21/00772/OUT | A hybrid planning application next to ARM
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
Created by Gabriel // 1 thread
The plans for the improved shared pavement between Waterbeach and Milton have been added to the planning portal. Planning application: S/0559/17/COND29
Also please note the A10 SLO for a reduction of the speed limit on these sections from 50mph to 40mph.
https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-slo--reference-number-pr--------a---and-some-surrounding-roads-in-the-vicinity-of-milton--landbeach-and-waterbeach-18-0
From looking at the plans my main concerns
Narrow sections - less than 3m wide, which is not LTN 1/20 compliant and very unambitious seeing as 11,000 homes are being built in Waterbeach.
The separation from the carriageway is also very unambitious at 0,5m and not a properly segregated verge. 0,5m is the absolute minimum suggested in LTN 1/20. 1m is the minimum recommended.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Prohibit all motorised vehicles on Oakington Road, Longstanton from a point 460 metres south east of its junction with Wilson’s Road to Longstanton Road, Oakington and Westwick at a point 370 metres north west of its junction with Lowbury Crescent.
Access for pedestrians, cyclists & equestrians will be maintained with provision for access for adjacent agricultural landowners and emergency service vehicles.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Revoke 5.5 metres of the residents parking bay outside of 55 De Freville Avenue and replace with double yellow lines to facilitate a dropped kerb access.
Created by Steven Moseley // 1 thread
Part demolition of outbuilding to south west elevation and conversion of existing building to three two bedroom and three one bedroom apartments with associated parking
Created by Steven Moseley // 1 thread
Demolition of double garage and erection of five detached dwellings, garages with landscaping, access and front boundary wall. (re- submission of approval 181630 and 190582)
Created by Roxanne (CEO) // 1 thread
How can cycle parking at Queen Anne Terrace car park be improved and made more secure?
Outline Planning Application for up to 39 market homes and 16 affordable homes with vehicular access from Greate House Farm Road andThe Folley with all other matters reserved.
211392 / 211393
Large development, so several proposals for local routes in planning objection.
Created by Thomas Ashton // 1 thread
A pair of one way swing gates have been installed on Coldhams common. This blocks the path for people like me with a cargo bike because it is not possible to hold the gates open and hold the bike at the same time. I spoke with someone on the site and they said it was needed to stop cows escaping while they replaced the cattle grid. Surely there is a better way that don’t stop access for cargo bikes?
Created by KW // 1 thread
Hybrid planning application comprising: a) outline planning application for commercial development comprising B8 floorspace, including ancillary E(g)i floorspace, and flexible B8/E(g) floorspace, car and cycle parking, landscaping and associated infrastructure with all matters reserved except for access on Parcel A; b) full planning application for ecological enhancements on Parcel B; and c) full planning application for recreation and ecological enhancements, including landscaping, public open space and pedestrian and cycle access on Parcel C. | Land South Of Coldhams Lane Cambridge Cambridgeshire
Has implications for The Tins, Fulbourn Greenway, Cherry Hinton, Coldham's Lane, Brookfields, and Burnside.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing buildings/structures and erection of college accommodation, new access and landscaping
Wilberforce Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 No. one Bedroom Bungalows
Land To The Rear Of 32 And 32A Gray Road Cambridge CB1 3TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of outbuilding into one new dwelling, and enlargement of cycle and bin store
1 Grosvenor Court Cambridge CB3 0HU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 2bed dwelling on land rear of 57 Mowbray Road
57 Mowbray Road Cambridge CB1 7SR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
External Improvements to St Peter's Terrace including improved bike racks & storage, removal of three trees, enlarge gravel area, relay tarmac, new bin stores, new fences and reduce rear garden.
No change of use.
Land At St Peters Terrace Cambridge CB2 1QQ
Created by Marcus Howarth // 1 thread
From https://haveyoursay.tfl.gov.uk/lumley-road
This is in response to a high number of collisions having been recorded at this location involving vehicles turning right from Lumley Road, and northbound traffic on St Dunstan's Hill. Local residents and stakeholders have also raised concerns about this junction. We are now holding a public consultation on our proposals, running from 7 June to 18 July 2021, and you can find details of how to take part below.
We propose making the exit from Lumley Road onto St Dunstan's Hill left turn only. To enforce this, we propose installing a pedestrian island in the carriageway at the end of Lumley Road, which would help prevent vehicles from turning right. This island would include dropped kerbs and tactile paving. As well as prohibiting the right turn, this would also provide a safer and easier crossing point for pedestrians and cyclists crossing Lumley Road.
From impact assessment
Created by Steven Moseley // 1 thread
Resubmission of application number 210196 following redesign, for a single linked 2 bedroom house.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 172118 - APP/A1530/W/18/3200940 - Demolition of bungalow and barn/shed and the erection of 3no. dwellings.
Created by Steph Potter // 0 threads
This is a junction of a suburban road and a gravelled shared pedestrian/cycle route through Fish Pond Woods. Unfortunately, the dropped kerb to turn from the road onto the path does not line up with the path and there are no double yellow lines to prevent people from parking immediately blocking the path. Once on the path, the path is too narrow and poorly gravelled that it is difficult to try to stop or swerve if meeting a pedestrian or oncoming cyclist.
Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.