PA_212540_BlueOwlGtHorks
Part change of use from retail to domestic, with proposed gates and post and rail fence to front of car park. Erection of car barn to rearof site.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Part change of use from retail to domestic, with proposed gates and post and rail fence to front of car park. Erection of car barn to rearof site.
Created by Jean Dollimore // 1 thread
In June 2020, a No Entry (with cycle exception) was placed on Millfield Lane just south of the junction of Merton Lane, making the southern section one way northbound for motor vehicles. In addition, several parking spaces were removed at the bend to provide more space for walking. This was done with an experimental traffic order and Camden is now consulting on making the changes permanent and building a proper footway at the widened section.
Extras
Camden also proposes:
They also ask whether we would like to have Merton Lane one-way for motor vehicles (eastbound only)
Created by Steven Moseley // 1 thread
Outline Planning Application (with all matters reserved except access) for the erection of up to 600 dwellings, land for a co-located2FE primary school and early years nursery, public open space and associate infrastructure. Vehicular access from Londo
Created by Steven Moseley // 1 thread
Residential development (approximately 1500 dwellings including conversion of some retained hospital buildings) mixed uses, including community facilities, employment and retail, public open space, landscaping, new highways, transport improvements, reserved route of the Northern Approach Road Phase 3 (NAR3), and associated development.
Created by Steven Moseley // 1 thread
Mixed use development comprising nursery at ground floor level and residential units at first floor with associated parking and landscaping as a part of Neighbourhood Centre NC2
Created by Steven Moseley // 1 thread
Construction of 6 new residential homes with associated landscaping and parking
Created by Steven Moseley // 1 thread
Conversion of existing roof space of Block A2 to create 1no. 1bed flat with 25sqm private terrace, together with allocation of 1no. car parking spaces (AMENDED DESCRIPTION)
Created by Steven Moseley // 1 thread
Listed building: Proposed Change of Use from accommodation ancillary to the existing Gaming Centre (Sui Generis) to C3 (residential dwelling) on existing 2nd floor. Listed Building Consent for minor alterations to facilitate the change of use.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from B1(a) (offices) to Class C3 (11no flats) with changes to external elevations including new balcony structure and dormer windows
620-622 Chartwell House Newmarket Road Cambridge CB5 8LP
Cambridge
Application reference : 21/04350/FUL
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Camcycle would like to support communities across the county as part of our strategy to influence decision-making at a regional level and our campaign for Zero Carbon Streets in Cambridgeshire which aims to empower local groups to work for better walking and cycling in their areas. Fenland has historically been badly served in terms of active travel investment and is an important district in which to support improvements.
sound+fury // 1 thread
Change of use of a vacant office (Class E, previously Class B1) to Hostel (Sui generis) and use of the roof space as external amenity space.
49 Sidney Street (First And Second Floor) Cambridge Cambridgeshire CB2 3JF
Cambridge
Application reference : 21/04260/FUL
Created by catch // 0 threads
Suggestions to reduce traffic (via restricting southbound traffic) and potentially add cycling infrastructure on Brook street.
See google document.
Created by User 3428 (deleted) // 1 thread
Sunday 26th of September 10.15pm I was cycling from Cambridge North to Histon. I collided with a fence immediately after exiting the A14 tunnel and sustained a dislocated shoulder along with other injuries.
There is definitely a hazard here because
1) the busway and tunnel from Cambridge North are brightly lit. The busway after the tunnel towards Histon is unlit.
2) about 30m after the tunnel the width of the busway tarmac surface suddenly reduces due to the introduction of the gravel strip (approx 1m wide). There is also a fence near the start of the gravel strip (I assume for the small animal tunnel)..
I cycled through the tunnel and noticed a cyclist coming in the opposite direction (without lights), so I took avoiding action by moving to the left. I may have then glanced at my mobile phone on my handlebars. When I looked up I saw the fence in my headlight. I then hit or clipped the fence.
Created by Steven Moseley // 1 thread
Change of Use from Class D1 (New Ee) Health Clinic previously trading as The Physiotherapy Practice to Class C3(a) Dwelling House.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion and extension to provide seven flats
3-4 Market Hill Cambridge CB2 3NJ
Cambridge
Application reference : 21/04188/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part demolition of outbuildings, erection of single storey annexe and change of use to 6 bed HMO (Sui Generis) for 6 persons
7 Kent Way Cambridge CB4 2QY
Cambridge
Application reference : 21/03983/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 no. 2 bed flats with associated bin and cycle stores
Land Adjacent King Hedges Road Cambridge Cambridgeshire
Cambridge
Application reference : 21/03991/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to 11bed HMO for 11 persons (sui generis).
157 Shelford Road Cambridge CB2 9ND
Cambridge
Application reference : 21/03899/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03821/FUL | Extensions and alterations to pair of semi-detached dwellings to create 6x new apartments and 1x detached one bedroom unit. Improvements to front boundary wall and front garden area, including off road parking for 2 vehicles retained and bins and cycle store provided.
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 6no. dwellings together with access, car parking, bin and bikes stores, landscaping and associated infrastructure
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 7 apartments comprising 1 x 2-bed and 6 x 1-bed units, including bin and cycle storage facilities, together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.