem displaying walking routes and cycle, bus and train information, replacing existing real time bus information sign.
Cambridge Railway Station Station Road Cambridge Cambridgeshire CB1 2JW
Cambridge
Application reference : 20/01850/ADV
20/02171/OUT | Outline planning application for the development of Northstowe Phase 3A for up to 4,000 homes, two primary schools, a local centre (including employment, community, retail and associated services, food and drink, community, leisure, residential uses and other accommodation), secondary mixed use zones (including employment, community, retail and associated services, food and drink, community, leisure, residential uses), open space and landscaped areas, sports pitches, associated engineering and infrastructure works, including the retention of the existing military lake and creation of a new lake, with details of appearance, landscaping, layout, scale and access reserved. Application is accompanied by an Environmental Statement and involves works to/affecting existing Public Rights of Way. | Northstowe Phase 3A Rampton Road Longstanton Cambs
Created by Tim Burford // 2 threads
Cambridgeshire County Council has removed the cycle lane markings on Shelford Rd, apparently as part of their response to Covid-19 - but the roadside signs are still in place. Who knows what the plan is?
Photos on Cyclestreets at #124215 to 124265 (only 7 photos, but the numbering seems to have gone mad).
Created by Edward Taylor // 1 thread
Brief proposal for temporary measures in Milton.
Raised as a result of COVID-19 distancing measures
In addition to or in concert with suggestions arising from Spaces to Breathe
1. Use a point closure at the north side of Cambridge to forbid southbound through traffic. Why? It eliminates through traffic in Milton, especially at peak times. There are other versions of this idea for Milton, such as modal filters. Driving into Milton centre should be further discouraged in favour of the A10 bypass.
2. Implement a 20mph speed limit throughout Milton. Why? Reducing speed limits slows down drivers, a bit. It shifts the balance in favour of walking and cycling. The street environment becomes calmer, cleaner and quieter. In residential areas, there are more walkers and people just drive slower naturally. In these areas, cycling and walking becomes more pleasant and statistically safer. Fatality rate in collisions drops significantly.
3. Remove on-street car storage on Cambridge Road / High street. Why? On-street car storage encourages people to choose the car when making journeys within Milton. (I've done it myself.) Nowhere within Milton is more than a 3 minute cycle journey away.
4. Give cyclists and pedestrians priority at several key junctions on the Milton-Cambridge cycle route.(Winship road to Cambride Road) Why? To encourage people to use these routes and improve safety.
The DfT has made it clear that the money will only be allocated for measures that truly make space for cycling (please let me know if you want to see the letter, as it has not been widely shared). Those painted lanes do not meet the criteria set by the government, so they will have to be paid by Cambs Highways.
The deadline for councils to bid for the funds is Friday June 5th - in 6 days! If anybody has got any follow up suggestions I would suggest emailing our concillors well before that date, as any measures proposed will also have to be reviewed by Cambs Highways before they are sent off.
sound+fury // 1 thread
Change of use from Class 1 to Class 3 residential. See thread for more.
Condition 17 - Cycle parking and Refuse storage
1 Mere Way Cambridge Cambridgeshire CB4 2JP
Cambridge
Application reference : 17/1894/COND17
Created by Anna Williams – Head of Campaigns & Engagement // 0 threads
The Greater Cambridge Partnership (GCP) has secured up to £400m of funding for the second stage of the City Deal.
20/01474/REM | Reserved Matters application pursuant to application 07/0620/OUT for Phase 3 of the Community garden at Clay Farm, to include a permanant community building (replacement of temporary building), new central east-west footpath through community garden and new cycle link to western edge of site. | Land South Of Long Road And East Of Hobson's Brook Clay Farm Development Site Long Road Cambridge
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Modification of planning obligations (Affordable Housing tenure) contained in a Section 106 Agreement dated 11 July 2018 pursuant to planning permission 17/2214/FUL.
Land At Anstey Way Cambridge Cambridgeshire
Cambridge
Application reference : 20/02289/S106A
Created by Tim Burford // 1 thread
www.cyclestreets.net/location/115949/ to 115951 -
After all our correspondence with the chief exec of Highways England this is a pretty clear two fingers to all non-motorised users - the shared-use footway comes to a sudden end dumping north/westbound cyclists et al in the south/eastbound side of a dual carriageway with a 'safety' barrier blocking the way across. Insane.
Created by Roxanne (CEO) // 3 threads
What makes a good school street?
Where should we have school streets in Cambridge?
How can we campaign for school streets?
20/02142/OUT | Outline planning application for the development of Northstowe Phase 3B, comprising up to 1,000 homes, a primary school, secondary mixed use zone (with retail and associated services, food and drink, community, leisure, employment and residential uses), open space and landscaped areas, engineering and infrastructure works, with details of appearance, landscaping, layout, scale and access reserved. Application accompanied by an Environmental Statement. | Northstowe Phase 3B Station Road Longstanton Cambs
Thom S // 1 thread
Wide road with narrow pavements and marked parking bays on both sides taking up half the width of the footpath
Could we propose to LBHF that left and right turns here are cycle-only, creating low-traffic neighbourhoods east and west of Wandsworth Bridge Road, allowing safe cycle access from Putney to Embankment?
Created by Casey // 1 thread
In order to create a safe cycling and active transport environment we need to point out what we need, where.
In line with the policy announcement from Grant Shapps MP changes should be urgent and immediate so this is a space to plan, map them out and look at detail. We have the benefit of this being a forum where we have access to a lot of expertise in technical detail so feel free to suggest, upload photos, discuss, wish.
Created by Jim Chisholm // 1 thread
We need a front page link to sections about bike maintanace (links to YouTube videos) and tips for novice (or returning riders) Cycle Streets/ Bikeability etc (there were articles about maintence in old newsletters.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Environment and Scrutiny Committee consists of eight councillors who scrutinise the decisions of the Executive Councillor for Communities, Executive Councillor for Climate Change, Environment and City Centre, plus the Executive Councillor for Streets and Open Spaces.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.