Cherry Hinton Hall
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03912/FUL | Residential development containing eight flats along with access, car parking, landscaping and infrastructure | Land Rear Of Gibson House Paradise Street Cambridge Cambridgeshire CB1 1DJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03838/FUL | Demolition of existing house and the erection of 3 No. dwellings | 38 High Street Chesterton Cambridge CB4 1NG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03877/FUL | Change of use from residential (C3) to large scale HMO for 12 persons (Sui Generis)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03966/FUL | Change of use from one dwelling to four flats, single storey rear extension and external alterations. | 1 Blackhall Road Cambridge CB4 3NJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread for committee meetings
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03034/FUL | Erection of new 2-Bedroom house adjoining existing house (number 168 New Street). | 168 New Street Cambridge CB1 2QX
Tom McKeown // 1 thread
Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.
Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS
Cambridge
Application reference : 20/03742/FUL
The former level crossing near a petrol station and the Strikes bowling alley is a frequent source of conflict between cycling and motoring. As of 2020, this is a toucan crossing just west of the former railway's line, necessitating cyclists to slalom across it. There are short cycleways on the south side of the A148 Lynn Road and Gaywood Road providing access to the main entrance of King Edward School.
20/02728/REM | Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/3064/16/OL for 155 dwellings following demolition of two existing dwellings | Land South Of 279 St Neots Road Hardwick Cambridgeshire
Created by Paul Robison // 1 thread
Storey's Way open again to through traffic
Created by Steven Moseley // 2 threads
Development of 153 dwellings with associated parking, landscaping, open space, drainage and infrastructure and formation of new access and alterations to existing access onto Berechurch Hall Road.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases, in line with government guidance on the Covid-19 response. Walworth has been identified as a priority area.
We are installing experimental measures below to create a low-traffic neighbourhood and re-purpose the street space for the pedestrians, cyclists, the local community and businesses:
- Permeable closures (these are streets closed to motor vehicles but open to pedestrians and cyclists) on: Larcom Street, Browning Street, Merrow Street, Amelia Street, Alberta Street, Iliffe Street, Penton Place, Chapter Road, Cooks Road, Blackwood Street and Walworth Place.
- Introducing a bus gate on Carter Street and Manor Place.
- Footway widening on Braganza Street and Carter Street.
- Introducing a one-way system on Braganza Street Westbound only, and reversing the one-way system on Chapter Road to Northbound only.
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Rye Lane will be closed to motor traffic from 6 July to allow more space for social distancing for shoppers, cyclists and pedestrians, and to ensure the works around Peckham Rye station can be carried out safely at the same time.
We want to hear from you about the effects of this closures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. The East Dulwich are has been identified as a priority.
On the 30 June we installed Phase 1 of the East Dulwich Streetspace measures, which is a permeable road closure (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove, south of Tell Grove.
The East Dulwich Streetspace Phase 2 measures will be installed on 3rd September. Details of these are below and aim to re-purpose the street space for pedestrians, cyclists and the local community:
• a permeable closure using planters (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove at the junction with Grove Vale
• a permeable closure using planters on Derwent Grove at the junction with Grove Vale
• a permeable closure using planters on Elsie Road at the junction with Grove Vale
• a permeable closure using planters on Tintagel Crescent at the junction with Grove Vale
• a school street closure during school drop-off and pick-up on Tintagel Crescent and Elsie Road (residents and emergency services will still be permitted entry)
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. Dulwich has been identified as a priority.
We have now installed the experimental measures below to re-purpose the street space for pedestrians, cyclists, the local community and businesses:
- a closure of Calton Avenue south of Gilkes Crescent
- a closure on Court Lane at the Calton Avenue junction
- a closure of Calton Avenue at the Dulwich Village junction
We want to hear from you about the effects of these closures.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Greater Cambridge Partnership operates as a Joint Committee, under powers delegated by its three local authority partners.
It is led by a decision-making Executive Board which coordinates the overall strategic vision and drives forward the partnership’s programme of work. It is run in accordance with a clear governance structure, agreed by all partners.
The Executive Board is made up of one representative from each of the City Deal partners. While the law governing Joint Committees only allows the three local authority representatives voting rights, they consider the advice of the other representatives, to make sure decisions also represent the business and academic sectors.
The Board is advised and informed by a Joint Assembly. The Joint Assembly provides advice to the Executive Board, drawing on the broad expertise of its 15 members. The Assembly’s membership is made up of three elected councillors from each of the three councils in the Greater Cambridge area, and reflects the political composition of their council. The other City Deal partners each nominate three representatives, as stakeholders from a range of organisations within the fields of business and academia.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Issues related to Milton being worked on by Milton Cycling Campaign, a new group formed by Camcycle members living in the village.
Created by Heather Coleman // 1 thread
There's a wet greasy line the length of the southbound carriageway on Hills Road between OLEM and Station Road, just outside the bike lane. When I cycled down there around 8.50am there was a very strong smell of diesel.
TAKE CARE. Diesel doesn't just evaporate as petrol would but leaves a greasy slippery residue that can persist for some days.
I've tried reporting to County, who don't want to know. I've bounced the report to City; who knows if they will do anything or say it's not their problem either.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Planning and Transport Scrutiny Committee consists of nine councillors who scrutinise the decisions of the Executive Councillor for Planning Policy and Open Spaces and the Executive Councillor for Transport and Community Safety.
20/03523/FUL | Erection of a 5 storey building and a 6 storey building for commercial/business purposes, erection of a transport hub, gymnasium, surface parking, landscaping and associated infrastructure including demolition of the existing building (St John's House) and associated structures. | Land In The North West Part Of The St Johns Innovation Park Cowley Road Milton Cambridge Cambridgeshire CB4 0ZT
Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure
Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire
Cambridge
Application reference : 20/03802/FUL
Tom McKeown // 1 thread
Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.
A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.
Created by MJR // 0 threads
The Hardwick Road cycleway abruptly terminates at the corner of Beech Road, within sight of the next section at South Gates roundabout. Cyclists wishing to continue towards town without being obstructed by motorists need to either use six beg-button crossings of the A149 Hardwick Road to cross over and back, or use four beg-button crossings to head towards Hardings Way (where another three beg-buttons and currently a dismount greets them), or they can illegally slalom contraflow through a parking bay, footway and oncoming traffic - and unsurprisingly many do the latter.
All of the houses by the parking bay blocking the way have their own drives and it is not that much used. It could be repainted as a two-way cycleway, protected with posts and the slopes into the ends made shallower.
Created by MJR // 0 threads
A cycleway was built alongside Scania Way, but it is dangerous in many ways, including:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.