Hospital Rd - Southway ramp
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
Created by Steven Moseley // 1 thread
"Linking the A120 and A133 with a new road will unlock land to provide housing and business space, improving connectivity locally and within the wider region. It will serve a new Park and Choose site and manage traffic congestion going to Colchester Town Centre, the University of Essex and its Knowledge Gateway Technology and Research Park.
A Rapid Transit System that will prioritise public transport on a key route through Colchester. It will enable housing and business growth, allowing new and existing residents to benefit from frequent, high-quality, reliable transport connecting to the key destinations within the town. These types of system have proved successful in other towns and cities, helping create a shift away from car travel. A recently implemented example of this is the Belfast Rapid Transit Glider.
The system will service a new Park and Choose site on the proposed new community east of Colchester and help to better connect future growth areas with the rest of the town."
Created by Steven Moseley // 2 threads
"Braintree, Colchester and Tendring Councils along with Essex County Council joined together to put forward plans for three new settlements built to Garden City Principles.
The three sites based west of Braintree, on the Braintree / Colchester border and on the Colchester / Tendring border could deliver up to 43,000 new homes along the North Essex A120 corridor with significant employment opportunities and transformational new infrastructure over the next 50 years."
In May 2020 the planning inspector found the other two proposed settlements to be unsound, leaving East of Colchester as the only one of the three that could proceed.
Created by Shaun McDonald // 1 thread
Erection of multi-storey car park and ancillary buildings; Creation of access road and paved external spaces; Re-location of site access onto Friars Bridge Road. Outline application to consider access, scale and layout only (landscaping and appearance as reserved matters).
Portman Road C Car Park Portman Road Ipswich Suffolk
Ipswich
Application reference : 20/00398/OUTI3
Created by John Chamberlain // 1 thread
Road Closure on Howland Street every weekend in June
rskedgell // 0 threads
The section of Leytonstone Road E15 between number 165 and Cherry Tree Road had a single yellow line waiting restrictions, loading restriction kerb markings and bollards until 2017-18 when the road was resurfaced. A new advisory cycle lane was introduced, but the yellow lines and kerb markings were not reinstated, although I can find no evidence that the traffic order has been revoked. Footway parking has since become a serious problem here, both narrowing the available width of the footway and obstructing the cycle lane. The single yellow line and kerb markings need to be reinstated. As CEOs seem unable to enforce the footway parking, consideration should also be given to converting the cycle lane to a mandatory lane, which would enable CCTV to be used to issue PCNs by post from 22 June 2020 (there is a Newham CCTV camera at the corner of Leytonstone Road and Gurney Road).
Created by Roxanne (CEO) // 1 thread
Collection of advice for people who cycle or are thinking about cycling.
Installation of an internally illuminated Digital Interactive Wayfinding Totem displaying walking routes and cycle, bus and train information, replacing existing real time bus information sign.
Cambridge Railway Station Station Road Cambridge Cambridgeshire CB1 2JW
Cambridge
Application reference : 20/01850/ADV
20/02171/OUT | Outline planning application for the development of Northstowe Phase 3A for up to 4,000 homes, two primary schools, a local centre (including employment, community, retail and associated services, food and drink, community, leisure, residential uses and other accommodation), secondary mixed use zones (including employment, community, retail and associated services, food and drink, community, leisure, residential uses), open space and landscaped areas, sports pitches, associated engineering and infrastructure works, including the retention of the existing military lake and creation of a new lake, with details of appearance, landscaping, layout, scale and access reserved. Application is accompanied by an Environmental Statement and involves works to/affecting existing Public Rights of Way. | Northstowe Phase 3A Rampton Road Longstanton Cambs
Created by Tim Burford // 2 threads
Cambridgeshire County Council has removed the cycle lane markings on Shelford Rd, apparently as part of their response to Covid-19 - but the roadside signs are still in place. Who knows what the plan is?
Photos on Cyclestreets at #124215 to 124265 (only 7 photos, but the numbering seems to have gone mad).
Created by Edward Taylor // 1 thread
Brief proposal for temporary measures in Milton.
Raised as a result of COVID-19 distancing measures
In addition to or in concert with suggestions arising from Spaces to Breathe
1. Use a point closure at the north side of Cambridge to forbid southbound through traffic. Why? It eliminates through traffic in Milton, especially at peak times. There are other versions of this idea for Milton, such as modal filters. Driving into Milton centre should be further discouraged in favour of the A10 bypass.
2. Implement a 20mph speed limit throughout Milton. Why? Reducing speed limits slows down drivers, a bit. It shifts the balance in favour of walking and cycling. The street environment becomes calmer, cleaner and quieter. In residential areas, there are more walkers and people just drive slower naturally. In these areas, cycling and walking becomes more pleasant and statistically safer. Fatality rate in collisions drops significantly.
3. Remove on-street car storage on Cambridge Road / High street. Why? On-street car storage encourages people to choose the car when making journeys within Milton. (I've done it myself.) Nowhere within Milton is more than a 3 minute cycle journey away.
4. Give cyclists and pedestrians priority at several key junctions on the Milton-Cambridge cycle route.(Winship road to Cambride Road) Why? To encourage people to use these routes and improve safety.
The DfT has made it clear that the money will only be allocated for measures that truly make space for cycling (please let me know if you want to see the letter, as it has not been widely shared). Those painted lanes do not meet the criteria set by the government, so they will have to be paid by Cambs Highways.
The deadline for councils to bid for the funds is Friday June 5th - in 6 days! If anybody has got any follow up suggestions I would suggest emailing our concillors well before that date, as any measures proposed will also have to be reviewed by Cambs Highways before they are sent off.
sound+fury // 1 thread
Change of use from Class 1 to Class 3 residential. See thread for more.
Condition 17 - Cycle parking and Refuse storage
1 Mere Way Cambridge Cambridgeshire CB4 2JP
Cambridge
Application reference : 17/1894/COND17
Created by Anna Williams – Head of Campaigns & Engagement // 0 threads
The Greater Cambridge Partnership (GCP) has secured up to £400m of funding for the second stage of the City Deal.
20/01474/REM | Reserved Matters application pursuant to application 07/0620/OUT for Phase 3 of the Community garden at Clay Farm, to include a permanant community building (replacement of temporary building), new central east-west footpath through community garden and new cycle link to western edge of site. | Land South Of Long Road And East Of Hobson's Brook Clay Farm Development Site Long Road Cambridge
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Modification of planning obligations (Affordable Housing tenure) contained in a Section 106 Agreement dated 11 July 2018 pursuant to planning permission 17/2214/FUL.
Land At Anstey Way Cambridge Cambridgeshire
Cambridge
Application reference : 20/02289/S106A
Created by Tim Burford // 1 thread
www.cyclestreets.net/location/115949/ to 115951 -
After all our correspondence with the chief exec of Highways England this is a pretty clear two fingers to all non-motorised users - the shared-use footway comes to a sudden end dumping north/westbound cyclists et al in the south/eastbound side of a dual carriageway with a 'safety' barrier blocking the way across. Insane.
Created by Roxanne (CEO) // 3 threads
What makes a good school street?
Where should we have school streets in Cambridge?
How can we campaign for school streets?
20/02142/OUT | Outline planning application for the development of Northstowe Phase 3B, comprising up to 1,000 homes, a primary school, secondary mixed use zone (with retail and associated services, food and drink, community, leisure, employment and residential uses), open space and landscaped areas, engineering and infrastructure works, with details of appearance, landscaping, layout, scale and access reserved. Application accompanied by an Environmental Statement. | Northstowe Phase 3B Station Road Longstanton Cambs
Thom S // 1 thread
Wide road with narrow pavements and marked parking bays on both sides taking up half the width of the footpath
Could we propose to LBHF that left and right turns here are cycle-only, creating low-traffic neighbourhoods east and west of Wandsworth Bridge Road, allowing safe cycle access from Putney to Embankment?
Created by Casey // 1 thread
In order to create a safe cycling and active transport environment we need to point out what we need, where.
In line with the policy announcement from Grant Shapps MP changes should be urgent and immediate so this is a space to plan, map them out and look at detail. We have the benefit of this being a forum where we have access to a lot of expertise in technical detail so feel free to suggest, upload photos, discuss, wish.
Created by Jim Chisholm // 1 thread
We need a front page link to sections about bike maintanace (links to YouTube videos) and tips for novice (or returning riders) Cycle Streets/ Bikeability etc (there were articles about maintence in old newsletters.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Environment and Scrutiny Committee consists of eight councillors who scrutinise the decisions of the Executive Councillor for Communities, Executive Councillor for Climate Change, Environment and City Centre, plus the Executive Councillor for Streets and Open Spaces.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by MB // 1 thread
Access for cyclists, pedestrians with buggies or wheelchairs is poor here. Pavement is not flush to carriageway, barriers effectively block access & there are oftern cars parked too. As a part of the 'London Cycle Network' (74) it is substandard. If the route is intended for cyclists, it should be made accessible to them. Other users (car drivers) should be prevented from blocking it.
In addition, there is a 'cyclists dismount' sign!
Created by Adam Edwards // 0 threads
Stanbroughbury is the new housing area proposed by Gascoyne-Cecil Estates (Hatfield House) in the area north of Hatfield Garden Village. The suggested route above would pass through the housing.
The route would directly link the new housing to Hatfield Station via a cycling and walking route of about a mile. To achieve this requires a new bridge over the A1(M) and Comet Way and makes use of the handy gap in the housing into the Birchwood estate at this point. As the alternatives for cars are a longer way round via Wellfield Road or via Stanborough, this new route would give waling and cycling a time advantage which would therefore incentivise use.
The route assumes a second entrance to Hatfield station at the north end of platforms 2/3 either onto Beaconsfield Road or St Albans Road East. This will be needed anyway as demand at the station increases. Opening this second entrance will also encourage walking to and from the north and west of Hatfield as it will shorten walking times quite considerably. This second entrance should be for walking and cycling only.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Harmston Rise.
Inadequate drainage.
Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.
Created by Paul Gasson // 1 thread
From the commonplace introduction:
"Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
The Highams Park Town Centre scheme area has over 6,500 addresses and includes the area framed by North Circular Road, Hatch Lane, Woodford New Road and other minor roads. We want to make it easier for you to walk and cycle local journeys should you choose to. We also want to improve the look and feel of the area, making it an even more enjoyable place, boosting business and giving residents a sense of pride in their community."
Created by Heather Rainbow // 1 thread
Planning application 15/02303/FUL is to make Long lane open to motor vehicles so that they can reach 10 new houses on Pyotts Hill House.
This will be debated at 6.30pm on Wednesday 10 August at the Civic Offices Basingstoke.
Cycle Basingstoke has already objected because the road along Long lane is only 3metres wide and pedestrians, cyclists, lorries and cars will have to share this space.
There is good access from Lily Mill Chine
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Cycling Dumfries // 0 threads
There is now a nice cycle path that takes you from the river away from Devorgilla bridge, but there is no easy way to go from there to the College Street cycle track or Terregles Street as both Market Square and Howgate Street are one-way going the other way. Adding an 'except cycles' sign and allowing contraflow cycling along Market Square (which is not a fast or busy road), combined with a crossing across Buccleuch St on the east side of the street would provide an alternative route through town when the Whitesands is closed (or the Loreburn Bridge). At the moment, to get across Buccleuch street you have to cross in three cycles of the light and there are railings preventing pedestrian and bike access to College Street. This would also benefit pedestrians.
At the bottom of South Avenue, the road turns into a short cycle track. There is no dropped kerb.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Penrhyn Rd & Surbiton Rd. Open until 17th November.