21/04797/FUL: 2no. dwellings. 200 Perne Road
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Created by Steven Moseley // 1 thread
Land Adjacent Hospytts, The Causeway, Great Horkesley CO6 4AD
Created by Steven Moseley // 1 thread
Proposal for 9 dwellings consisting of 4 x 3 bed houses and 4 x 2 bed apartments and 1 x 1 bed apartment.
Created by Steven Moseley // 1 thread
Demolition of existing Rugby clubhouse and erection of a new two storey community centre with associated parking and landscaping.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A new thread for discussions related to the Cambridgeshire and Peterborough Combined Authority, the strategic transport authority for our region.
Change of use from agricultural land for the construction of an A10 bridge structure with associated earthworks embankment bridge landing, construction of a shared use route for non-motorised users between the Waterbeach Barracks site and Green End including a 3m shared footway cycleway and 2m grassed verge for equestrians and 1m grassed verge, hard and soft landscaping, lighting, construction compound and temporary haul roads
Land Between Green End And The Waterbeach Barracks Site Waterbeach Cambridge Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 21/04625/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Transport in the March area (March North and Waldersley, March South and Rural, Whittlesey South) has been under review.
sound+fury // 1 thread
Part demolition of the existing Romsey Labour Club building with retention of the BLI historic frontage and erection of 44no. serviced apartments (sui generis use class) along with a cafe, gymnasium, community space, and associated infrastructure and landscaping.
Romsey Labour Club Mill Road Cambridge CB1 3NL
Cambridge
Application reference : 21/04559/FUL
Created by Steven Moseley // 1 thread
Outline planning application for 30 dwellings and 1ha of public open space and access from Newbarn Road. Some matters reserved.
Created by Steven Moseley // 1 thread
Demolition of existing dwelling and its replacement with a new dwelling
The existing mini-roundabouts are relatively easy to navigate for confident cyclists only. Any future segregated route along Berechurch Hall Road will require improvements.
Created by Steven Moseley // 1 thread
This junction is fast, dangerous, and over-complicated. It should be improved to better handle the current and future traffic, and cycle and pedestrian movements.
CBC cycling SPD route no. 9 (bidirectional segregated) along Berechurch Hall Road between Layer Rd. and Garrison path at junction with Berechurch Rd. should be provided.
Created by Steven Moseley // 1 thread
Created by Steven Moseley // 1 thread
The barrier should be removed (8.3)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en