'Quick Win' cycling permeability improvements in Westminster
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Dominic Fee // 1 thread
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
Created by Jon Warbrick // 1 thread
Cambridgeshire Insight have just released data from a set of 'smart' traffic sensors installed to monitor the effect of the Mill Road bridge closure: https://data.cambridgeshireinsight.org.uk/story/monitoring-impact-mill-road-bridge-closure
This data is particularly interesting because it provides classified counts of pedestrians, cyclists and various classes of motor vehicle in both directions across 15 locations in Cambridge.
Conversion and extension of 3 bed detached dwelling into 2 x 2-bed and 3 x 1-bed apartments including a part 3 storey, part 2 storey and part single storey rear extension incorporating balconies on 1st and 2nd floor, extension to roof from hip to gable, conversion of garage to living space and associated alterations. Erection of bin and cycle storage in front garden.
25A Mowbray Road Cambridge CB1 7SR
Cambridge
Application reference : 19/0698/FUL
Anon // 1 thread
Overview
We want to hear your views on the planned controlled parking zone for the Rotherhithe and Surrey Docks area.
Up to 3,000 new homes in the area mean that a controlled parking zone is essential - in particular, this is the only way to enforce the permit-free planning conditions for the Canada Water development, and prevent intolerable additional parking pressures.
Anon // 1 thread
We are consulting on creating two way streets in the Lower Road area and Cycleway 4.
The existing road layout creates a sense of motor-vehicle dominance, one way streets encourage fast vehicle speeds, which adds to unpleasant conditions for both pedestrians and cyclists.
Anon // 1 thread
Overview
We are consulting on creating a cycleway in the Rotherhithe area.
Future cycling demand is predicting there will be a significant desire to\from Peckham and beyond, with up to 150 cyclists using the route during the peak period, in the event of a free ferry crossing being developed.
We have developed proposals to link Cycleway 4 and Quietway 14 as a first phase and we are exploring potential connections towards Peckham.
Anon // 1 thread
Transport for London has awarded Southwark funding to improve streets in South Bermondsey to make this a more “Liveable Neighbourhood”. The council wants to hear your ideas on how to spend £30,000 this year to improve the look and feel of your streets and make it easier to walk and cycle.
Improvements could include new crossing points and other safety features, new green spaces, cycle routes or cycle parking.
The council also plans to bid for more money for the next year three years to provide more street improvements and to make this area even more pleasant and healthy for you and your family.
Created by John Chamberlain // 1 thread
From late July till end November, Robert Street will be closed between Stanhope Street and Hampstead Road for HS2 related water main replacement. All traffic including cycles will be diverted.
Update October 2019: Works extended to end of year.
Created by FrenchyF // 1 thread
It can take up to 5 minutes to cross from the east side of Little France Drive to the west side of ODR, as there are four stages of pedestrian crossings.
Created by Simon Still // 1 thread
In the last three years, there were 61 collisions, with 71 casualties, 19 of which were people cycling and eight of which involved pedestrians. (Data available up until the end of November 2018).
The scheme aims to address identified and perceived safety concerns at these junctions, as well as at George’s Road and the turning into the petrol filling station south of Palmer Place. The scheme will introduce new, signalised pedestrian crossings at the Drayton Park/Palmer Place junction, replace the zebra crossing at the junction of Liverpool Road with a signalised crossing and simplify all the existing staggered crossings to straight across crossings at the Hornsey Road/Hornsey Street junction.
We consulted on a proposal that sought to deliver signalised pedestrian crossings at Drayton Park/Palmer Place and Liverpool Road in 2010. This was not taken ahead because of concerns raised during the consultation about the impact of the scheme on local roads arising from proposed banned turns. This consultation was also launched shortly after the recently opened Emirates stadium, the effects of which were felt to have an impact on the response to the consultation. When developing our new proposal we took this feedback into account and have now amended the scheme to address these concerns. The details can be found below.
Our proposals
We would like your views on the following proposals which aim to provide new signalised crossings and address identified safety concerns.
We propose to provide new, signalised pedestrian crossings at the Holloway Road/Palmer Place/Drayton Park junction and the Holloway Road/Liverpool Road junction. The existing signalised pedestrian crossing outside the London Metropolitan University Clocktower building would move south and be brought into the new junction.
