21/04797/FUL: 2no. dwellings. 200 Perne Road
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Created by Steven Moseley // 1 thread
Land Adjacent Hospytts, The Causeway, Great Horkesley CO6 4AD
Created by Steven Moseley // 1 thread
Proposal for 9 dwellings consisting of 4 x 3 bed houses and 4 x 2 bed apartments and 1 x 1 bed apartment.
Created by Steven Moseley // 1 thread
Demolition of existing Rugby clubhouse and erection of a new two storey community centre with associated parking and landscaping.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A new thread for discussions related to the Cambridgeshire and Peterborough Combined Authority, the strategic transport authority for our region.
Change of use from agricultural land for the construction of an A10 bridge structure with associated earthworks embankment bridge landing, construction of a shared use route for non-motorised users between the Waterbeach Barracks site and Green End including a 3m shared footway cycleway and 2m grassed verge for equestrians and 1m grassed verge, hard and soft landscaping, lighting, construction compound and temporary haul roads
Land Between Green End And The Waterbeach Barracks Site Waterbeach Cambridge Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 21/04625/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Transport in the March area (March North and Waldersley, March South and Rural, Whittlesey South) has been under review.
sound+fury // 1 thread
Part demolition of the existing Romsey Labour Club building with retention of the BLI historic frontage and erection of 44no. serviced apartments (sui generis use class) along with a cafe, gymnasium, community space, and associated infrastructure and landscaping.
Romsey Labour Club Mill Road Cambridge CB1 3NL
Cambridge
Application reference : 21/04559/FUL
Created by Steven Moseley // 1 thread
Outline planning application for 30 dwellings and 1ha of public open space and access from Newbarn Road. Some matters reserved.
Created by Steven Moseley // 1 thread
Demolition of existing dwelling and its replacement with a new dwelling
The existing mini-roundabouts are relatively easy to navigate for confident cyclists only. Any future segregated route along Berechurch Hall Road will require improvements.
Created by Steven Moseley // 1 thread
This junction is fast, dangerous, and over-complicated. It should be improved to better handle the current and future traffic, and cycle and pedestrian movements.
CBC cycling SPD route no. 9 (bidirectional segregated) along Berechurch Hall Road between Layer Rd. and Garrison path at junction with Berechurch Rd. should be provided.
Created by Steven Moseley // 1 thread
Created by Steven Moseley // 1 thread
The barrier should be removed (8.3)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.