Needs proper dropped kerbs here
Poor set of partially dropped kerbs here across entrances to shell garages.
To get from the Toucan crossing of Maybury Road to North Gyle Terrace you have to bump down & up 2 sets of bad kerbs
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by HankChief // 0 threads
Poor set of partially dropped kerbs here across entrances to shell garages.
To get from the Toucan crossing of Maybury Road to North Gyle Terrace you have to bump down & up 2 sets of bad kerbs
Created by HankChief // 0 threads
Needs a dropped kerb to exit this cut-through onto the road
Created by Andrew Woodward // 0 threads
The section of the cycle network from Boileau Rd to Hammersmith Bridge is poorly signposted, inconvenient and suffers from poor subjective safety.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by timlennon // 0 threads
Facilities to cycle to school are extremely limited, mostly involving sharing pavements which are busy in the morning. Lots of dropping of by car in a very restricted area, and disjointed, incomplete routes, especially around the South Circular, where no-one really wants to cycle, least of all with children.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
This re-design (incl re-alignment) is a pure 1960s motorway scheme. Very disappointing.
Pedestrians and cyclists are virtually NOT considered here.
http://newcycling.org/sites/default/files/105_salters_church.pdf
Some rejigging
There some flaws in the design. Pedstrian desire lines are ignored leading to staggered / staged crossings. The whole design does not do much for the public realm in general and the area remains an 'urban motorway'.
The cycle lanes (width unknown) are an inadequate separation for the volume/speed of traffic and not even elephant footprints across to guide cyclists across the wide opening of the Regent bus stop entry have been included.
Regent Farm Road entry should be closed down.
We do not hold out much hope for the traffic light phasing. They will likely to be conventional highway design too.
Plan is downloadable here
http://newcycling.org/sites/default/files/104_regent_christon.pdf
Created by Katja Leyendecker // 0 threads
Major re-design
There are many flaws in this conventional highway road design. Pedestrian desire lines are disregarded. No cycle-specific light phasing has been included it seems. ASL are a token effort. No elephant footporints. But the biggest mistake is to keep the left-turn filter. It really puts cyclists directly at risk and in conflict with drivers - we urge council to remove that filter.
There also is a new right-turn lane into Knightsbridge which puts cyclists at risk of turning drivers. The entrance to Knightsbridge should also be necked-down for pedestrian and cyclist safety and comfort.
Plan is downloadable here
http://newcycling.org/sites/default/files/103_hollywood_pale_.pdf
Some re-adjustments. Includes cycle space and necking-down on Park Avenue are good.
Not so good is inconsistency in the cycle infrastructure design, and disregard to pedestrian desire lines over Park Avenue (which could be rectified by moving the raised table), and no necking-down of Harewood Road.
Plan is downloadable here
http://newcycling.org/sites/default/files/102_park_harewood.pdf
Created by Katja Leyendecker // 1 thread
Large scale re-design.
Looks okay, even quite innovative, some design clarificaitons are needed re: turning speeds / neckdowns, separation types, transitions
Plan is downloadable here http://newcycling.org/sites/default/files/101_broadway.pdf
Created by MJR // 1 thread
Downham Market has National Route 11 running through it roughly north-south but doesn't have much of a signposted cycle network otherwise. There are some useful cut-throughs so this looks like it could be an ideal market town for cycling with relatively little work.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Ashleigh Road area, especially on route Ashleigh Road-Barbican Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path on north side of Ashleigh Road Approach Road (requiring NEW lay out of one-way Approach Road, moving parking bays to disused opposite south side of Approach Road). Current vegetation can be replanted as buffer between new shared path and main carriageway, so nice look of road won't be affected.
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Inner Relief Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path between Oakleigh Road and pelican crossing on Inner Relief Road
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath to shared space on triangle at start Summerland Street; natural feeding route on/off triangle to pelican crossing on Belle Meadow Road
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Belle Meadow Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath on east side of Queen Street and Queen Street Roundabout to shared path, from Hardaway Head to Pelican Crossing Belle Meadow Road (taking space from main carriage way)
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Chanters Hill area, especially on route Sunset Heights-Sowden Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade wide footpath on south side of Bear Street into shared path between Alexandra Road and Sunset Heights
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.