S/1610/19/NM Newmarket Road / Wing - Amendment to walking/cycling changes
Non material amendment of outline planning permission S/2682/13/OL
Land North of, NEWMARKET ROAD, CAMBRIDGESHIRE
South Cambridgeshire
Application reference : S/1610/19/NM
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Non material amendment of outline planning permission S/2682/13/OL
Land North of, NEWMARKET ROAD, CAMBRIDGESHIRE
South Cambridgeshire
Application reference : S/1610/19/NM
Created by Alex Raha // 1 thread
Lewisham & Lee Green is changing
A key target of both the Mayor of London and the London Borough of Lewisham’s Transport Strategy is for 80% of all journeys in London to be made by sustainable means of transport (walking, cycling and public transport) by 2041. To achieve this, we have to create street environments where traffic is reduced, and where vulnerable road users, including children and the elderly, feel more comfortable making journeys on foot or by bike.
What are the issues that you would like us to address?
How would you like to change Lewisham & Lee Green to make the area healthier, greener and more pleasant to live in?
The Healthy Neighbourhoods Programme will help make Lewisham’s diverse communities greener, healthier and more attractive places to live, work, play and do business. By restricting the through traffic that uses residential streets to avoid main roads, we will reduce congestion in your neighbourhood, improve air quality and make the local area more pleasant to walk and cycle through.
During the first stage of the programme, local residents will be able to access local traffic data, share their views on traffic issues and help identify schemes to address them, on this website and at a series of public events and workshops.
During the second stage, proposed traffic management measures will be trialled for 6-18 months, so that we can monitor their impact, gather local opinion and assess whether to make any changes permanent
Created by Roxanne (CEO) // 1 thread
The site at Newbury Farm has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
This Land is drawing up outline plans for the development of c. 230 new homes at Newbury Farm, located to the south of Worts’ Causeway and to the north of Babraham Road in Cambridge. The site has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
Created by Al Storer // 1 thread
Marshalls Aerospace are to close Cambridge Airport and relocate. This creates a massive area for new development.
Created by Alex Raha // 1 thread
The Deptford Parks Liveable Neighbourhood (DPLN) project is focused on the area surrounding Folkestone Gardens, Deptford Park and Fordham Park and is funded through the Mayor of London's "Liveable Neighbourhood" programme along with borough and external match-funding. The programme is in line with the Mayor's draft Transport Strategy, which sets out a long-term ambition to transform the Capital's transport network and deliver a fairer, greener, healthier and more prosperous city for all Londoners.
Why?
Deptford’s population is growing fast but currently suffers from significant deprivation, communities cut-off by dangerous roads and railway lines, poor air quality, and childhood obesity. We want to tackle these issues by creating safe places to walk and cycle, reducing the amount of cars on the roads as well as creating attractive places to sit and relax.
What has happened already?
The council worked with park user group Deptford Folk, cycling and walking charity Sustrans, and other local groups on a community street design project for Rolt Street and Folkestone Gardens in Spring 2017. The project culminated in a community led design for the area which reimagines Rolt Street as an extension of Folkestone Gardens providing extra space to sit and relax as well as creating a safer crossing to Woodpecker Walk. You can read more about the Rolt Street community street design project along with a video and proposals by visiting our Reimagining Rolt Street page. These proposals were then incorporated into the wider Deptford Parks Liveable Neighbourhoods project and we will be developing these proposals further as part of the feasibility study.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1340/19/DC&theTabNo=3
Discharge of conditions 32 (footway/cycleway Oakington Road) 33 (widening of existing footway/cycleway Oakington Road), 34 (Widening of existing footway/cycleway Rampton Road) and 35 (Improvements of bus stop) of planning permission S/1606/16/OL for outline planning permission for the erection of up to 126 dwellings, formation of a new vehicular & pedestrian access onto Oakington Road and associated infrastructure and works (All matters reserved apart from access).
Created by jrothwell // 2 threads
The Madison Square Garden Company proposes to build a new entertainment venue, "the MSG Sphere", adjacent to Angel Lane and Montfichet Road in the Olympic Park.
They have proposed a two-way cycle track at pavement level on Montfichet Road past Westfield, and to narrow the carriageway on Angel Lane (removing the current advisory cycle lane.) A small amount of visitor cycle parking is proposed.
In March 2019, the Planning Policy and Decisions Team received a planning application for a large-scale live music and entertainment venue from The Madison Square Garden Company (MSG). The proposal is for a spherical shaped building next to Stratford Station that would provide an auditorium (capacity for up to 21,500 people), a music venue, nightclub, members lounge, restaurants, bars, and new bridges to create pedestrian connections across the site amongst other things.
The building is a first for London because externally the spherical building would be composed of a ‘skin’ of LED’s. These LED’s would be programmable and could display images on the surface of the building including adverts.
