PA_211926_SussexFlat
Proposed annex. Renewal of approved application 181350.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
sound+fury // 1 thread
As per the tags
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03261/FUL: Renovation and two storey side extension of existing three bed house, and three new two storey, two bed, three person terrace houses, external bike and bin stores
43 Brookfields Cambridge CB1 3NZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03119/FUL: New 1 bedroom dwelling fronting Hulatt Road
98 Wulfstan Way Cambridge CB1 8QJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03155/FUL: Erection of 9no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling
72 High Street Cherry Hinton Cambridge CB1 9HZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03413/FUL: Creation of a two storey semi-detached structure to provide 1 No. one bedroom apartment adjoining the neighbouring block of No. 32 Mill Road, ref: 12/1132/FUL
34 Mill Road Cambridge CB1 2AD
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02954/FUL | Change of use from office to flat. | 190 Green End Road Cambridge CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03304/FUL: Retention of existing dwelling, erection of 1no. linked 2 bedroom dwelling and 1no. 1 bedroom detached dwelling, along with a new parking bay accessed from Suez Road and associated works
108 Suez Road Cambridge CB1 3QD
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Red Lion Street and Dane Street in June 2020.
They also propose to:
- create a pedestrian and cycle only zone on Red Lion Street south of the junction with Princeton Street with new trees and cycle parking
- stop southbound motor traffic on Bedford Row from accessing Sandland Street, introducing a wide build-out with new trees, seating and cycle parking
Created by Alex Jenkins // 1 thread
https://talk.towerhamlets.gov.uk/lsshadwell
The Liveable Streets Shadwell proposal aims to improve the look and feel of the Shadwell area whilst making it easier, safer, and more convenient to get around by foot and bike.
Overview map of proposals in Shadwell. Please click on the image to download a larger copy.
These proposals have been developed on feedback based on residents, businesses and the local community and aim to benefit all road users. This is achieved by improving accessibility to walking and cycling for all so that those with disabilities, people of all ages, cultures and genders can feel safe. Additionally, the reduction in through traffic in the area will improve the safety and air quality for all.
Our proposals include:
What is being proposed?
Five schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Residents in particular parts of Cambridge are being asked to put forward proposals for improving open spaces and play areas via Cambridge City Council’s 2021 S106 funding round.
sound+fury // 1 thread
The application is for former offices to be turned into housing.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
According to the Combined Authority's Forward Plan (July 2021), the Transport and Infrastructure Committee are due to consider proposals for funding a Segregated Cycling Study for Holme to Sawtry and make recommendations to the Combined Authority on 8th September 2021. The lead officer is Paul Raynes, Director of Delivery and Strategy, and the decision will be made by Mayor Dr Nik Johnson.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02888/FUL | Change of use to a large HMO (8 persons)
87 Ditton Fields Cambridge CB5 8QQ
sound+fury // 1 thread
From Idox: Demolition of all buildings on site and erection of 1no. detached dwelling and 8no. 1 and 2 bed apartments Demolish Existing Bungalow and replace with 1No. Detached 2 Storey Dwelling at front of site. Demolish all outbuilding to rear currently used a flooring company and replace with 8No. 1 and 2 Bedroom Apartments. | 125 Scotland Road Cambridge CB4 1QL
Created by Jean Dollimore // 1 thread
TfL is planning to upgrade two of the existing signalised pedestrian crossings on Camden Road to Toucans.
These crossings are:
Rochester Road to Rochester Square
The crossing lines up with Rochester Square (south side of Camden Road) so TfL is proposing a section of shared-use footway on the north side of Camden Road from Rochester Road to the crossing.
Cantelowes Gardens to Cantelowes Road
The crossing almost lines up with the footway exit from Cantelowes Road (past the planter known locally as the ‘billiard table’). TfL is proposing a section of shared-use footway on the north side of Camden Road between the western exit from the Gardens and the crossing.
Details
Camden is being left to make the connections at both ends of the two crossings. These are tricky e.g. cycling isn’t even allowed in Cantelowes Gardens at the moment. But those issues are outside the scope of this consultation.
Toucans are signalised crossings where cycles and pedestrian share the surface of the crossing as well as an area of footway on both sides of the road. They are supposed to be at least 4m wide. (LTN 2/95).
The Rochester Road crossing width will be increased to 4m. The crossing at Cantelowes Road is already over 3.5m wide. In both case the island width will be increased to 2.5m
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02293/FUL | Construction of 2no 1bed dwellings.
15 Garlic Row Cambridge Cambridgeshire CB5 8HW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02862/FUL | Two storey rear extension and loft conversion of existing dwelling to create additional accommodation and development to side of existing dwelling to create two self contained 1-bed flats
15 Tillyard Way Cambridge CB1 8QT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from single dwellinghouse (class C3) to 11 person house in multiple occupation (sui generis) including provision of cycle and refuse store
1 Selwyn Gardens Cambridge CB3 9AX
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02759/FUL: Demolition of existing buildings and erection of new commercial/retail floor space, 48 new residential apartments and houses, new car parking areas, new hard and soft landscaping, bin and bike stores and associated works
Colville Road Phase 3
Land At Colville Road
And Fishers Lane
High Street
Cherry Hinton
Cambridge Cambridgeshire CB1 9HT
Created by Jean Dollimore // 1 thread
Sandall Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Sandall Road by the width restriction to prevent motor traffic from cutting through residential streets between Camden Road and Kentish Town Road or Leighton Road.
Camden is now consulting on whether the trail scheme should be made permanent. Drawing here.
The consultation and the Online Survey are here
https://consultations.wearecamden.org/supporting-communities/sandall-road/
Savernake and Cressy Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Savenake Road by the entry to Saverrnake Bridge to prevent motor traffic from cutting through Constantine Road and Savernake Road to avoid the signals at the junction of Agincourt Road and Mansfield Road.
Camden is now consulting on whether the trail scheme should be made permanent with some enhancements - three separate water absorbing planting areas to include three new trees. Plans.
They are also proposing two-way cycling on Cressy Road between Agincourt Road and Constantine Road – a very welcome extension of the recently implemented two-way cycling on Cressy Road south of Agincourt Road.
And an electric vehicle charging point.
The consultation and the Online Survey are here
Created by Roxanne (CEO) // 1 thread
Anglian Water and Cambridge City Council, working with U+I and TOWN, are exploring the vision for a new sustainable urban quarter at the heart of the proposed new district of North East Cambridge.
The project is currently called the Core Site, North East Cambridge (shown on the attached map). The aim is to deliver over 5,000 new homes on the Core Site over the next 20 years, along with shops, workplaces, education, community and leisure facilities, and open spaces. This opportunity is enabled by the proposed relocation of Anglian Water’s Cambridge Waste Water Treatment Plant, with the support of Homes England, and the Cambridgeshire and Peterborough Combined Authority.
Cambridge City Council is currently bringing forward an Area Action Plan (AAP) for the wider district, within which the Core Site is located, which could deliver a total of 8,000 new homes in ‘an inclusive, walkable, low-carbon new city district with a lively mix of homes, workplaces, services and social spaces, fully integrated with surrounding neighbourhoods’. The Core Site has a key role to play in delivering this vision.
The landowners of the Core Site - Anglian Water and Cambridge City Council - have selected U+I, in partnership with TOWN, as master developers for the site will be working to bring forward proposals for the site and, eventually, a planning application.
Created by Steven Moseley // 1 thread
Conversion of existing first floor office accommodation into two 2 bedroom apartments along with ground floor refuse and cycle storage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.