We propose to simplify the Holloway Road/Hornsey Street/Hornsey Road junction. We would convert the existing staggered signalised pedestrian crossings to straight across crossings. We also propose to remove the small triangular pedestrian island and slip road into Hornsey Road to create more space for people walking, reduce the crossing distance and simplify traffic movements.
To allow for the proposed crossing changes to be introduced, changes to some bus stops, loading bays and parking locations between Hornsey Street/Hornsey Road and Ronalds Road would be required.
To provide the new crossings, we propose to make changes to some permitted turning arrangements for traffic at the Drayton Park/Palmer Place and Liverpool Road junctions. All movements through the area would still be possible in the new road layout, but it might be necessary for road users to take a different route. These changes are necessary to allow the crossings to be delivered without displacing traffic on to local roads.
In detail:
We need to remove two trees to ensure the new signals at Liverpool Road are visible to drivers. We have identified locations to plant new trees elsewhere within the scheme extents, subject to ground conditions.
We propose to change the traffic signals at the Drayton Park/Palmer Place junction so that the side roads run separately to reduce the risk of conflict between road users at this junction.
To provide the new pedestrian crossings at the Drayton Park/Palmer Place junction and on Liverpool Road, all the junctions in the scheme must be addressed together. This is to ensure the road network operates effectively in this area for all users.
Traffic modelling
Our traffic modelling data shows that the overall effect of our proposals on buses is generally neutral. The majority of bus routes will experience a change in journey time of between 0 and 30 seconds, however there are also some considerable improvements, of up to 5 minutes, expected for buses using Liverpool Road in both directions, particularly during the PM peak. There is an overall small impact on northbound general traffic, with improved journey times for southbound general traffic. These impacts result from the need to balance the network for all vehicular modes affected by the proposals.
Bus service changes
As a result of changes to the turning movements at the junction of Palmer Place to Holloway Road, we are also proposing to reroute the 153 bus route in a northbound direction from Palmer Place on to Liverpool Road. This is required because of the changes at the Palmer Place junction but is also expected to increase reliability and simplicity for passengers.
Cycleway consultation
The London Borough of Islington, in partnership with Transport for London, are also currently consulting on a new Cycleway adjacent to this scheme. The new Cycleway will connect Finsbury Park and Highbury Fields, where the improved route will help cyclists cross Holloway Road at the existing cycle crossing at Fieldway Crescent. More details are available at: www.islington.gov.uk/highburycycleway.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by Matthew // 1 thread
The central portion of Hills Road seems to be a kind of 'forgotten' area, with nothing more than narrow mandatory cycle lanes in miserable shape, and terrible junction design for people walking and cycling.
If GCP is looking for an area that needs improvement, this is one that needs doing, and it is fairly central and high-profile.
Created by David Lincoln // 1 thread
Compton Street (from Agdon Street to Goswell Road) and Cyrus Street - School Street Scheme
St. Peter & St. Paul Catholic Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around St. Peter & St. Paul Catholic Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Compton Street and Cyrus Street?
The proposal is to trial a temporary road closure on Compton Street (from Agdon Street to Goswell Road) and Cyrus Street into a School Street Scheme between 8.30am to 9.15am plus 2.45pm to 3.45pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Moreland Street, Pickard Street and Gard Street - School Street Scheme Moreland Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Moreland Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Moreland Street, Pickard Street and Gard Street?
The proposal is to trial a temporary road closure on Moreland Street, Pickard Street and Gard Street between 8.30am to 9.15am plus 3.00pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Noel Road (from Danbury Street to St Peter’s Street) - School Street Scheme
Hanover Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Hanover
Primary School and create a safer, more pleasant environment for everyone. The Council would like to
hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and
cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools
this will help to reduce congestion and pollution at the school gates as well as make it easier and safer
for children to get to and from school.
What is proposed for Noel Road?
The proposal is to trial a temporary road closure on Noel Road (from Danbury Street to St Peter’s
Street) between 8.30am to 9.15am plus 3.15pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an
exemption. Residents and businesses who live and work on a school street will be able to register for
an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at
weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered
vehicles entering the street during the times of operation may be identified by camera and issued a
penalty charge notice.
Hanover Primary School is being looked at as part of the wider School Street Scheme Programme
across the borough. An 18 month trial is proposed. The Council will be working with the school and local
community to develop the scheme.