Application Documents
A detailed planning application and has been submitted which comprises a number of plans, drawings and documents that can be viewed on our website. An advertisement consent has also been submitted which comprises a number of plans and a design statement which is also available on our website.
Both applications can all be viewed via the Planning Application Register, using the following reference numbers:
- Full Planning Application: 19/00097/FUL
- Advertisement Consent Application: 19/00098/ADV
How can I comment
If you have any comments about the MSG Sphere proposal, please write to the Planning Policy and Decisions Team by Friday 28 June 2019. Comments must be submitted in writing via email or post:
Email: planningenquiries@londonlegacy.co.uk; or
Post: Planning Policy and Decisions Team
London Legacy Development Corporation
Level 10
1 Stratford Place
Montfichet Road
London
E20 1EJ
Public Consultation
The Planning Policy and Decision Team will be hosting a public consultation event where you can share your thoughts and learn more about the proposal and planning application process.
The consultation event will take place on 5 June 2019 (4.00PM – 8.30PM) at: ST PAUL AND ST JAMES CHURCH, 65 MARYLAND RD, E15 1JL (Venue details and directions are available via the following link - https://www.achurchnearyou.com/church/6629/find-us/).
The event will broadly be structured as follows:
- 4.00PM – 6.00PM – Drop-in and talk to a representative of the LLDC planning team
- 6.30PM – 8.30PM – Presentation, Question and Answer session followed by Group Discussions
If you have any questions or special requirements please contact us at: planningenquiries@londonlegacy.co.uk.
Planning Committee
The planning application will be determined by the LLDC Planning Decision Committee, after the Planning Policy Decisions Team have reviewed the submission and all written responses received during the consultation period. No date is currently set and it is considered that the earliest this could take place is Winter 2019. This page will be updated in due course once the date for Committee is known.
Planning Documentation
Various key documents, which provide an overview of the proposal can be viewed and/or download below. Please be aware some of these documents are quite large and may take sometime to open / download on certain computers:
Created by Simon Still // 1 thread
Brixton Liveable Neighbourhood aims to realise the great potential Brixton has for walking and cycling while improving air quality, reducing congestion, supporting local businesses and providing for the growth in jobs and homes planned for the area.
We successfully bid for funding from Transport for London (TfL) to deliver these aims. At the heart of our proposal is transforming Atlantic Road in the town centre, but the ambition goes well beyond this, with proposals to create ‘low traffic neighbourhoods’ in adjacent residential areas that link communities together and ‘healthy routes’ for walking and cycling. Brixton Liveable Neighbourhood is the cornerstone of Lambeth’s Draft Transport Strategy, which seeks to allow people to live healthier lives and create better places for everyone to enjoy.
This is the first stage of consultation, collecting resident and user comments about the area.
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Simon Still // 1 thread
We want your views on our proposals to transform streets in east London linking Hackney and the Isle of Dogs to make it easier and safer for people to cycle and walk. Neighbourhoods including Victoria Park, Mile End and Limehouse would be connected by a new Cycleway, with improvements in each area also proposed for people walking.
Created by Robin Heydon // 2 threads
GCP should be applying for the second Tranche. This was discussed at the May monthly meeting where we created a list of possible schemes. This issue is designed to both create additional items for this list, and also expand on the needs of each of these items.
Created by Hounslow Cycling Campaign // 1 thread
LBH says [edited]:
The London Borough of Hounslow is proposing to make changes to a section of Bath Road, running between the Great West Road (A4) and Vicarage Farm Road, in order to make the road safer for cyclists and pedestrians.
We recently completed the Hounslow West Cycle and Highway Safety Improvements on Bath Road and now propose to extend the cycle route from Vicarage Farm Road junction westwards to the junction with the A4. This proposal is to create a safer cycle lane mostly segregated from motor vehicles and pedestrians ... As well as the proposed cycle measures, this project aims to improve pedestrian safety by introducing raised entry treatments on all side road junctions along the route, enhancing existing pedestrian crossing facilities along this section of Bath Road and adding a Parallel Crossing (pedestrian & cycle) adjacent to Springwell Road. In addition, some changes are proposed to the existing bus stop eastbound, introducing a floating island to avoid conflict with cycle and pedestrian movements. To provide these cycle lanes there will be some localised road widening required on Bath Road and to improve current traffic flows where Bath Road meets the A4 junction. ... Looking beyond this project it is this Council's aim to extend these cycle proposals to link with Hounslow Town Centre.
The A3006 Bath Road is part of the Strategic Road Network within Hounslow and as such is an important and heavily used traffic corridor. The personal injury accident record on this section of road is higher than the borough average with 26 injury accidents over the last five years, five involving pedestrians (including two serious), five involving motor bikes and three involving cyclists.
