'Quick Win' cycling permeability improvements in Westminster
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Dominic Fee // 1 thread
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
Created by Jon Warbrick // 1 thread
Cambridgeshire Insight have just released data from a set of 'smart' traffic sensors installed to monitor the effect of the Mill Road bridge closure: https://data.cambridgeshireinsight.org.uk/story/monitoring-impact-mill-road-bridge-closure
This data is particularly interesting because it provides classified counts of pedestrians, cyclists and various classes of motor vehicle in both directions across 15 locations in Cambridge.
Conversion and extension of 3 bed detached dwelling into 2 x 2-bed and 3 x 1-bed apartments including a part 3 storey, part 2 storey and part single storey rear extension incorporating balconies on 1st and 2nd floor, extension to roof from hip to gable, conversion of garage to living space and associated alterations. Erection of bin and cycle storage in front garden.
25A Mowbray Road Cambridge CB1 7SR
Cambridge
Application reference : 19/0698/FUL
Anon // 1 thread
Overview
We want to hear your views on the planned controlled parking zone for the Rotherhithe and Surrey Docks area.
Up to 3,000 new homes in the area mean that a controlled parking zone is essential - in particular, this is the only way to enforce the permit-free planning conditions for the Canada Water development, and prevent intolerable additional parking pressures.
Anon // 1 thread
We are consulting on creating two way streets in the Lower Road area and Cycleway 4.
The existing road layout creates a sense of motor-vehicle dominance, one way streets encourage fast vehicle speeds, which adds to unpleasant conditions for both pedestrians and cyclists.
Anon // 1 thread
Overview
We are consulting on creating a cycleway in the Rotherhithe area.
Future cycling demand is predicting there will be a significant desire to\from Peckham and beyond, with up to 150 cyclists using the route during the peak period, in the event of a free ferry crossing being developed.
We have developed proposals to link Cycleway 4 and Quietway 14 as a first phase and we are exploring potential connections towards Peckham.
Anon // 1 thread
Transport for London has awarded Southwark funding to improve streets in South Bermondsey to make this a more “Liveable Neighbourhood”. The council wants to hear your ideas on how to spend £30,000 this year to improve the look and feel of your streets and make it easier to walk and cycle.
Improvements could include new crossing points and other safety features, new green spaces, cycle routes or cycle parking.
The council also plans to bid for more money for the next year three years to provide more street improvements and to make this area even more pleasant and healthy for you and your family.
Created by John Chamberlain // 1 thread
From late July till end November, Robert Street will be closed between Stanhope Street and Hampstead Road for HS2 related water main replacement. All traffic including cycles will be diverted.
Update October 2019: Works extended to end of year.
Created by FrenchyF // 1 thread
It can take up to 5 minutes to cross from the east side of Little France Drive to the west side of ODR, as there are four stages of pedestrian crossings.
Created by Simon Still // 1 thread
In the last three years, there were 61 collisions, with 71 casualties, 19 of which were people cycling and eight of which involved pedestrians. (Data available up until the end of November 2018).
The scheme aims to address identified and perceived safety concerns at these junctions, as well as at George’s Road and the turning into the petrol filling station south of Palmer Place. The scheme will introduce new, signalised pedestrian crossings at the Drayton Park/Palmer Place junction, replace the zebra crossing at the junction of Liverpool Road with a signalised crossing and simplify all the existing staggered crossings to straight across crossings at the Hornsey Road/Hornsey Street junction.
We consulted on a proposal that sought to deliver signalised pedestrian crossings at Drayton Park/Palmer Place and Liverpool Road in 2010. This was not taken ahead because of concerns raised during the consultation about the impact of the scheme on local roads arising from proposed banned turns. This consultation was also launched shortly after the recently opened Emirates stadium, the effects of which were felt to have an impact on the response to the consultation. When developing our new proposal we took this feedback into account and have now amended the scheme to address these concerns. The details can be found below.
Our proposals
We would like your views on the following proposals which aim to provide new signalised crossings and address identified safety concerns.
We propose to provide new, signalised pedestrian crossings at the Holloway Road/Palmer Place/Drayton Park junction and the Holloway Road/Liverpool Road junction. The existing signalised pedestrian crossing outside the London Metropolitan University Clocktower building would move south and be brought into the new junction.
We propose to simplify the Holloway Road/Hornsey Street/Hornsey Road junction. We would convert the existing staggered signalised pedestrian crossings to straight across crossings. We also propose to remove the small triangular pedestrian island and slip road into Hornsey Road to create more space for people walking, reduce the crossing distance and simplify traffic movements.
To allow for the proposed crossing changes to be introduced, changes to some bus stops, loading bays and parking locations between Hornsey Street/Hornsey Road and Ronalds Road would be required.
To provide the new crossings, we propose to make changes to some permitted turning arrangements for traffic at the Drayton Park/Palmer Place and Liverpool Road junctions. All movements through the area would still be possible in the new road layout, but it might be necessary for road users to take a different route. These changes are necessary to allow the crossings to be delivered without displacing traffic on to local roads.
In detail:
We need to remove two trees to ensure the new signals at Liverpool Road are visible to drivers. We have identified locations to plant new trees elsewhere within the scheme extents, subject to ground conditions.