Change of use from 8 bedroom guest house (Use C1) to 9 bedroom guest house (Use C1) and associated refurbishment works including:- installation of roof lights, replacement canopy, installation of railings and dwarf wall to front elevation and cycling parking.
4 Huntingdon Road Cambridge CB3 0HH
Cambridge
Application reference : 19/0830/FUL
Created by Anoop // 1 thread
Minor roads in Kenton such as Kingshill Avenue are used inappropriately by through traffic. This is a consultation on options to reduce through motor traffic whilst maintaining access for walking and cycling
Created by M Stanley // 1 thread
Leeds city council are proposing to reduce the speed limit from 60mph to 40mph
Created by Marcus Howarth // 1 thread
Doing a quick scan of the document see some enoughing comments on segregated cycleway in high st, parking and a cycle networks.
Unfortunately skip to the table at the end and it seems to be Medium to Long term objectives so real actions lacking.
see p53 Guideline SS4: The Northern Side of the High Street
Any redevelopment should take the opportunity to create a
segregated cycle path parallel to the High Street.
p61
7.29 Assisting a shift to more sustainable modes of transport would also be
beneficial. Expanding the cycle network to create a segregated cycle way and
increasing the pedestrian access and wayfinding for pedestrians to and from
the High Street and Grove Park would also be welcome by-products, should a
comprehensive redevelopment of the north side of the High Street take place.
Guideline G9: Traffic and Transport
The council will seek to improve the cycling network and pedestrian
network throughout the Conservation Area as opportunities arise.
Temporary highway works on the northern side of Newmarket Road for a period of up to five years.
Land north of, NEWMARKET ROAD, Cambridge
South Cambridgeshire
Application reference : S/1605/19/FL
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Kate Ravilious // 1 thread
Car parking obstructs cyclists travelling uphill, forcing them to stop and start on a steep uphill section, or move into the path of oncoming traffic travelling downhill.
It would be safer to have car parking on the other side of the road.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Kate Ravilious // 0 threads
Like Fossgate, High Petergate needs to be made two-way for cyclists. Otherwise cyclists travelling north are forced to either get off and walk (not an option for disabled cyclists) or join the busy St Leonard's place via a difficult junction.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Roxanne (CEO) // 25 threads
Camcycle is launching the first ever 'Cambridge Festival of Cycling' which we plan to grow into a recurring festival in September each year.
Along with a range of events, we also plan to conduct a month long Cambridge Cycling Survey.
The aims of the festival:
- Increase awareness of Camcycle leading to more members, volunteers and influence, particularly among new audiences
- Encourage more, better and safer cycling, for all ages and abilities
- Increase our income thorough sponsorship opportunities
- Increase engagement with our campaigning activities
- Create relationships with other community groups who can partner with us on festival events.
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by SallyEva // 2 threads
Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.
Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.
Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Jean Dollimore // 1 thread
Hawley Road (+ southern end of Castlehaven Road) runs one way eastbound and is on the north side of a small clockwise gyratory on Kentish Town Road, Hawley Crescent and Camden High Street. Hawley Road is just to the north of Regents’ Canal.
The Camden Lock area has recently been redeveloped to provide a new school for Hawley Primary as well as housing. During this development the southern footway and adjacent parking places were closed.
The scheme under consultation tidies up and widens the southern footway and permanently removes the former parking places.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by linus // 1 thread
Westminster council are doing two important things at the moment. There is a consultation on "Oxford Street District" here: https://osd.london
The other thing WCC are doing is going to close Riding House Street with the Camden boundary at the junction of Cleveland Street by installing bollards across the road. The street has already been closed for over a year and it has had no negative impact. Camden have already done this at Fitzroy Square and Warren Street and it has been very positive. We need to do more of the same.
The issue of through traffic -- including Torrington Place -- needs to be dealt with as a matter of urgency. All areas of Fitzrovia are above the legal limit for NO2, except for Crabtree Fields open space. (Sample readings: 55 µg/m3 - legal limit is 40 µg/m3. NO2 pollution on Oxford Street east is 66 µg/m3 & on Euston Road it is 84 µg/m3.)
Camden has so far refused to entertain the two road closures I have suggested - Torrington Place and Goodge Place.
I am now going to suggest the following road closures to Camden and Westminster to make Fitzrovia "access only".
Close Goodge Street at Westminster boundary at junction with Goodge Place; close New Cavendish Street at the junction with Cleveland Street, and finally close Clipstone Street at the junction with Cleveland Street (this would also require Cleveland Street to be one-way north bound).
I believe it will not impact on access to all streets by motor vehicles for deliveries and drop-offs, etc. But it will eliminate entirely motor through traffic across the Camden/Westminster border and mitigate the effect of Gower Street northbound traffic turning into Torrington Place. This would also cut down on traffic along Grafton Way which also a victim of WEP.
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by Lewisham Cyclists // 1 thread
Overview
The Mayor of London’s aim for 2041 is for 80% of all trips in London to be made on foot, by cycle or using public transport.
LB Lewisham is working on initiatives to help reach this target by gearing towards a “Healthy Streets” approach as set out in the Mayor’s Transport Strategy (2017) which encourage people to use their car less. This will help reduce the amount of dirty air in London, encourage active travel and tackle congestion on our already clogged up roads.
(for more information on the Mayor’s Transport Strategy and the Healthy streets approach follow the link below)
Mayor of London's Transport Strategy
As part of the Healthy Streets approach the borough is working on building a comprehensive “Quietway Network” so residents can choose cycling and walking as a convenient transport choice.
This consultation is seeking comment on proposals to upgrade the existing cycle route that runs through Blackheath Common as part of the TfL funded Quietway programme to encourage more people to walk and cycle. The proposals include three new crossings over:
All feedback from the consultation will be used to inform the final proposals ahead of construction works in Spring 2019. These improvements will form part of an extension of Quietway Route 1 which currently connects Waterloo and Greenwich
Created by Charles Martin // 1 thread
Created by Hounslow Cycling Campaign // 1 thread
https://consultations.tfl.gov.uk/roads/kew-duke/
Overview
We consulted on our proposals for Cycle Superhighway 9 in autumn 2017. The route is an important part of the Mayor’s Healthy Streets Approach, which aims to make London greener, healthier and more pleasant through encouraging walking, cycling and the use of public transport.
We have published an analysis of the responses and our response to the issues raised here. The feedback we received was valuable in helping us to further improve the scheme.
In response to feedback received through the consultation, we are now carrying out a further consultation on two parts of the route:
We would like to hear your views on these further proposals. A map of the areas where we are carrying out further consultation can be found below.
Kew Bridge and Duke Road overview map (PDF 989KB)
Other than the two sections identified for further consultation, we will be progressing our plans for the route as outlined in the Response to Issues Raised report. No further consultation is planned on the proposals for the route except for the two parts of the route above. We will carry out local engagement on the rest of our proposals later in the process. We are intending to proceed with our proposals subject to formal approvals.
Following feedback from respondents and the Mayor’s announcement of a new brand for London’s growing network of high-quality cycle routes in the Mayor’s Transport Strategy, this route will no longer be called a Cycle Superhighway. We will work closely with our borough partners on the most appropriate wayfinding for this scheme.
Kew Bridge and Kew Bridge Road (High Street Brentford to Wellesley Road)
The main change we are proposing is to provide a segregated two-way cycle track on the south side of Kew Bridge Road and South Circular Road. Previously we proposed with-flow segregated cycle tracks and a bus lane on Kew Bridge Road, the South Circular and also between Wellesley Road and High Street Brentford (including Kew Bridge junction).
This change provides full segregation for cyclists throughout this section and removes the requirement for two bus stop bypasses we proposed on the north side of Kew Bridge Road. The change also addresses concerns raised about cycle safety at Kew Bridge junction, Green Dragon Lane and Lionel Road South.
We are also proposing a second southbound traffic lane on Kew Bridge to make the junction operate more effectively and to maintain bus journey times in the area.
In summary, our proposals for this section of the route include:
A map of the proposals for Kew Bridge and Kew Bridge Road to Wellesley Road can be found below.
Kew Bridge and Kew Bridge Road proposals map (PDF 2.35MB)
Appendix A - detailed information on these proposals (PDF 237KB)
The original proposals for this section can be found here
Duke Road and Duke’s Avenue’s junction with Chiswick High Road
The main change we are proposing is to ban the right turn out of Duke Road onto Chiswick High Road for all traffic (except cyclists) in response to safety concerns. Traffic would be able to use Annandale Road to exit east onto Chiswick High Road instead. We previously proposed to reduce Annandale Road from two lanes to one at its junction with Chiswick High Road. We are now proposing to keep two lanes on exit at this junction to facilitate traffic that may be redirected from Duke Road.
We are also proposing to maximise pavement space outside Our Lady of Grace and St Edward Church, in response to local concerns. This will require the reduction of eastbound traffic lanes on Chiswick High Road from two to one.
We proposed four additional pay and display bays on the west side of Duke’s Avenue. Following feedback from the consultation and our discussions with Our Lady of Grace and St Edward Church we are no longer proposing these bays and will instead retain the existing single yellow line as this will provide more opportunity for parking for Church services. Additionally, one proposed space on the eastern side of Duke Road opposite Bourne Place has been removed to ensure vehicles can exit this junction.
In summary, our proposals for this section of the route include:
The segregated two-way cycle track on the southern side of Chiswick High Road has been retained.
A map of the proposals for Duke Road and Duke’s Avenue junction with Chiswick High Road can be found below.
Duke Road and Duke's Avenue proposals map (PDF 968 KB)
Appendix B - detailed information on these proposals (PDF 241KB)
The original proposals for this section can be found here
How would the proposals affect journey times?
We have carried out detailed traffic modelling on the proposals to understand how our proposals might affect journey times for general traffic, buses, cyclists and pedestrians.
Despite the sophistication of our traffic models, all traffic modelling is only ever indicative; it is intended to give an idea of where the impacts of changes in journeys are most likely to be felt. It assumes that drivers have perfect knowledge of the network and will always choose the quickest route available
We have undertaken traffic modelling on the proposed changes to the scheme, which has indicated the following:
Kew Bridge section
This section has undergone extensive design changes following feedback from the previous consultation, including concerns about the impact on journey times through the junction. The new design changes the ‘with flow’ cycle track into a bi-directional cycle track and provides additional capacity north and southbound on Kew Bridge. As a result, three approaches to the junction will have either an increase in green signal time or an increase in lane capacity, which leads to improved journey times on bus routes 237 and 391 in both directions and bus route 65 east bound compared to the previous designs. One approach to the junction will see a reduction in green signal time which as a consequence, has a minor negative impact on journey times for the 65 westbound bus route.
Duke’s Avenue section
The design changes at this location have been made to protect trees and retain footway space outside Our Lady of Grace and St Edward Church. There is no longer a right turn lane, but there is space in front of the stop line for up to two right turning vehicles without blocking vehicles travelling east, including buses. As the predicted traffic volumes are low, this junction is expected to operate effectively and the design change is predicted to have minimal impact on overall bus and traffic journey times.
Detailed results of our traffic modelling can be found below.
Traffic modelling results AM (PDF 186KB)
Traffic modelling results PM (PDF 185KB)
Equalities
We are subject to the general public sector equality duty set out in section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics.
Our autumn 2017 consultation set out how we had due regard to the duty and can be found here.
We have updated our Equality Impact Assessment (EqIA) for the proposed changes. The EQIA completed for this scheme shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme proposes a number of improvements to pedestrian facilities including enhanced crossing facilities, increased pavement widths and new pedestrian crossings.
Some negative impacts have been identified where pavements are proposed to be cut back or shared use is proposed, however we have ensured that they are appropriate for number of pedestrians in the area and that they allow two wheelchair users to pass safely. Shared use areas would be provided only where there is sufficient space for pedestrian and cyclists. Some negative impacts have also been identified where we are proposing to install bus stop bypasses. We recently agreed therefore to include zebra crossings at all bus stop bypasses. The crossings would have tactile paving and would be raised to footway level to create a flush surface.
Public drop-in events and have your say
We will be holding public drop-in events at which staff involved in the project will be available to answer your questions:
You can let us know your views on these proposals by taking part in our online survey below.
Have your say
We would like to know what you think about our proposals.
Please give us your views by completing the online survey below by Tuesday 26 February 2019.
Alternatively, you can:
You can also request paper copies of all the consultation materials and a response form by emailing consultations@tfl.gov.uk, or writing to FREEPOST TFL CONSULTATIONS.
Have your say
Created by Simon Munk // 2 threads
This 7.5km route would stretch from Hackney to the Isle of Dogs via Westferry, Mile End and Victoria Park. It would connect with the cycle routes between Stratford and Aldgate and Barking to Tower Hill, as well as the proposed Rotherhithe to Canary Wharf crossing. There are currently two options in Hackney we want your views on.