Martin Lucas-Smith // 1 thread
Cambridge University is planning to refurbish 1 Regent Street for its Cambridge Institute for Sustainability Leadership (CISL).
Currently there are very anti-cycling 'No cycle parking' notices along the railings, which is hardly an example of sustainability leadership.
We should use this as an opportunity to get cycle parking along here.
Created by Paul Allen // 1 thread
There are currently temporary traffic lights around this junction. Work is expected to be finished on the 15th June 2019.
These roadworks are now for the junction improvements that will provide a cycling route to/from the cycle lanes of Royal College Street (North) to/from Prince of Wales Road via castle Street.
Here are links to the proposed infrastructure improvements scheme:
CCC response and Officer's report: http://camdencyclists.org.uk/2018/03/kentish-town-road-rcs-castle-road/
Status info from Camden Council: http://find.camden.gov.uk/streetworks.aspx?area=kentish%20town%20road
The initial works were for Virgin Media presumably preparing for the main changes.
Created by Matthew // 1 thread
Application for approval of all reserved matters (appearance, landscaping, access, layout and scale) for 73 dwellings following outline planning permission S/0388/12/OL .
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1355/19/RM&theTabNo=3
Land south east of the B1050 at Station Road, Parcel H8, Phase 1, Northstowe, Longstanton, Cambs
Change of use from restaurant and associated staff accommodation to bed and breakfast (20no rooms) with Managers flat.
11 Napier Street Cambridge CB1 1HR
Cambridge
Application reference : 18/1520/FUL
Redevelopment of existing bus turning head and redundant service area to provide new hotel and ancillary restaurant (Use Class C1), new public realm (urban park) and landscape improvements together with associated highway works to East Road providing new bus stops, pedestrian and cycle routes.
Grafton Centre Fitzroy Street Cambridge CB1 1PS
Cambridge
Application reference : 19/0512/FUL
Erection of 2no. 2-bed dwellings with associated access, car parking and landscaping following demolition of existing garage.
Land Rear Of 305-307 Milton Road Cambridge Cambridgeshire CB4 1XQ
Cambridge
Application reference : 19/0515/FUL
Created by Jean Dollimore // 1 thread
This consultation gives some new details relating to the design of the westbound cycle track, the junctions and the crossings consulted on in August 2018.
Created by Simon Munk // 1 thread
TfL says:
We want your views on our proposals to transform roads in west London through four connected neighbourhood improvement schemes between Wood Lane and Notting Hill Gate.
The proposals are an important part of the Mayor's Transport Strategy. The proposals are guided by the Mayor's Healthy Streets Approach, which aims to encourage walking, cycling and public transport and make London greener, healthier and more pleasant. The proposals are also an important part of the Mayor's Walking and Cycling Action Plans. These complementary plans set out how we and London boroughs will work to increase the number of people walking and cycling, helping to address poor air quality and congestion, while improving infrastructure to make walking and cycling even easier, safer and more accessible for everyone.
These proposals would provide benefits for road users and communities in these areas, making it easier to cross busy roads, removing through traffic on some residential roads and offering a segregated space for people to cycle in west London. They would form part of London’s emerging cycling network and create a more appealing street environment for everyone to enjoy.
The proposals include:
The proposed changes presented in this consultation are not final. We welcome your views on our proposals and your feedback will inform how we progress the schemes.
Created by Alex Jenkins // 1 thread
From the consultation website:
https://www.pclconsult.co.uk/liveablestreetswapping/
The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.
Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Wapping is one of the schemes in the first phase of the project.
We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Wapping.
Created by Alex Jenkins // 1 thread
From the consultation website:
https://www.pclconsult.co.uk/liveablestreetsbow/
The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.
Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Bow is one of the schemes in the first phase of the project.
We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Bow.
Created by Alex Jenkins // 1 thread
From the consultation website:
https://www.pclconsult.co.uk/liveablestreetsbethnalgreen/
The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.
Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Bethnal Green is one of the schemes in the first phase of the project. Please click on the image to see an enlarged version.
We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Bethnal Green.
Created by Neil Robertson // 1 thread
Having won Liveable Neighbourhood Funding for Greenwich Town Centre, the Royal Borough of Greenwich are starting to create more detailed plans.
Following the pre-Consultation which resulted in a high percentage of responses for the reduction in motor traffic, the council are planning to design the changes in liaison with local groups.
The expectation is that the gyratory will be removed in favour of a simple 2 way road East to West.
The concept sketches suggest the other half of the gyratory to be a footpath and cycle route to be ready for when the CS4 extension is planned. The road section would have 3 sets of traffic lights controlling the three main junctions.
Access to and from Greenwich Park will be high priority, especially as it seems to be confirmed as part of Quietway 1 (daytime only).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.