PA_212451_56MilRd
New studio dwelling
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion and extension to provide seven flats
3-4 Market Hill Cambridge CB2 3NJ
Cambridge
Application reference : 21/04188/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part demolition of outbuildings, erection of single storey annexe and change of use to 6 bed HMO (Sui Generis) for 6 persons
7 Kent Way Cambridge CB4 2QY
Cambridge
Application reference : 21/03983/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 no. 2 bed flats with associated bin and cycle stores
Land Adjacent King Hedges Road Cambridge Cambridgeshire
Cambridge
Application reference : 21/03991/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to 11bed HMO for 11 persons (sui generis).
157 Shelford Road Cambridge CB2 9ND
Cambridge
Application reference : 21/03899/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03821/FUL | Extensions and alterations to pair of semi-detached dwellings to create 6x new apartments and 1x detached one bedroom unit. Improvements to front boundary wall and front garden area, including off road parking for 2 vehicles retained and bins and cycle store provided.
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 6no. dwellings together with access, car parking, bin and bikes stores, landscaping and associated infrastructure
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 7 apartments comprising 1 x 2-bed and 6 x 1-bed units, including bin and cycle storage facilities, together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
Created by Steven Moseley // 1 thread
Conversion of existing 6 bed HMO (C4) into 9no. bedroom House in Multiple Occupation (HMO) for up to 9 people (Sui Generis) including the single story rear and side extensions approved under App Ref No's 211168 and 211243.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03437/FUL | Division of existing property into 4 no. 1 bedroom Flats including the construction of a single storey rear extension, two storey side extension and partial first floor extension. | 136 Mowbray Road Cambridge CB1 7TG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03508/FUL | Erection of 2 No. dwellinghouses together with associated access and landscaping works | Land To The Rear Of 368-370 Milton Road Cambridge Cambridgeshire CB4 1SU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03538/CL2PD | Certificate of lawfulness under Section 192 for a change of use of Unit 8 from Dwellinghouse (Class C3) to House in Multiple Occupation (HMO ( 6 bed )) (Class C4), retention of Unit 8A as a separated unit used as a Studio Flat and minor internal layout alterations. | 8 Oak Tree Avenue Cambridge CB4 1BA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03467/FUL | Construction of 4no, 1bed flats and associated external works to rear. |
17 - 19 Radegund Road Cambridge Cambridgeshire CB1 3RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03439/FUL | Erection of 3 No. 1 bedroom duplex dwellings with associated landscaping, parking, bin and cycle storage. |
Land Adjacent To 22 Mill End Close Cambridge Cambridgeshire CB1 9HS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03498/FUL | Demolition of existing garages and area of hardstanding and erection of 3 No. dwellings together with car parking, landscaping, bin and bike stores and associated infrastructure.
Land At Borrowdale Cambridge Cambridgeshire CB4 3HU
Created by catch // 0 threads
Proposal for new traffic-free routes using mostly existing footpaths/tracks from Cymbeline way opposite Sheepen Rd. to West Bergholt.
Created by Jean Dollimore // 1 thread
Camden is consulting on some proposed improvements for walking and cycling through the junction of Abbey Road and Belsize Road
Created by Steven Moseley // 1 thread
Erection of 4 detached dwellings, access road, new woodland plantation and additional landscaping.
Created by Steven Moseley // 1 thread
Full planning permission for the development of the site to provide 144 new residential units (including affordable homes) with associatedon-site electricity and drainage infrastructure, open space, landscaping, access roads, parking and turning areas,
Created by cpax // 1 thread
. I regularly have to use this mini roundabout ( 3 times a week )and when approaching from Fulbourn I find that drivers are increasingly
ignoring the give-way to traffic coming from the right rule and as I brake they then drive up the cycle route .
Created by Jean Dollimore // 1 thread
Camden Council installed Pop-up cycle lanes on Chalk Farm Road and the lower end of Haverstock Hill last summer. They are now consulting on proposals to make these and associated changes permanent.
The proposals include:
Drop In Sessions
23 September 2021 (Thursday) from 16:00 to 19:00
30 September 2021 (Thursday) from 16:00 to 19:00
Location: Castlehaven Community Centre, 23 Castlehaven Rd, London NW1 8RU
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.