210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
Created by Roxanne (CEO) // 1 thread
How should the junction with Glisson Road and Hills Road be improved to improve safety for people cycling, walking and driving?
Created by Edward Taylor // 1 thread
This is an ideal solution to the flow at Landbeach road.
Mobility needs from Landbeach, highlighted in Milton community are to provide cycle crossing at the A10 for school kids and parents.
Created by Dominic Fee // 1 thread
Westminster City Council made an experimental traffic order on 8 February 2021, which will have effects including to:
"(a) prohibit all vehicles from entering or proceeding in Vigo Street, between Savile Row and Sackville Street (except pedal cycles which will be able to travel in both directions);
(b) introduce one-way working south-westbound in Burlington Gardens, between Savile Row and Cork Street (except pedal cycles);
(c) reverse the one-way working in Sackville Street so that it applies in a northwestbound direction"
Created by Steven Moseley // 1 thread
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
Created by Steven Moseley // 1 thread
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
Created by Steven Moseley // 2 threads
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
cyclescape user // 0 threads
The current hardcore path is often not usable for walking / cycling during wet weather. The path is difficult to pass through due to water on the surface. A new tarmac option would be much better. A new drop kerb on Bell Court and widened access would also help improve this route. Note the path gives access to a local football pitch as well as a local park. Cycling and walking in the area would increase if this issue was fixed.
sound+fury // 1 thread
Proposal to demolish a couple of houses on Brooklands Avenue.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 121272 for the construction of 201 dwellings.
Parcels R01, R02 & R03, G1, G3, G4 And Osf1 North Colchester Urban Ext, Mile End Road, Colchester
Created by Steven Moseley // 1 thread
Application for approval of details reserved by conditions 5, 15, 16, 17, 19, 20, 21, 22 & 23 of 193133 (Phasing, CMS, Remediation, levels, finishes, landscaping, cycles, loading.)
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from Offices (Class B1(a)) to 10no. dwellinghouses (Class C3)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Extensions and internal alterations to create 7 no. new apartments including new detached 1 bedroom unit in rear curtlilage with off road parking for 2 vehicles and bins and cycle store
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for development at Land South Of Coldhams Lane, Cambridge
Land South Of Coldhams Lane Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing structures, erection of new building containing nine self-contained residential units, with associated parking, hard and soft landscaping works, and associated works and infrastructure
509 Coldhams Lane Cambridge CB1 3JS
Created by John Chamberlain // 1 thread
Eastbound Cycle Lane on Tavistock Place closed for 2 weeks
Created by Roxanne (CEO) // 1 thread
How can cycling on Trumpington Road be improved, especially to make it safe for people cycling to local schools?
Created by Alex Jenkins // 1 thread
The Council is committed to supporting Brick Lane’s recovery from the Covid-19 pandemic and wants to use the investment of the Liveable Streets programme to support Brick Lane businesses and the local community in months and years ahead.
Future Visualisation of Brick Lane(External link)
These proposals have been developed on feedback based on residents, businesses and local community. We are consulting on these proposals now, so that if they are supported we can implement them in time for Summer to benefit businesses, the local community and visitors.
Our proposals:
What is being proposed?
Three schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Our proposals include environmental enhancements and traffic calming measures to improve accessibility and safety for all and to encourage active travel.
Why are these proposals important?
Brick Lane is an iconic area of London that attracts over 18,500 pedestrians every day. This space is also shared with over 4,000 vehicles, many of which use Brick Lane to cut through the area. This means they are not visiting local businesses, schools or places of worship but are significant contributors to the already unacceptable levels of air pollution and congestion along Brick Lane.
School streets are central to our Brick Lane proposals to address key safety and air quality issues. Our initiatives will create accessible and safer school travel routes by reducing the number of cars polluting the school environment and improving road safety for children.
These proposals are a key part of Tower Hamlets commitment to support Brick Lane’s economic recovery from the Covid-19 pandemic and aims to attract more visitors to the area and support businesses to trade safely.
Overview of Brick Lane Proposals
Overview plan of all proposed works in the Brick Lane area. Please click to enlarge(External link)
Have your say
Your views on our Brick Lane proposals are important to us. You can have your say by providing your feedback through our online survey.
If you have any issues or questions you can either leave a question via our Q&A tool or alternatively email liveablestreets@towerhamlets.gov.uk(External link)
If you would like to raise any questions in Bengali or request a translated copy of the consultation booklet in Bengali then please fill out the request form here.
The consultation is open from Wednesday 17th March and closes at 11:59 on Wednesday 14 April 2021.
Coronavirus update
Our Liveable Streets programme team are following government advice and are currently working remotely. Work will continue as planned on the projects and the team will adhere to all guidelines.
Please note that construction timing is subject to change depending on changes to coronavirus restrictions, weather and coordination of works in the area. We will update the website with any changes to the programme and hope you will continue to help us improve the look and feel of your neighbourhood.
For coronavirus updates from Tower Hamlets or to join our mailing list please click here(External link).
If you have any questions regarding the construction phase please see below, or get in touch with the team by emailing LiveableStreets@towerhamlets.gov.uk(External link) or calling 0203 092 0401.
Created by Richard Ollerenshaw // 1 thread
Row of parked cars on busy road requires vehicles to overtake into oncoming traffic. Cyclists repeatedly forced into gutter at this location by oncoming vehicles.
Created by Robin Heydon // 1 thread
Proposed new development on the A505 between Heydon and Fowlmere
Created by John Chamberlain // 1 thread
Eversholt Street closed to all southbound traffic including cycles till late May
Created by Roxanne (CEO) // 1 thread
Last month, the Government launched the process to develop a long-term Spatial Framework for the Oxford-Cambridge Arc. The Government’s ambition is to support a better, more sustainable approach to planning for growth and investment in the area.
The Government's proposal:
https://www.gov.uk/guidance/oxford-cambridge-arc
What is the Arc?
The Oxford-Cambridge Arc (the Arc) is a globally significant area between Oxford, Milton Keynes and Cambridge. It is formed of five ceremonial counties: Oxfordshire, Bedfordshire, Buckinghamshire, Northamptonshire and Cambridgeshire.
It supports over two million jobs, adds over £110 billion to the economy every year and houses one of the fastest growing economies in England.
Our ambition for the Arc
There is an opportunity, recognised by government and local partners, to build a better economic, social and environmental future for the area. With high-quality, well-connected and sustainable communities making the Arc an even more beautiful place to live, work and visit.
Delivering the ambition
To achieve this ambition, the government alongside local partners, is going to:
Develop a Spatial Framework for the Arc; a long-term strategic plan to help coordinate the infrastructure, environment and new developments in the area. We are committed to working with local communities throughout so we can create beautiful and sustainable places for residents and workers to enjoy.
Explore the creation of an Arc Growth Body; that would be a clear economic leadership voice for the Arc, championing its talent and assets internationally, supporting businesses, and fostering innovation.
Areas of focus
Productivity and jobs
The Arc currently generates over £110 billion to the UK economy every year.
The Arc has the potential to become a world-leading and globally renowned centre for business, innovation and investment in a variety of industries, including AI (Artificial Intelligence), advanced manufacturing and life sciences.
Placemaking
With a strategic approach to planning for growth, we can enhance the area’s natural environment and biodiversity, ensure communities and businesses have access to the infrastructure they need, and ensure new development is more affordable and beautiful so that it enhances places across the Arc.
Infrastructure and connectivity
Improving connectivity across the Arc with a new rail line between Oxford, Milton Keynes and Cambridge will link communities with employment and leisure opportunities.
While integrating sustainable and accessible transport options will support our ambition for the Arc and ensure homes and employment sites are situated in the right places.
Environment
Encouraging clean growth and the creation of sustainable communities will support us in improving the quality of life for those that live and work in the Arc. While also helping us future-proof its businesses and communities against the effects of climate change.
Key documents
Created by davidsecher@gmail.com // 1 thread
This is probably an old issue, but I only discovered this cycleway on Sunday. I very nearly had a bad accident cycling through the pinch point (pram arms) at the Dry Drayton end of the Bar Hill Cycleway. There are many photos on Cycle Street's photomap (e.g. 26327) that illustrate the invisibility in the shade of the metal arms. No signage or reflective tape to warn of the hazard. For me, this is MUCH more dangerous than the A14 bridges. (I have signed the petition and attended the Highways meeting.) Similar obstruction towards Bar Hill too, but by then I knew to walk the bike through!
Created by Steven Moseley // 1 thread
CONVERSION OF EXISTING GROUND FLOOR D2 USE INTO 4 APARTMENTS
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout