Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
Berechurch Hall Road Speed Limits
Berechurch Hall Road is a busy road that is becoming increasingly residential West of the junction with Berechurch Road (J1). The speed limit has been reduced from 40mph to 30mph, except for a section of 40mph East of J1.
To improve safety for pedestrians, cyclists, and motorists, the current speed limits should be reduced by 10mph (Fig 4.1) and traffic lanes correspondingly narrowed (7.2.5-7).
-
Camulodunum Way - Baronswood Way Missing Link
The sub-LTN 1/20 white line (6.5.2-3) segregated bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) and Baronswood Way (BW) are not connected, leaving unconfident cyclists travelling North/South along CW via the toucan crossing from the new development 202025 unable to continue North to the Town Centre, as advertised in planning documents.
The gap could be easily filled to the existing standard on CW/BW via footway conversion.
-
Highgate Road Safe and Healthy Streets
Camden is consulting on making permanent the trial scheme put in during summer 2020:
- Extension of hours of operation to 24/7 – “at all times” for the following bus lanes on Highgate Road:
- the southbound bus lane CMO15 which runs from St Albans Road to Dartmouth Park Road,
- the northbound bus lane CMO16 which runs from Carrol Close (97 Highgate Road) to Wesleyan Place,
- and the southbound bus lane CMO17 which runs from Burghley Road to Fortess Road .
- Waiting and loading restrictions extended to ‘at any time’ in all bus lanes.
- Addition of two loading bays outside 109-111 Highgate Road in CMO16 and outside 12 Highgate Road in CMO17 with hours of operation of 7pm-7am for loading for commercial properties.
They also propose the following new measures
- the extension of the existing southbound bus lane “CMO15” to the north, up to the roundabout with Swains Lane
- the removal of paid-for/permit parking bays along Highgate Road to remove existing pinch points and facilitate the extension of the bus lane (10 outside the tennis courts and 18 opposite Grove Terrace).
- the introduction of ‘at any time’ waiting and loading restrictions at the junction of Highgate Road and Carrol Close, to improve road user and pedestrian safety
-
21/04425/FUL: Change of use to 9 bed large HMO. 49 College Fields
Change of use from a small HMO (use class C4) to a 9 bed large house in multiple occupation (use class sui generis).
49 College Fields Cambridge Cambridgeshire CB4 1YZ
Cambridge
Application reference : 21/04425/FUL
-
Walking and cycling in and around Huntingdon
A new thread to highlight issues in and around Huntingdon which we may wish to engage with / support our partners with.
-
PA_212689_22ValDrive
Outline application for erection of 3 bedroom two storey house on garden of 22 Valentines Drive.
-
PA_212657_25Creffield
Retrospecitve application for garden fence and cycle/bin store
-
PA_212540_BlueOwlGtHorks
Part change of use from retail to domestic, with proposed gates and post and rail fence to front of car park. Erection of car barn to rearof site.
-
Millfield Lane Safe and Healthy Streets
In June 2020, a No Entry (with cycle exception) was placed on Millfield Lane just south of the junction of Merton Lane, making the southern section one way northbound for motor vehicles. In addition, several parking spaces were removed at the bend to provide more space for walking. This was done with an experimental traffic order and Camden is now consulting on making the changes permanent and building a proper footway at the widened section.
Extras
Camden also proposes:
- to convert 11 extra parking bays on Millfield Lane to double yellow lines and double kerb blips to improve visibility, reduce conflict between drivers and cyclists and to minimise vehicle movements which are hazardous to pedestrians.
- and to remove parking on Merton Lane close to the junction with West Hill
- and to remove parking at the junction of Merton Lane and Millfield Lane and widen the footway
They also ask whether we would like to have Merton Lane one-way for motor vehicles (eastbound only)
-
PA_212507_WyvernFrm600
Outline Planning Application (with all matters reserved except access) for the erection of up to 600 dwellings, land for a co-located2FE primary school and early years nursery, public open space and associate infrastructure. Vehicular access from Londo
-
O/COL/01/1624_SeverallsHosp
Residential development (approximately 1500 dwellings including conversion of some retained hospital buildings) mixed uses, including community facilities, employment and retail, public open space, landscaping, new highways, transport improvements, reserved route of the Northern Approach Road Phase 3 (NAR3), and associated development.
-
PA_212506_ChesterwellDayNursery
Mixed use development comprising nursery at ground floor level and residential units at first floor with associated parking and landscaping as a part of Neighbourhood Centre NC2
-
PA_212490_Copford6Hses
Construction of 6 new residential homes with associated landscaping and parking
-
PA_212479_MTroofconv
Conversion of existing roof space of Block A2 to create 1no. 1bed flat with 25sqm private terrace, together with allocation of 1no. car parking spaces (AMENDED DESCRIPTION)
-
PA_212473_63HighSt
Listed building: Proposed Change of Use from accommodation ancillary to the existing Gaming Centre (Sui Generis) to C3 (residential dwelling) on existing 2nd floor. Listed Building Consent for minor alterations to facilitate the change of use.
-
21/04350/FUL: change of use to 11no flats, 620-622 Chartwell House, Newmarket Rd
Change of use from B1(a) (offices) to Class C3 (11no flats) with changes to external elevations including new balcony structure and dormer windows
620-622 Chartwell House Newmarket Road Cambridge CB5 8LP
Cambridge
Application reference : 21/04350/FUL
-
Active Travel in Fenland
Camcycle would like to support communities across the county as part of our strategy to influence decision-making at a regional level and our campaign for Zero Carbon Streets in Cambridgeshire which aims to empower local groups to work for better walking and cycling in their areas. Fenland has historically been badly served in terms of active travel investment and is an important district in which to support improvements.
-
21/04260/FUL Change of use of a vacant office to Hostel
Change of use of a vacant office (Class E, previously Class B1) to Hostel (Sui generis) and use of the roof space as external amenity space.
49 Sidney Street (First And Second Floor) Cambridge Cambridgeshire CB2 3JF
Cambridge
Application reference : 21/04260/FUL
-
Brook Street
Suggestions to reduce traffic (via restricting southbound traffic) and potentially add cycling infrastructure on Brook street.
See google document.
-
Guided busway hazard
Sunday 26th of September 10.15pm I was cycling from Cambridge North to Histon. I collided with a fence immediately after exiting the A14 tunnel and sustained a dislocated shoulder along with other injuries.
There is definitely a hazard here because
1) the busway and tunnel from Cambridge North are brightly lit. The busway after the tunnel towards Histon is unlit.
2) about 30m after the tunnel the width of the busway tarmac surface suddenly reduces due to the introduction of the gravel strip (approx 1m wide). There is also a fence near the start of the gravel strip (I assume for the small animal tunnel)..
I cycled through the tunnel and noticed a cyclist coming in the opposite direction (without lights), so I took avoiding action by moving to the left. I may have then glanced at my mobile phone on my handlebars. When I looked up I saw the fence in my headlight. I then hit or clipped the fence.
-
PA_212385_78NSR
Change of Use from Class D1 (New Ee) Health Clinic previously trading as The Physiotherapy Practice to Class C3(a) Dwelling House.
-
PA_212451_56MilRd
New studio dwelling
-
21/04212/FUL: 3 no. self-contained flats, 21 Sandy Lane
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
-
21/04190/FUL: 3 dwellings, land adj. to 25 Rawlyn Road
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Concrete obstruction at Calverley Bridge
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
-
Poor lane marking eastbound at Park and Ride on Madingley Road
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
-
Nottm City Council Review of barriers on rights of way
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NGTele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway -
Low hanging tree branch on Hatch Warren Way cycle path (NCN23)
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
-
London Cycle Network access via Westcoombe Avenue
Access for cyclists, pedestrians with buggies or wheelchairs is poor here. Pavement is not flush to carriageway, barriers effectively block access & there are oftern cars parked too. As a part of the 'London Cycle Network' (74) it is substandard. If the route is intended for cyclists, it should be made accessible to them. Other users (car drivers) should be prevented from blocking it.
In addition, there is a 'cyclists dismount' sign!
-
Stanboroughbury - link to new housing
Stanbroughbury is the new housing area proposed by Gascoyne-Cecil Estates (Hatfield House) in the area north of Hatfield Garden Village. The suggested route above would pass through the housing.
The route would directly link the new housing to Hatfield Station via a cycling and walking route of about a mile. To achieve this requires a new bridge over the A1(M) and Comet Way and makes use of the handy gap in the housing into the Birchwood estate at this point. As the alternatives for cars are a longer way round via Wellfield Road or via Stanborough, this new route would give waling and cycling a time advantage which would therefore incentivise use.
The route assumes a second entrance to Hatfield station at the north end of platforms 2/3 either onto Beaconsfield Road or St Albans Road East. This will be needed anyway as demand at the station increases. Opening this second entrance will also encourage walking to and from the north and west of Hatfield as it will shorten walking times quite considerably. This second entrance should be for walking and cycling only.
-
16/0673/FUL Cambridge Union Society redevelopment
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
-
Missing link on Malden Road
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
-
Boston Manor Road cycleway
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
-
Lack of cycle parking at Curve
There's a lack of cycle parking here
-
Poor drainage Harmston Rise
Harmston Rise.
Inadequate drainage.Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.
-
Highams Park Town Centre Mini-Holland consultation
From the commonplace introduction:
"Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
The Highams Park Town Centre scheme area has over 6,500 addresses and includes the area framed by North Circular Road, Hatch Lane, Woodford New Road and other minor roads. We want to make it easier for you to walk and cycle local journeys should you choose to. We also want to improve the look and feel of the area, making it an even more enjoyable place, boosting business and giving residents a sense of pride in their community."
-
Pyotts Hill NCN23 - plan to open Lond lane to motor traffic
Planning application 15/02303/FUL is to make Long lane open to motor vehicles so that they can reach 10 new houses on Pyotts Hill House.
This will be debated at 6.30pm on Wednesday 10 August at the Civic Offices Basingstoke.
Cycle Basingstoke has already objected because the road along Long lane is only 3metres wide and pedestrians, cyclists, lorries and cars will have to share this space.
There is good access from Lily Mill Chine -
Petition to signalise Golden Pot junction
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
-
St. Michael's Retail Park proposed on Smiths Industries site (ex-Tesco)
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
-
Suggestions on How Exeter's E3 Route Might Be Improved
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved. -
Planning application : 16/02767/ENSC ... erection of a motorway service area
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSChttp://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
-
Consultation on Tavistock/Torrington Place Cycle Route
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
-
Join Mill Road to College St bike route
There is now a nice cycle path that takes you from the river away from Devorgilla bridge, but there is no easy way to go from there to the College Street cycle track or Terregles Street as both Market Square and Howgate Street are one-way going the other way. Adding an 'except cycles' sign and allowing contraflow cycling along Market Square (which is not a fast or busy road), combined with a crossing across Buccleuch St on the east side of the street would provide an alternative route through town when the Whitesands is closed (or the Loreburn Bridge). At the moment, to get across Buccleuch street you have to cross in three cycles of the light and there are railings preventing pedestrian and bike access to College Street. This would also benefit pedestrians.
-
Dropped kerb at South Avenue
At the bottom of South Avenue, the road turns into a short cycle track. There is no dropped kerb.
-
Whiston Road
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie -
Kingston to New Malden Mini-Holland route
Kingston Council have opened the consultation on this route, open until 17th November
-
Kingston to Kingston vale Mini-Holland route
Kingston Council have opened the Consultation on this route, open until 17th November
-
Kingston to Tolworth Mini-Holland route (Penrhyn Rd to Surbiton)
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
-
Kingston to Tolworth Mini-Holland route (Ewell Rd to Tolworth)
Kingston Council have opened the Consultation on this route, it also includes Penrhyn Rd & Surbiton Rd. Open until 17th November.