Eastbound route sign missing at The Boundary / Cotton Road
The eastbound cycle / pedestrian route sign at the junction between The Boundary and Cotton Road has gone missing. Thus the route directions aren't complete.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Gregory Williams // 1 thread
The eastbound cycle / pedestrian route sign at the junction between The Boundary and Cotton Road has gone missing. Thus the route directions aren't complete.
Created by Gregory Williams // 1 thread
The westbound sign at the Cow Lane / Cotton Road junction is not bifacial, thus only benefits people already cycling along Cotton Road, not those approaching along Cow Lane from the south.
Created by Gregory Williams // 1 thread
The vegetation beside NCR1 around the bottom edge of Duke's Meadow is encroaching upon the path. This is making it noticeably narrower and gives blind corners for cyclists and pedestrians approaching one another.
Created by Gregory Williams // 1 thread
The small cycle sign at the Westgate Court Avenue / Fisher Road junction, part of the cycle route between Archbishop's School and Canterbury Academy, is facing the wrong direction. Thus cyclists may get lost. It should be facing south into Fisher Road for cyclists approaching along Westgate Court Avenue from past the cemetery.
Created by Gregory Williams // 0 threads
A cycle barrier on the path beside the Victoria Hotel makes access more difficult for trailers and tandems.
Created by Gregory Williams // 0 threads
Large cracks are forming on the path near the top of the hill. These may cause people to slip or trip. If they widen further then bicycle wheels may become caught.
Created by Gregory Williams // 1 thread
When emerging from Stream Walk onto Old Bridge Road the NE-bound sign isn't visible. The sign is hidden behind a large hedge. Thus cyclists not familiar with the route may need to stop to find the sign in order to avoid getting lost.
Created by Gregory Williams // 1 thread
Vegetation is reducing the width of NCR1 between Invicta Way and Thanet Way. This makes it difficult for cyclists and pedestrians to pass one another.
Created by Gregory Williams // 1 thread
The signage for the Tannery Field (aka Bull Field) shared cycle / foot path has gone missing. Therefore it's not clear to all users that it's a shared cycle path.
Created by Gregory Williams // 1 thread
The wheeling strip on the steps at each end of the bridge over the Canterbury East railway line can be difficult to use because it is narrow and the handrail can get in the way of handlebars.
Created by Gregory Williams // 0 threads
The Lansdown Road path has a cycle barrier which makes access for people on tandems or with trailers more difficult.
Created by Gregory Williams // 0 threads
Public footpath CC22 would provide a good shared cycle path link between Sturry Road and Forrester Close and Brymore Road. Its location is particularly suited if the adjacent Territorial Army barracks should ever come up for redevelopment.
Created by Gregory Williams // 1 thread
The retail park at Stour Crescent has some front wheel cycle parking outside of Matalan and a couple of stands located adjacent to staff car parking spaces at McDonalds. These are all situated near the far end of the retail park and aren't particularly well surveilled. Stands nearer to the shop entrances would improve the provision here.
Created by Gregory Williams // 1 thread
There is no cycle parking at Canterbury Retail Park.
Created by Gregory Williams // 1 thread
Cars parking across the end of Bird Cage Walk at school leaving time make the path less accessible and more dangerous for cyclists and pedestrians.
Created by Gregory Williams // 1 thread
The Bird Cage Walk cycle path stops short of properly serving Hales Place. Cycling through the Farleigh Road underpass isn't indicated at permitted, nor is cycling to the road at Hever Place. There is prospect that a better cycle connection for Hales Place could be developed, keeping cyclists away from motor vehicles.
Created by Gregory Williams // 1 thread
There isn't any cycle parking at St. Stephen's Community Centre.
Created by Gregory Williams // 1 thread
There isn't any cycle parking beside the Hales Place shop to encourage people to choose to cycle.
Created by Gregory Williams // 1 thread
Several barriers across the path at Hackington Place, where cyclists need to dismount for a short section, make access for tandems and cycles with trailers difficult.
Created by Gregory Williams // 1 thread
This pair of steps limit access between Canterbury's cycle network and The Old Tannery.
Created by Gregory Williams // 1 thread
Signs towards Sustrans routes to help divert cyclists away from the dangerous A2 dual carriageway.
However, the routes shown aren't totally accurate. All of the best routes for these destinations will head towards and onto NCR18. First, turn right onto the A28 at the traffic lights (walk across using the nearby controlled crossing if needed), then turn left into Ten Perch Road. Head across at the first roundabout, then almost across (11 o'clock position) onto shared cycle path at the second roundabout. This leads to NCR18 (Great Stour Way). At the T-junction with the Great Stour Way, turn left to head towards Chartham and Ashford. Turn right to head into Canterbury and towards Whitstable (via NCR1) and RCR16 (via NCR1 bound towards Sandwich (Not towards Whitstable when you see the signs)).
The pictured sign needs correcting, and the onward signs need to be added, since they're not present.
Created by Gregory Williams // 1 thread
Steps at each end of Tonford Lane bridge make it difficult to take wheeled modes of transport such as bicycles, scooters, push chairs, wheelchairs, and mobility scooters from one side of the river to the other.
sound+fury // 1 thread
Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).
163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN
Cambridge
Application reference : 23/03068/FUL
Created by Gregory Williams // 1 thread
There isn't any cycle parking serving the shops on the upper portion of St. Dunstan's Street.
Created by Gregory Williams // 1 thread
The is no cycle parking serving the shops at Hales Drive, despite there being sufficient space for stands and the shops being adjacent to Canterbury's cycle network.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout