PA 220451 31VictoriaRdDwelling
The erection of a three bedroom house with off street parking, to the garden of 31 Victoria Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
The erection of a three bedroom house with off street parking, to the garden of 31 Victoria Road
Created by Steven Moseley // 1 thread
Outline application for the construction of a single storey dwelling following the demolition of an existing extension to no. 1 London Road, Marks Tey. (All matters reserved apart from access).
Created by Steven Moseley // 1 thread
Application for Prior Approval under Part 18 of the Town and Country Planning (General Permitted Development) (England) Order (As Amended) - Installation of an MDU building, to improve railway services in Colchester and Essex.
Created by Will Bramhill // 0 threads
Created by Steven Moseley // 1 thread
Demolition of Former Bearings Factory and Erection of New Building comprising 3 no. blocks over four and five storeys containing 65 no. Residential Apartments and 2 no. Commercial Units (Class E), with undercroft car parking.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping.
Hills Road Sixth Form College Hills Road Cambridge Cambridgeshire CB2 8PE
Application reference: 22/00712/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of Numbers 16 and 16A Burleigh Street and the construction of a three-storey building comprising a retail unit on the ground floor and 3 no. apartments on the first and second floors providing bin and cycle stores on land to the rear of the new retail unit and access to the proposed apartments will be from Burleigh Place, while the retail element will remain accessible from the front (i.e. Burleigh Street).
16 And 16A Burleigh Street Cambridge Cambridgeshire CB1 1DG
Application reference: 22/00655/FUL
Created by Will Bramhill // 1 thread
Needs better connection to Trinity School
Created by Steven Moseley // 1 thread
220235: Application to determine if prior approval is required for a proposed Change of Use from Commercial Businesss & Service (Use Class E) to Dwellinghouses (Use Class C3)
220201: Proposed roof conversion, including construction of new dormer windows and external fa¦ade upgrades to form 4 new apartments at Ewer House
PA_220201_44-46CrouchStRoof_01.txt, PA_220235_44-46CrouchSt_01.txt
sound+fury // 1 thread
this old fashioned barrier on a major cycleway needs a rethink
Created by Martinb // 1 thread
Kissing gate obstructs cycle route, especially for trailer and trikes
sound+fury // 1 thread
This is a dangerous junction for people on bikes. How can it be improved?
Anon // 0 threads
The path / cut-through between Ditton Meadows and Ditton Walk (next to Ronald Rolph Court) is currently blocked by a fallen tree.
It's possible to squeeze under it with a standard bicycle if you're agile.
Looks like someone attempted to block the path with red/white tape at the southern entrance, but it's all come down of course. I didn't see any warning at the northern entrance.
There's a report on the County Council site (387287), but it's marked as 'closed' on the 21st Feb. Tree was still there on 22nd.
[later:] It was gone by 15 March (probably long before).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
22/00293/FUL | Two storey side, single storey rear and roof extension to create 4 flats
184 Thoday Street Cambridge CB1 3AX
Application reference: 22/00293/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing garages and hardstanding and erection of 14no houses (7 at Aragon Close and 7 at Sackville Close) together with car parking, green space, landscaping, bin and bike stores and associated infrastructure.
Land At Aragon Close And Sackville Close Cambridge Cambridgeshire
Cambridge
Application reference : 22/00583/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2bed bungalow to the rear of 157 Green End Road
157 Green End Road Cambridge CB4 1RW
Cambridge
Application reference : 22/00469/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Submission of details required by conditions 10 (Cycle Parking layout) and 15 (Traffic Management Plan) of planning permission 19/1453/FUL.
107 Shah Jalal Mosque Darwin Drive Cambridge Cambridgeshire CB4 3HQ
Cambridge
Created by Roxanne (CEO) // 1 thread
A member of the public has informed us that the signals at the junction of East Road and Mill Road are not detecting people on bikes on the lane in front of the fire station heading east on Mill Road. Has anyone else experienced this? We can get an email to the signals team.
Created by Steven Moseley // 1 thread
Outline application to demolish existing dwelling and construct 6 No. 1 bedroom, 2 storey flats with associated works to garden and parking area
Created by Jean Dollimore // 1 thread
Following consultation in January 2021, Camden put in a trial scheme using ETOs in May 2021.
The main features of the trial scheme were:
Camden is now proposing to make the scheme permanent but with the following changes:
These changes still ensure no rat-running on Grafton Road and on Queen’s Crescent, which is very important for cycling since C6 runs along Grafton Road and Queen’s Crescent provides a useful route to it from the western end of Prince of Wales Road (although cycling though isn’t convenient on market days).
Camden’s stated motivations for the changes in QC are
Other proposed additions:
Created by Tim Burford // 1 thread
Not a problem, but rather out of the blue a mile-long shared-use path is being constructed along the A1198 from Papworth Everard to Caxton Gibbet, to connect with the existing route to Cambourne and Cambridge. Did we know about this? What consultations took place?
Created by Steven Moseley // 1 thread
Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en