We propose to change the traffic signals at the Drayton Park/Palmer Place junction so that the side roads run separately to reduce the risk of conflict between road users at this junction.
To provide the new pedestrian crossings at the Drayton Park/Palmer Place junction and on Liverpool Road, all the junctions in the scheme must be addressed together. This is to ensure the road network operates effectively in this area for all users.
Traffic modelling
Our traffic modelling data shows that the overall effect of our proposals on buses is generally neutral. The majority of bus routes will experience a change in journey time of between 0 and 30 seconds, however there are also some considerable improvements, of up to 5 minutes, expected for buses using Liverpool Road in both directions, particularly during the PM peak. There is an overall small impact on northbound general traffic, with improved journey times for southbound general traffic. These impacts result from the need to balance the network for all vehicular modes affected by the proposals.
Bus service changes
As a result of changes to the turning movements at the junction of Palmer Place to Holloway Road, we are also proposing to reroute the 153 bus route in a northbound direction from Palmer Place on to Liverpool Road. This is required because of the changes at the Palmer Place junction but is also expected to increase reliability and simplicity for passengers.
Cycleway consultation
The London Borough of Islington, in partnership with Transport for London, are also currently consulting on a new Cycleway adjacent to this scheme. The new Cycleway will connect Finsbury Park and Highbury Fields, where the improved route will help cyclists cross Holloway Road at the existing cycle crossing at Fieldway Crescent. More details are available at: www.islington.gov.uk/highburycycleway.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by Matthew // 1 thread
The central portion of Hills Road seems to be a kind of 'forgotten' area, with nothing more than narrow mandatory cycle lanes in miserable shape, and terrible junction design for people walking and cycling.
If GCP is looking for an area that needs improvement, this is one that needs doing, and it is fairly central and high-profile.
Created by David Lincoln // 1 thread
Compton Street (from Agdon Street to Goswell Road) and Cyrus Street - School Street Scheme
St. Peter & St. Paul Catholic Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around St. Peter & St. Paul Catholic Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Compton Street and Cyrus Street?
The proposal is to trial a temporary road closure on Compton Street (from Agdon Street to Goswell Road) and Cyrus Street into a School Street Scheme between 8.30am to 9.15am plus 2.45pm to 3.45pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Moreland Street, Pickard Street and Gard Street - School Street Scheme Moreland Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Moreland Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Moreland Street, Pickard Street and Gard Street?
The proposal is to trial a temporary road closure on Moreland Street, Pickard Street and Gard Street between 8.30am to 9.15am plus 3.00pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Noel Road (from Danbury Street to St Peter’s Street) - School Street Scheme
Hanover Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Hanover
Primary School and create a safer, more pleasant environment for everyone. The Council would like to
hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and
cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools
this will help to reduce congestion and pollution at the school gates as well as make it easier and safer
for children to get to and from school.
What is proposed for Noel Road?
The proposal is to trial a temporary road closure on Noel Road (from Danbury Street to St Peter’s
Street) between 8.30am to 9.15am plus 3.15pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an
exemption. Residents and businesses who live and work on a school street will be able to register for
an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at
weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered
vehicles entering the street during the times of operation may be identified by camera and issued a
penalty charge notice.
Hanover Primary School is being looked at as part of the wider School Street Scheme Programme
across the borough. An 18 month trial is proposed. The Council will be working with the school and local
community to develop the scheme.
Change of use from 8 bedroom guest house (Use C1) to 9 bedroom guest house (Use C1) and associated refurbishment works including:- installation of roof lights, replacement canopy, installation of railings and dwarf wall to front elevation and cycling parking.
4 Huntingdon Road Cambridge CB3 0HH
Cambridge
Application reference : 19/0830/FUL
Created by Anoop // 1 thread
Minor roads in Kenton such as Kingshill Avenue are used inappropriately by through traffic. This is a consultation on options to reduce through motor traffic whilst maintaining access for walking and cycling
Created by M Stanley // 1 thread
Leeds city council are proposing to reduce the speed limit from 60mph to 40mph
Created by Marcus Howarth // 1 thread
Doing a quick scan of the document see some enoughing comments on segregated cycleway in high st, parking and a cycle networks.
Unfortunately skip to the table at the end and it seems to be Medium to Long term objectives so real actions lacking.
see p53 Guideline SS4: The Northern Side of the High Street
Any redevelopment should take the opportunity to create a
segregated cycle path parallel to the High Street.
p61
7.29 Assisting a shift to more sustainable modes of transport would also be
beneficial. Expanding the cycle network to create a segregated cycle way and
increasing the pedestrian access and wayfinding for pedestrians to and from
the High Street and Grove Park would also be welcome by-products, should a
comprehensive redevelopment of the north side of the High Street take place.
Guideline G9: Traffic and Transport
The council will seek to improve the cycling network and pedestrian
network throughout the Conservation Area as opportunities arise.
Temporary highway works on the northern side of Newmarket Road for a period of up to five years.
Land north of, NEWMARKET ROAD, Cambridge
South Cambridgeshire
Application reference : S/1605/19/FL
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout